General warehouse
50-13 35 STREET
QUEENS · BIN 4307180
💬 Discuss this project
1988Year Built
1Stories
E1Building Class
M1-1Zoning
7,764 sfGross Floor Area
2Units
General warehouse · Owner of record: TERRA 35 LIC, LLC · 9,850 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof7p · 4 filings · 20 docs
Floor 115p · 5 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPITAL IMPROVEMENT SERVICES5807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EARTHMAN SOLUTIONS LLC1008/28/2024
KIMBERLY BROWN ARCHITECTURE207/02/2024
JACK GREEN ASSOCIATES508/22/2023
DAVID STERN ARCHITECTURE209/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERICAN GOTHAM CONSULTANTS1003/21/2026
DAVID STERN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPITAL IMPROVEMENT SERVICESGeneral Contractor1007/08/2026
TUMEN, INCGeneral Contractor407/08/2026
BEST PLUMBING & HVAC INCFire Protection107/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
A.M.J ELECTRIC CORPElectrical103/22/2026
METROCITY GROUP,INCPlumbing107/08/2026
N.Z. PILGRIM ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422708/28/2024
CL ENGINEERING P.C.6781207/02/2024
Building Lifecycle
All (77)Filed (18)Permit Issued (12)Signed Off (7)Inspection (10)Special Inspection (30)
10/01/2024
Signed off — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-I1
09/26/2024
Signed off — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-I1
09/25/2024
Signed off — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-I1
09/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2024
Filed — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-P2
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/28/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/28/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/28/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/28/2024
Special inspection requirement — Final
JACK GREEN
08/28/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
08/28/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/28/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/28/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/28/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
08/28/2024
Special inspection requirement — Final
JACK GREEN
08/28/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/28/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/22/2024
Signed off — Alteration
General Contruction of interior partitions and finishes for new ground floor commercial establishment..
Q00926963-I1
08/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/05/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/05/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/05/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/05/2024
Special inspection requirement — Final
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
08/05/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
07/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/25/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P4
07/18/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P3
07/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2024
Filed — Alteration
General Contruction of interior partitions and finishes for new ground floor commercial establishment..
Q00926963-P1
06/26/2024
Filed — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-P1
06/26/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P2
03/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P1
02/05/2024
Signed off — Alteration
installation of mechanical equipment on the roof. Demolition of existing mechanical system and installation of new HVAC system
Q00742905-I1
02/02/2024
Signed off — Alteration
Revised plans filed herewith to indicated new construction floor plan layout and elevations with all changes bubbled
Q00703149-I1
01/22/2024
Signed off — Alteration
added a hand sink, new lav , . All as shown on drawings filed herewith
Q00703171-I1
01/22/2024
Permit issued — Mechanical Systems
Q00742905-I1-MS
01/22/2024
Permit issued — General Construction
Q00703149-I1-GC
11/15/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/16/2023
Permit issued — Mechanical Systems
Q00933347-I1-MS
10/10/2023
Permit issued — Plumbing
Q00933371-I1-PL
10/10/2023
Permit issued — Sprinklers
Q00933427-I1-EW-SP
10/03/2023
Permit issued — General Construction
Q00926963-I1-GC
09/25/2023
Filed — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-I1
09/21/2023
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-I1
09/21/2023
Filed — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-I1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCAPITAL IMPROVEMENT SERVI01/22/2024
DOB NOWGeneral ConstructionSigned-offCAPITAL IMPROVEMENT SERVI01/22/2024
DOB NOWMechanical SystemsSigned-offTUMEN, INC10/16/2023
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC10/10/2023
DOB NOWSprinklersSigned-offBEST PLUMBING & HVAC INC10/10/2023
DOB NOWGeneral ConstructionSigned-offTUMEN, INC10/03/2023
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC09/29/2022
DOB NOWGeneral ConstructionSigned-offCAPITAL IMPROVEMENT SERVI06/23/2022
DOB NOWMechanical SystemsSigned-offCAPITAL IMPROVEMENT SERVI06/23/2022
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC06/03/2022
DOB NOWMechanical SystemsSigned-offCAPITAL IMPROVEMENT SERVI06/02/2022
DOB NOWGeneral ConstructionSigned-offCAPITAL IMPROVEMENT SERVI04/23/2022
3 projects · most recent 11/21/2023
General Wiring
FiledStatusContractorScope
11/21/2023Permit IssuedA.M.J ELECTRIC CORPGeneral Wiring
09/15/2023CompleteN.Z. PILGRIM ELECTRIC INC1 meters, 1 new_meters
07/31/2023CompleteN.Z. PILGRIM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - UndergroundPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
08/28/2024Maintenance informationJACK GREENenergy_progress
08/28/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
08/28/2024Shutoff dampersJACK GREENenergy_progress
08/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/28/2024Mechanical SystemsJACK GREENspecial
08/28/2024FinalJACK GREENprogress
08/28/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
08/28/2024Shutoff dampersJACK GREENenergy_progress
08/28/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/28/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
08/28/2024Maintenance informationJACK GREENenergy_progress
08/28/2024Post-installed AnchorsJACK GREENspecial
08/28/2024Heating SystemsJACK GREENspecial
08/28/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/28/2024Mechanical SystemsJACK GREENspecial
08/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/28/2024Heating SystemsJACK GREENspecial
08/28/2024Post-installed AnchorsJACK GREENspecial
08/28/2024FinalJACK GREENprogress
08/28/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
08/05/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/05/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/05/2024Heating SystemsJACK GREENspecial
08/05/2024Mechanical SystemsJACK GREENspecial
08/05/2024Post-installed AnchorsJACK GREENspecial
Latest 25 of 61.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00703149-P1Request digital key ↗
08/26/2026Q00703149-I1Request digital key ↗
08/26/2026Q00742905-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/29/2023421816039Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
06/29/2023421816039Open ↗
06/29/2023421816039Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/15/2023421816039Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026Q00742905-I1Open ↗
08/26/2026Q00742905-P1Open ↗
08/24/2026Q00933427-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P1Open ↗
08/28/2026Q00742905-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/26/2026Q00742905-P1Open ↗
08/26/2026Q00742905-I1Open ↗
08/24/2026Q00933427-I1Open ↗
Showing 3 of 19 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00742905-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00742905-I1Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/29/2023421816039Open ↗
06/15/2023421816039Open ↗
06/15/2023421816039Open ↗
▸BISBOROUGH INTAKE FORM1
06/29/2023421816039Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/15/2023421816039Open ↗
06/15/2023421816039Open ↗
▸BISRESTRICTION: DEED2
06/29/2023421816039Open ↗
06/15/2023421816039Open ↗