RoofUnder Construction16p · 9 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
12 documents · 1 drawing sheet
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 4 drawing sheets
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 39Under Construction89p · 5 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 7 drawing sheets
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS ON MONORAIL, PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
39 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 38Under Construction119p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
26 documents
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 11 drawing sheets
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 3 drawing sheets
Floor 3753p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON FLOORS 33, 35, 36, & 37 AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
12 documents · 2 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 33 AND 37 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
8 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3648p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 35 AND 36 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON FLOORS 35 AND 36 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3549p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON FLOORS 33, 35, 36, & 37 AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
12 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 35 AND 36 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3474p · 15 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 34TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
13 documents · 4 drawing sheets
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
General construction modifications taking place on 34th floor for change of use and population increase.
On file for this job
44 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3350p · 14 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON FLOORS 33, 35, 36, & 37 AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
12 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 33 AND 37 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
8 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3246p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3146p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3053p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
PLUMBING MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE FROM FLOORS 30 TO 32 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 29Under Construction140p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 10 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
PLUMBING MODIFICATIONSTAKING PLACE ON THE 29TH, 33th, 34th, 35th, 36th & 37th Floors AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 28Under Construction143p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 9 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 27Under Construction142p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 8 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 26Under Construction138p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 4 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 25Under Construction145p · 9 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 9 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 24Under Construction143p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 9 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 23Under Construction169p · 9 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 8 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 22Under Construction163p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 21Under Construction165p · 9 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 20Under Construction133p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 5 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 19Under Construction134p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 18Under Construction136p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 8 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 17Under Construction133p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 16Under Construction135p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 15Under Construction133p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
EQUIPMENT USE CARS 1&2: DUAL 7000 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
9 documents · 1 drawing sheet
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 6 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
Latest 3 of 8 filings on this floor.
Floor 14Under Construction136p · 7 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 10 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 7 filings on this floor.
Floor 13Under Construction135p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 7 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 12Under Construction133p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 5 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 11Under Construction133p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 5 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 10Under Construction144p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 17 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 9Under Construction145p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 16 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 8Under Construction145p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 16 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 7Under Construction144p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 12 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
Floor 6Under Construction149p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 13 drawing sheets
General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 1 drawing sheet
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this job
24 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 513p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this job
12 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
8 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 5-28, 39 AND ROOF AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4251p · 20 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
PLUMBING MODIFICATIONS TAKING PLACE ON THE 3RD AND 4TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 3RD AND 4TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
8 documents · 2 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this job
49 documents · 25 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3181p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
8 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 3RD AND 4TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2Under Construction162p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 14 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
9 documents · 1 drawing sheet
MECHANICHAL MODIFICATIONS TAKING PLACE ON FLOORS 5-28, 39 AND ROOF AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1Under Construction203p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 19 drawing sheets
APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE & TEMPORARY SHANTIES.NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
On file for this job
2 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY BETAMAX MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
On file for this job
14 documents
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction169p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MPP #326. Sprinkler work as shown on plans filed herewith.
On file for this job
14 documents
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 20 drawing sheets
MPP PROJECT #326. Alteration and conversion of an existing office building to residential on floors 30-37.
On file for this job
15 documents
Latest 3 of 6 filings on this floor.
Cellar285p · 14 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Plumbing modifications taking place in the sub-cellar and cellar as per drawings filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE IN THE SUB-CELLAR AND CELLAR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 3 drawing sheets
MECHANICAL MODIFICAITIONS TAKING PLACE IN THE SUB-CELLAR AND CELLAR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
14 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction279p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans filed herewith.
On file for this job
112 documents · 22 drawing sheets
Plumbing modifications taking place in the sub-cellar and cellar as per drawings filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE IN THE SUB-CELLAR AND CELLAR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.