Elevator apt, semi-fireproof with stores
Fifty11
50-17 QUEENS BOULEVARD · BIN 4618650
💬 Discuss this project
2019Year Built
9Stories
D7Building Class
R7XZoning
80,171 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 50-11 QUEENS BOULEVARD, LLC · 11,945 sf lot · 6.71 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1107/08/2026
SUNLIGHT CONSTRUCTION H.A1503/22/2026
50-11 QUEENS BOULEVARD2703/22/2026
ROCK GROUP NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO403/21/2026
AE DESIGN SOLUTION603/21/2026
L Z CONSTRUCTION NY203/21/2026
RAYMOND CHAN ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNLIGHT CONSTRUCTION AAGeneral Contractor907/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor907/08/2026
M J DESIGN AND BUILD INCGeneral Contractor407/08/2026
RIGHTWAY ELECTRICAL INCElectrical103/22/2026
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LI ARCHITECT ASSOCIATE, P1104602/07/2023
HRF SERVICES CORP5616104/19/2022
Building Lifecycle
All (156)Filed (14)Permit Issued (16)Signed Off (7)Violation (51)Inspection (10)Objection (40)Special Inspection (18)
02/10/2026
Violation issued (HPD, closed)
C
10/08/2025
Violation issued (HPD, open)
C
12/02/2024
Violation issued (HPD, closed)
I
10/01/2024
Violation issued (ECB, open)
Construction
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
A
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
C
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
05/30/2024
Violation issued (HPD, closed)
A
04/17/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
C
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
C
03/21/2024
Violation issued (HPD, closed)
A
03/21/2024
Violation issued (HPD, closed)
A
03/05/2024
Violation issued (HPD, closed)
A
03/05/2024
Violation issued (HPD, closed)
A
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
C
11/28/2023
Objection raised — Scope
11/28/2023
Objection raised — Scope
11/11/2023
Filed — Alteration
FILE APPLICATION TO ADD PARTIAL 2ND TO 8TH FLOOR PLANS, DETAILS OF MAILBOX, ELEVATOR, TOILET & KITCHEN IN CONJUNCTION WITH NB #: 421625245. THESE DRAWINGS WERE PROVIDED AS CONSTRUCTION DOCUMENTS, AND PER HPD, THEY NEED TO BE APPROVED.
Q00961447-I1
11/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/11/2023
Special inspection requirement — Final
10/10/2023
Objection raised — Admin
10/10/2023
Objection raised — Cost
10/04/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BATHROOMS, CABINETS, KITCHEN, DISPOSAL ROOM, ELEVATOR, & DISPOSAL ROOM, REPAIRING CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00941884-I1
03/31/2023
Violation issued (HPD, closed)
A
03/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2023
Objection resolved — Addressed
02/17/2023
Objection raised — Structural
02/07/2023
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT RETAIL STORES TO CHILD DAYCARE CENTER AT 001 AND 002 FLOOR, OBTAIN NEW C OF O.
Q00681552-P5
12/07/2022
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT RETAIL STORES TO CHILD DAYCARE CENTER AT 001 AND 002 FLOOR, OBTAIN NEW C OF O.
Q00681552-P3
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ling Li
12/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Ling Li
12/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
Ling Li
12/07/2022
Special inspection requirement — Air barrier - visual inspection
Ling Li
12/07/2022
Special inspection requirement — Lighting controls
Ling Li
11/16/2022
Signed off — Alteration CO
INTERIOR RENOVATION TO CONVERT RETAIL STORES TO CHILD DAYCARE CENTER AT 001 AND 002 FLOOR, OBTAIN NEW C OF O.
Q00681552-S2
11/16/2022
Signed off — Alteration CO
INTERIOR RENOVATION TO CONVERT RETAIL STORES TO CHILD DAYCARE CENTER AT 001 AND 002 FLOOR, OBTAIN NEW C OF O.
Q00681552-S1
11/16/2022
Violation issued (HPD, closed)
I
11/08/2022
Objection resolved — Addressed
11/07/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Scope
11/02/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/02/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2022
Objection resolved — Addressed
10/28/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/28/2022
Objection raised — Scope
10/28/2022
Objection raised — Fire_Protection
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offM J DESIGN AND BUILD INC06/01/2022
DOB NOWSprinklersSigned-offT & T PLUMBING INC05/20/2022
DOB NOWPlumbingSigned-offVIP FIRE SPRINKLER INC05/19/2022
DOB NOWMechanical SystemsSigned-offM J DESIGN AND BUILD INC05/19/2022
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY04/11/2022
DOB NOWCurb CutSigned-offSUNLIGHT CONSTRUCTION AA05/17/2021
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA10/28/2020
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA08/26/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/30/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING07/17/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/01/2020
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA10/15/2019
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA08/28/2019
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING08/01/2019
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/31/2019
DOB NOWConstruction FenceSigned-offSUNLIGHT CONSTRUCTION AA12/14/2018
BISPLISSUEDFLYTIGER P & H LTD02/17/2021
BISPLISSUEDFLYTIGER P & H LTD01/15/2021
BISSDISSUEDFLYTIGER P & H LTD12/22/2020
BISSDISSUEDFLYTIGER P & H LTD11/02/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA10/27/2020
BISPLISSUEDFLYTIGER P & H LTD02/10/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA11/27/2019
BISSDISSUEDFLYTIGER P & H LTD11/25/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/30/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/30/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/23/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA04/08/2019
BISPLISSUEDFLYTIGER P & H LTD03/29/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA03/21/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA03/21/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/04/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/04/2019
BISSDISSUEDL&J PLG & HTG CO OF NY IN01/03/2019
BISEQISSUEDROCK GROUP NY CORP12/19/2016
1 project · most recent 02/07/2023
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/07/2023Signed-offM J DESIGN AND BUILD INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric SPLIT SYSTEM 30,000 BTU · Split System ×18
PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×8
Ventilation
Greenheck CEILING FAN 180 CFM · Exhaust Fan ×18
1 project · most recent 02/07/2023
Sprinkler System
FiledStatusContractorScope
02/07/2023Signed-offVIP FIRE SPRINKLER INCSprinkler System
1 project · most recent 02/07/2023
Water/Sanitary
FiledStatusContractorScope
02/07/2023Signed-offPIPESTYLISTS, INCWater/Sanitary
7 projects · most recent 03/31/2022
General Wiring
FiledStatusContractorScope
03/31/2022CompleteJ Y ELECTRIC INCGeneral Wiring
03/02/2022CompleteJ Y ELECTRIC INC—
04/05/2021CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
09/21/2019CompleteKWONG MING ELECTRIC INC—
07/19/2019CompleteKWONG MING ELECTRIC INC—
06/26/2019CompleteRIGHTWAY ELECTRICAL INC—
05/29/2019CompletePOWER SURGE ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/02/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
06/24/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
06/11/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
05/19/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/11/2023Tenant Protection Plan Compliance—special
11/11/2023Final—progress
12/07/2022Fire-Resistant Penetrations and JointsLing Lispecial
12/07/2022Energy Code Compliance InspectionsLing Liprogress
12/07/2022Fire-Resistance Rated ConstructionLing Liprogress
12/07/2022Air barrier - visual inspectionLing Lienergy_progress
12/07/2022Lighting controlsLing Lienergy_progress
10/21/2022Mechanical SystemsLing Lispecial
10/21/2022FinalLing Liprogress
10/21/2022Fire-Resistant Penetrations and JointsLing Lispecial
10/21/2022Energy Code Compliance InspectionsLing Liprogress
10/21/2022Fire-Resistance Rated ConstructionLing Liprogress
10/21/2022Air barrier - visual inspectionLing Lienergy_progress
10/21/2022Lighting controlsLing Lienergy_progress
04/18/2022Sprinkler SystemsFAHAD FATEHspecial
07/31/2019FinalJULIO SALCEDO-FERNANDEZprogress
05/24/2019FinalJULIO SALCEDO-FERNANDEZprogress
12/12/2018FinalFran Huangprogress
▾Documents — 237 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
08/26/2026Q00681552-P3Request digital key ↗
08/26/2026Q00681552-P1Request digital key ↗
08/24/2026Q00941884-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00172276-I1Request digital key ↗
08/28/2026Q00368669-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00109676-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00147456-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00203302-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION22
09/13/2021421625245Open ↗
06/17/2021421625245Open ↗
06/15/2021421655088Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION17
03/18/2021421625245Open ↗
12/05/2019421625245Open ↗
11/26/2019421717495Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/30/2021421655088Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/07/2021421625245Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
11/23/2021421625245Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/23/2021421625245Open ↗
▸BISZONING DIAGRAM1
12/15/2018421625245Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00681552-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00172276-I1Open ↗
08/28/2026Q00368669-I1Open ↗
08/24/2026Q00941884-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/27/2026Q00203302-I1Open ↗
08/26/2026Q00681552-P3Open ↗
08/26/2026Q00681552-P3Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
02/21/2019421625245Open ↗
01/10/2019421625245Open ↗
01/10/2019421625245Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026Q00681552-S1Open ↗
08/26/2026Q00681552-P3Open ↗
08/26/2026Q00681552-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/30/2019440559209Open ↗
01/05/2019421717495Open ↗
12/16/2016440368870Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/30/2019440559209Open ↗
12/16/2016440368870Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/30/2019440559209Open ↗
12/16/2016440368870Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/05/2019421717495Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
04/27/2021421625245Open ↗
02/04/2021421625245Open ↗
01/29/2021421625245Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/05/2019421717495Open ↗
12/03/2018421625245Open ↗
▸BISSTANDPIPE SYSTEMS1
05/20/2021421717495Open ↗
▸BISEQUIPMENT USE PERMITS1
12/20/2021421625245Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/14/2021421635421Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
01/10/2019421625245Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES SITE PLAN1
06/17/2021421625245Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/09/2019421625245Open ↗
▸BISSTREET TREE CHECKLIST1
06/10/2019421625245Open ↗
▸BISSTREET TREE SIGNOFF1
06/17/2021421625245Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00681552-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWOER: Notice to Proceed7
08/28/2026Q00172276-I1Open ↗
08/13/2026Q00681552-S1Open ↗
08/13/2026Q00147456-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/28/2026Q00172276-I1Open ↗
08/13/2026Q00368669-I1Open ↗
08/13/2026Q00681552-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
11/18/2021421625245Open ↗
06/14/2021421635421Open ↗
06/07/2021440559209Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
07/30/2019440559209Open ↗
06/10/2019421625245Open ↗
12/16/2016440368870Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/10/2019421625245Open ↗
01/10/2019421625245Open ↗
12/01/2018421625245Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/14/2021421625245Open ↗
06/08/2021421625245Open ↗
06/08/2021421625245Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/17/2021421625245Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00681552-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/14/2021421625245Open ↗
06/08/2021421625245Open ↗
06/08/2021421625245Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/17/2021421625245Open ↗
01/10/2019421625245Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/01/2018421625245Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/10/2019421625245Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/23/2021421625245Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/01/2018421625245Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/15/2018421625245Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION13
06/02/2021421625245Open ↗
12/05/2019421625245Open ↗
06/10/2019421655088Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/17/2021421635421Open ↗
06/14/2021440368870Open ↗
06/07/2021440559209Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/14/2021421625245Open ↗
01/05/2019421625245Open ↗
10/29/2018421625245Open ↗
▸BISSUPERSEDING LETTER2
11/26/2019421717495Open ↗
08/28/2019421625245Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/28/2019421625245Open ↗
04/18/2019421625245Open ↗
03/22/2019421625245Open ↗
▸BISCOST AFFIDAVIT2
01/05/2019421717495Open ↗
05/25/2018421635421Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
06/14/2021421635421Open ↗
06/02/2021421717495Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
03/22/2019421625245Open ↗
01/10/2019421625245Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/28/2019421625245Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION14
12/22/2021421625245Open ↗
12/22/2021421625245Open ↗
06/18/2021421655088Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET6
01/05/2019421717495Open ↗
12/03/2018421625245Open ↗
12/03/2018421625245Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
03/18/2021421625245Open ↗
07/19/2019421625245Open ↗
07/16/2019421625245Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/30/2019440559209Open ↗
12/16/2016440368870Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification6
08/26/2026Q00681552-P1Open ↗
08/26/2026Q00681552-P3Open ↗
08/15/2026Q00681552-P5Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
12/01/2018421625245Open ↗
▸BISSITE SURVEY: FINAL1
—421625245Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
12/16/2016440368870Open ↗
▸BISTCO - Supporting Documents1
12/22/2021421625245Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/09/2019421625245Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00681552-I1Open ↗