General warehouse
50-25 35TH STREET
QUEENS · Sunnyside · BIN 4307180
💬 Discuss this project
1988Year Built
1Stories
E1Building Class
M1-1Zoning
7,764 sfGross Floor Area
2Units
General warehouse · Owner of record: Terra 35 Lic · 9,850 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical equipment installation and HVAC system26p · 4 filings · 20 docs
Floor 1Michael Scott Events86p · 7 filings · 20 docs
CellarTerra 35 Lic, LLC39p · 3 filings · 20 docs
BasementMechanical equipment installation and HVAC system8p · 3 filings · 20 docs
Sub-BasementTerra 35 Lic, LLC35p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Earthman Solutions1008/28/2024
Kimberly Brown Architecture207/02/2024
Jack Green Associates508/22/2023
David Stern Architecture209/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
American Gotham Consultants1003/21/2026
Erica Frost203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Improvement ServicesGeneral Contractor1007/08/2026
TumenGeneral Contractor407/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Best Plumbing & HVACPlumbing107/08/2026
Best Plumbing & HVACFire Protection107/08/2026
A.M.J. ElectricElectrical103/22/2026
Metrocity GroupPlumbing107/08/2026
N.Z. Pilgrim ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422708/28/2024
CL Engineering6781207/02/2024
Building Lifecycle
All (77)Filed (18)Permit Issued (12)Signed Off (7)Inspection (10)Special Inspection (30)
10/01/2024
Signed off — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-I1
09/26/2024
Signed off — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-I1
09/25/2024
Signed off — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-I1
09/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2024
Filed — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-P2
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
08/28/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
08/28/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/28/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/28/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/28/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/28/2024
Special inspection requirement — Final
JACK GREEN
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/28/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/28/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/28/2024
Special inspection requirement — Final
JACK GREEN
08/28/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
08/28/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/28/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/22/2024
Signed off — Alteration
General Contruction of interior partitions and finishes for new ground floor commercial establishment..
Q00926963-I1
08/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2024
Special inspection requirement — Maintenance information
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
08/05/2024
Special inspection requirement — Final
JACK GREEN
08/05/2024
Special inspection requirement — Post-installed Anchors
JACK GREEN
08/05/2024
Special inspection requirement — Mechanical Systems
JACK GREEN
08/05/2024
Special inspection requirement — Heating Systems
JACK GREEN
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/05/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
08/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
07/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/25/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P4
07/18/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P3
07/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2024
Filed — Alteration
General Contruction of interior partitions and finishes for new ground floor commercial establishment..
Q00926963-P1
06/26/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P2
06/26/2024
Filed — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-P1
03/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2024
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-P1
02/05/2024
Signed off — Alteration
installation of mechanical equipment on the roof. Demolition of existing mechanical system and installation of new HVAC system
Q00742905-I1
02/02/2024
Signed off — Alteration
Revised plans filed herewith to indicated new construction floor plan layout and elevations with all changes bubbled
Q00703149-I1
01/22/2024
Signed off — Alteration
added a hand sink, new lav , . All as shown on drawings filed herewith
Q00703171-I1
01/22/2024
Permit issued — Mechanical Systems
Q00742905-I1-MS
01/22/2024
Permit issued — General Construction
Q00703149-I1-GC
11/15/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/16/2023
Permit issued — Mechanical Systems
Q00933347-I1-MS
10/10/2023
Permit issued — Sprinklers
Q00933427-I1-EW-SP
10/10/2023
Permit issued — Plumbing
Q00933371-I1-PL
10/03/2023
Permit issued — General Construction
Q00926963-I1-GC
09/25/2023
Filed — Alteration
FURNISH AND INSTALL NEW MAKE-UP AIR UNIT ON ROOF. NEW MAKE-UP AIR UNIT TO HAVE DDC CONTROL PANEL AND ALL ACESSORIES REQUIRED FOR A FULLY OPERATIONAL SYSTEM.
Q00933347-I1
09/21/2023
Filed — Alteration
installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of egress or occupancy
Q00933371-I1
09/21/2023
Filed — Alteration
MODIFY EX. WET SPRINKLER LAYOUT IN COORDINATION WITH NEW ARCHITECTURAL AND CEILING LAYOUT AND OCCUPANCY CHANGES. PROVIDE DRY PIPE SPRINKLERS TO WALK-IN COOLER / FREEZER.
Q00933427-I1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCapital Improvement Services01/22/2024
DOB NOWGeneral ConstructionSigned-offCapital Improvement Services01/22/2024
DOB NOWMechanical SystemsSigned-offTumen10/16/2023
DOB NOWSprinklersSigned-offBest Plumbing & HVAC10/10/2023
DOB NOWPlumbingSigned-offBest Plumbing & HVAC10/10/2023
DOB NOWGeneral ConstructionSigned-offTumen10/03/2023
DOB NOWPlumbingSigned-offArco Plumbing and Heating09/29/2022
DOB NOWGeneral ConstructionSigned-offCapital Improvement Services06/23/2022
DOB NOWMechanical SystemsSigned-offCapital Improvement Services06/23/2022
DOB NOWPlumbingSigned-offMetrocity Group06/03/2022
DOB NOWMechanical SystemsSigned-offCapital Improvement Services06/02/2022
DOB NOWGeneral ConstructionSigned-offCapital Improvement Services04/23/2022
3 projects · most recent 11/21/2023
General Wiring
FiledStatusContractorScope
11/21/2023Permit IssuedA.M.J. ElectricGeneral Wiring
09/15/2023CompleteN.Z. Pilgrim Electric1 meters, 1 new_meters
07/31/2023CompleteN.Z. Pilgrim ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - UndergroundPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
08/28/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
08/28/2024Post-installed AnchorsJACK GREENspecial
08/28/2024Heating SystemsJACK GREENspecial
08/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/28/2024Mechanical SystemsJACK GREENspecial
08/28/2024FinalJACK GREENprogress
08/28/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
08/28/2024Shutoff dampersJACK GREENenergy_progress
08/28/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/28/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
08/28/2024Maintenance informationJACK GREENenergy_progress
08/28/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/28/2024Shutoff dampersJACK GREENenergy_progress
08/28/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
08/28/2024Mechanical SystemsJACK GREENspecial
08/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/28/2024Heating SystemsJACK GREENspecial
08/28/2024Post-installed AnchorsJACK GREENspecial
08/28/2024FinalJACK GREENprogress
08/28/2024Maintenance informationJACK GREENenergy_progress
08/05/2024Shutoff dampersJACK GREENenergy_progress
08/05/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
08/05/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/05/2024Heating SystemsJACK GREENspecial
08/05/2024Mechanical SystemsJACK GREENspecial
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Michael Scott EventsOfficeFloor 1
Project Q00926963 Alteration · LOC Issued · 09/11/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00703149-P1Request digital key ↗
08/26/2026Q00703149-I1Request digital key ↗
08/26/2026Q00742905-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/29/2023421816039Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
06/29/2023421816039Open ↗
06/29/2023421816039Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/15/2023421816039Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026Q00742905-P1Open ↗
08/26/2026Q00742905-I1Open ↗
08/24/2026Q00933427-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00933347-P2Open ↗
09/01/2026Q00933347-P1Open ↗
08/28/2026Q00742905-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/26/2026Q00742905-P1Open ↗
08/26/2026Q00742905-I1Open ↗
08/24/2026Q00933427-P1Open ↗
Showing 3 of 19 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00742905-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00742905-I1Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/29/2023421816039Open ↗
06/15/2023421816039Open ↗
06/15/2023421816039Open ↗
▸BISBOROUGH INTAKE FORM1
06/29/2023421816039Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/15/2023421816039Open ↗
06/15/2023421816039Open ↗
▸BISRESTRICTION: DEED2
06/29/2023421816039Open ↗
06/15/2023421816039Open ↗