← Back
Garage, residential, tax class 1
5 NOEL AVENUE
BROOKLYN · BIN 3248670
💬 Discuss this project
1950Year Built
—Stories
G0Building Class
R4-1Zoning
0 sfGross Floor Area
0Units
Garage, residential, tax class 1 · Owner of record: GERRITSEN BEACH DEVELOPMENT LLC · 1,800 sf lot · 0 FAR built
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 3Under Construction1p · 1 filing · 20 docs
Floor 2
Floor 1
CellarUnder Construction2p · 1 filing · 20 docs
1 job · most recent 02/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedSAVION CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU18RLXFZ 22,000 BTU · Condensing Unit ×2
1 job · most recent 02/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/18/2026——Storm, Water/Sanitary
1 job · most recent 02/18/2026
Steel Masonry Wood
FiledStatusContractorScope
02/18/2026Permit IssuedSAVION CONSTRUCTION INCSteel, Masonry, Wood
Building Lifecycle
All (58)Filed (8)Permit Issued (2)Objection (18)Special Inspection (30)
04/15/2026
Permit issued — Construction Fence
B01185339-S1-FN
03/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/13/2026
Special inspection requirement — Metering
03/13/2026
Special inspection requirement — Permanent certificate
03/13/2026
Special inspection requirement — Insulation placement and R values
03/13/2026
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/13/2026
Special inspection requirement — Maintenance information
03/13/2026
Special inspection requirement — Air barrier — testing
03/13/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/13/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
03/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/13/2026
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
03/13/2026
Special inspection requirement — Masonry
Younes Abouyaala
03/13/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
03/13/2026
Special inspection requirement — Lowest Floor Elevation
Younes Abouyaala
03/13/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/13/2026
Special inspection requirement — Interior lighting power
03/13/2026
Special inspection requirement — Fenestration air leakage
03/13/2026
Special inspection requirement — Fenestration areas
03/13/2026
Special inspection requirement — Air barrier - visual inspection
03/13/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
03/02/2026
Objection resolved — Addressed
02/24/2026
Objection raised — Energy
02/18/2026
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-S5
02/17/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Addressed
02/03/2026
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-P2
02/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
02/03/2026
Special inspection requirement — Insulation placement and R values
02/03/2026
Special inspection requirement — Air barrier - visual inspection
02/03/2026
Special inspection requirement — Permanent certificate
02/03/2026
Special inspection requirement — Structural Steel - Details
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/03/2026
Special inspection requirement — Fenestration areas
12/30/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/10/2025
Objection raised — Scope
06/10/2025
Objection raised — Scope
06/10/2025
Objection raised — Scope
06/02/2025
Objection raised — Other
06/02/2025
Objection raised — Other
05/27/2025
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-S4
05/12/2025
Objection raised — Other
05/07/2025
Objection raised — Other
05/01/2025
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-S1
05/01/2025
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-S2
05/01/2025
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-S3
04/30/2025
Permit issued — Full Demolition
B01124686-I1-FD
02/27/2025
Filed — New Building
INSTALL CURB CUT AS PER PLANS
B01185339-I1
02/20/2025
Objection resolved — Addressed
01/23/2025
Objection raised — Other
01/15/2025
Filed — Full Demolition
demolition of a Garage next to one family demo application # B01119315
B01124686-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAVION CONSTRUCTION2107/05/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRICOLAGE DESIGNS802/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP103/21/2026
BRICOLAGE DESIGNS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAVION CONSTRUCTION INCGeneral Contractor207/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519102/27/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSAVION CONSTRUCTION INC04/15/2026
DOB NOWFull DemolitionPermit IssuedSAVION CONSTRUCTION INC04/30/2025
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
03/13/2026Structural Cold-Formed SteelYounes Abouyaalaspecial
03/13/2026Electric vehicle service equipment requirements—energy_progress
03/13/2026Metering—energy_progress
03/13/2026Fenestration and door U-factor and product ratings—energy_progress
03/13/2026Insulation placement and R values—energy_progress
03/13/2026Air barrier — testing —energy_progress
03/13/2026Air barrier - visual inspection—energy_progress
03/13/2026Fenestration areas—energy_progress
03/13/2026Maintenance information—energy_progress
03/13/2026Fenestration air leakage—energy_progress
03/13/2026Interior lighting power—energy_progress
03/13/2026Permanent certificate—energy_progress
03/13/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/13/2026FinalNAVEEN KUMARprogress
03/13/2026Lowest Floor ElevationYounes Abouyaalaprogress
03/13/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/13/2026Footing and FoundationYounes Abouyaalaprogress
03/13/2026MasonryYounes Abouyaalaspecial
03/13/2026Subgrade InspectionsYounes Abouyaalaspecial
03/13/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
03/13/2026Structural Steel - DetailsYounes Abouyaalaspecial
03/13/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/13/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
02/03/2026Interior lighting power—energy_progress
02/03/2026Concrete - Cast-In-Place—special
Latest 25 of 90.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01124686-I1Request digital key ↗
08/22/2026B01185339-S1Request digital key ↗
08/22/2026B01185339-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01185339-P1Open ↗
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01185339-I1Open ↗
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B01185339-I1Open ↗
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026B01185339-I1Open ↗
08/22/2026B01185339-S1Open ↗
08/22/2026B01185339-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01185339-I1Open ↗
08/23/2026B01185339-I1Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01124686-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B01185339-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B01185339-I1Open ↗
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01124686-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01124686-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-P1Open ↗
08/13/2026B01185339-I1Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification4
08/23/2026B01124686-I1Open ↗
08/22/2026B01185339-P2Open ↗
08/22/2026B01185339-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B01185339-I1Open ↗
08/13/2026B01185339-P1Open ↗
08/13/2026B01185339-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01185339-P2Open ↗
08/13/2026B01185339-I1Open ↗
08/13/2026B01185339-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01124686-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01185339-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01124686-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01124686-I1Open ↗