Large suburban residence
50-10 PARSONS BOULEVARD
QUEENS · East Flushing · BIN 4118103
💬 Discuss this project
2023Year Built
2.5Stories
A3Building Class
R2AZoning
3,345 sfGross Floor Area
1Units
Large suburban residence · Owner of record: 5010 PARSONS LLC · 7,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 2Under Construction73p · 1 filing · 20 docs
Floor 1Under Construction85p · 1 filing · 20 docs
CellarUnder Construction74p · 1 filing · 20 docs
Site & exteriorUnder Construction47p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/25/2021$1.1M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.1104/20/2026
PARKER AND WEST ENGINEERING, PLLC101/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDA DESIGN2003/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TJAR GROUP CORPGeneral Contractor507/08/2026
PRIMROSE SERVICE INCGeneral Contractor404/09/2026
T&I CONSTRUCTION INCGeneral Contractor207/28/2026
VILLAGE P & H NY INCPlumbing107/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
WASOFF PLBG & UTILITY COPlumbing106/28/2026
VILLAGE P & H NY INCFire Protection107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669504/20/2026
M. INT'L ENGINEERING PLLC3129108/05/2025
PARKER AND WEST ENGINEERI5272101/31/2025
S&S CONCRETE & SOIL TESTI1008303/21/2024
NKM ENGINEERING PLLC6244210/25/2022
Building Lifecycle
All (95)Filed (12)Permit Issued (16)Signed Off (3)Inspection (12)Objection (22)Special Inspection (30)
07/27/2026
Permit issued — Mechanical Systems
Q00520212-I1-GC
04/20/2026
Filed — New Building
Herewith Filing New Building application for one(1) family two (2) story residential building with attic and cellar. Obtain new certificate of occupancy.
Q00520212-P7
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
04/02/2026
Special inspection requirement — Protection of exposed foundation insulation
ZHENHUAN XU
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
04/02/2026
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
04/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
ZHENHUAN XU
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
04/02/2026
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
04/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
ZHENHUAN XU
04/02/2026
Special inspection requirement — Permanent certificate
ZHENHUAN XU
04/02/2026
Special inspection requirement — Final
ZHENHUAN XU
04/02/2026
Special inspection requirement — Sprayed fire-resistant materials
ZHENHUAN XU
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
04/02/2026
Special inspection requirement — Interior lighting power
ZHENHUAN XU
04/02/2026
Special inspection requirement — Metering
ZHENHUAN XU
04/02/2026
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
04/02/2026
Special inspection requirement — Maintenance information
ZHENHUAN XU
04/02/2026
Special inspection requirement — Fenestration areas
ZHENHUAN XU
04/02/2026
Special inspection requirement — Insulation placement and R values
ZHENHUAN XU
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
04/02/2026
Special inspection requirement — Air barrier — testing
ZHENHUAN XU
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/20/2026
Signed off — New Building
Herewith Filing New Building application for one(1) family two (2) story residential building with attic and cellar. Obtain new certificate of occupancy.
Q00520212-S3
03/13/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/02/2026
Permit issued — Curb Cut
Q00520212-S3-CC
01/08/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2025
Objection resolved — Addressed
08/15/2025
Objection raised — Scope
08/05/2025
Filed — New Building
Herewith Filing New Building application for one(1) family two (2) story residential building with attic and cellar. Obtain new certificate of occupancy.
Q00520212-P6
07/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2025
Permit issued — Sprinklers
Q00520212-S1-EW-SP
06/27/2025
Permit issued — Sprinklers
Q00520212-S1-PL
05/19/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01173830-I1
02/10/2025
Permit issued — Solar
Q01173830-I1-SL
01/31/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01173830-I1
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/29/2025
Special inspection requirement — Final
Walid Abdulla
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/20/2025
Signed off — Alteration
Q00538194-I1
05/17/2024
Permit issued — Mechanical Systems
Q00520212-I1-MS
05/17/2024
Permit issued — General Construction
Q00520212-I1-GC
04/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/01/2024
Permit issued — Foundation
Q00520212-S2-GC-CX
04/01/2024
Permit issued — Construction Fence
Q00538194-I1-FN
03/21/2024
Filed — New Building
Herewith Filing New Building application for one(1) family two (2) story residential building with attic and cellar. Obtain new certificate of occupancy.
Q00520212-P4
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
03/12/2024
Special inspection requirement — Sprinkler Systems
GLEN LANGER
03/12/2024
Special inspection requirement — Metering
GLEN LANGER
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedT&I CONSTRUCTION INC07/27/2026
DOB NOWCurb CutSigned-offT&I CONSTRUCTION INC03/02/2026
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL06/30/2025
DOB NOWSprinklersPermit IssuedWASOFF PLBG & UTILITY CO06/27/2025
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/10/2025
DOB NOWMechanical SystemsPermit IssuedPRIMROSE SERVICE INC05/17/2024
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC05/17/2024
DOB NOWFoundationPermit IssuedPRIMROSE SERVICE INC04/01/2024
DOB NOWConstruction FenceSigned-offPRIMROSE SERVICE INC04/01/2024
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP11/03/2023
DOB NOWFoundationPermit IssuedTJAR GROUP CORP11/02/2023
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC02/27/2023
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC02/27/2023
DOB NOWStructuralPermit IssuedTJAR GROUP CORP10/26/2022
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP06/09/2022
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP06/16/2021
BIS—ISSUEDTJAR GROUP CORP02/28/2022
BIS—ISSUEDTJAR GROUP CORP02/28/2022
1 project · most recent 04/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2026Permit IssuedT&I CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric MLZ-KX09NL 9,000 BTU · Split System ×5
MLZ-KX12NL 12,000 BTU · Fan Coil Indoor ×2
MITSUBISHI_MXZ-SM48NAM 48,000 BTU · Heat Pump Outdoor ×1
MLZ-KX18NL 18,000 BTU · Split System ×1
Mitsubishi_MXZ-SM60NAM 60,000 BTU · Heat Pump Outdoor ×1
Gree Gree_GMV-28WL/C-T(U) 28,000 BTU · Vrf Outdoor ×2
duc09hp230v1ah 9,000 BTU · Fan Coil Indoor ×2
duc18hp230v1ah 18,000 BTU · Fan Coil Indoor ×1
Daikin CTX09AXVJU 9,000 BTU · Fan Coil Indoor ×1
CTX12AXVJU 12,000 BTU · Fan Coil Indoor ×1
York AP60DX21 5 tons · Ahu ×4
YFD60B21S 5 tons · Condensing Unit ×4
Ventilation
Floaire CFA-HE-FA 50 CFM · Exhaust Fan ×24
1 project · most recent 04/20/2026
Sprinkler System
FiledStatusContractorScope
04/20/2026Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 04/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/20/2026Permit IssuedWASOFF PLBG & UTILITY COGas, Storm, Water/Sanitary
2 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
01/31/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/08/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/26/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
04/02/2026Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
04/02/2026Mechanical SystemsZHENHUAN XUspecial
04/02/2026Sprayed fire-resistant materialsZHENHUAN XUspecial
04/02/2026Energy Code Compliance InspectionsZHENHUAN XUprogress
04/02/2026FinalZHENHUAN XUprogress
04/02/2026Fire-Resistance Rated ConstructionZHENHUAN XUprogress
04/02/2026Duct leakage testing, insulation and designZHENHUAN XUenergy_progress
04/02/2026Fenestration air leakageZHENHUAN XUenergy_progress
04/02/2026Electric vehicle service equipment requirementsZHENHUAN XUenergy_progress
04/02/2026Permanent certificateZHENHUAN XUenergy_progress
04/02/2026HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
04/02/2026Protection of exposed foundation insulationZHENHUAN XUenergy_progress
04/02/2026Interior lighting powerZHENHUAN XUenergy_progress
04/02/2026HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
04/02/2026Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
04/02/2026MeteringZHENHUAN XUenergy_progress
04/02/2026Air barrier - visual inspectionZHENHUAN XUenergy_progress
04/02/2026Maintenance informationZHENHUAN XUenergy_progress
04/02/2026Fenestration areasZHENHUAN XUenergy_progress
04/02/2026Insulation placement and R valuesZHENHUAN XUenergy_progress
04/02/2026HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
04/02/2026Air barrier — testing ZHENHUAN XUenergy_progress
01/29/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/29/2025Energy Code Compliance InspectionsWalid Abdullaprogress
Latest 25 of 64.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026Q00538194-I1Request digital key ↗
08/21/2026Q01173830-I1Request digital key ↗
08/17/2026Q00520212-P6Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
09/01/2022440739257Open ↗
06/23/2021421789684Open ↗
06/23/2021421789693Open ↗
▸BISWORK PERMIT APPLICATION2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/18/2022440739257Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWRestrictive Declaration/Easement 110
08/17/2026Q00520212-P7Open ↗
08/17/2026Q00520212-P3Open ↗
08/17/2026Q00520212-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q00520212-P7Open ↗
08/17/2026Q00520212-I1Open ↗
08/13/2026Q00520212-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00520212-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00538194-I1Open ↗
08/17/2026Q00520212-P4Open ↗
08/17/2026Q00520212-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/21/2026Q00520212-P7Open ↗
09/21/2026Q00520212-P7Open ↗
09/01/2026Q00520212-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/21/2026Q00520212-P7Open ↗
09/01/2026Q00520212-P4Open ↗
08/28/2026Q00520212-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/01/2022440739257Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/01/2022440739257Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026Q00520212-I1Open ↗
08/17/2026Q00520212-S2Open ↗
08/13/2026Q00520212-P2Open ↗
Showing 3 of 4 on file for this type
▸BISGAS CUT-OFF2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISSEWER CUT-OFF2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist5
08/17/2026Q00520212-P7Open ↗
08/17/2026Q00520212-S2Open ↗
08/17/2026Q00520212-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00520212-I1Open ↗
08/13/2026Q00520212-S2Open ↗
▸BISSTREET TREE CHECKLIST1
10/08/2022440739257Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/08/2022440739257Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/03/2022421789693Open ↗
06/03/2022421789693Open ↗
06/03/2022421789693Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISDOB APPROVAL FOR NEW CC1
10/08/2022440739257Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01173830-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION2
10/18/2022440739257Open ↗
10/08/2022440739257Open ↗
▸BISBOROUGH INTAKE FORM2
06/03/2022421789693Open ↗
06/03/2022421789684Open ↗
▸BISEFILING COVER SHEET2
06/23/2021421789684Open ↗
06/23/2021421789693Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/01/2022440739257Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/01/2022440739257Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026Q00520212-I1Open ↗
08/17/2026Q00520212-P7Open ↗
08/17/2026Q00520212-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/17/2026Q00520212-P7Open ↗
08/17/2026Q00520212-S2Open ↗
08/13/2026Q00520212-P2Open ↗
Showing 3 of 4 on file for this type
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
10/08/2022440739257Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/08/2022440739257Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/01/2022440739257Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/01/2022440739257Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00520212-S2Open ↗