← Back
Zoned commercial or Manhattan residential
50 3 AVENUE
MANHATTAN · BIN 1008974
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C6-2AZoning
0 sfGross Floor Area
0Units
Rent Stabilized87 Open Violations ▸
Zoned commercial or Manhattan residential · Owner of record: 62-64 THIRD AVE. L.P. · 3,942 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof18p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 9 docs
Floor 42p · 1 filing · 6 docs
Floor 31p · 1 filing · 3 docs
Floor 22p · 1 filing · 6 docs
Floor 13p · 2 filings · 20 docs
Cellar2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALBA SERVICES203/22/2026
50 3RD AVENUE ASSOC L.P.103/22/2026
JERWIN THIRD ASSOCS.203/22/2026
PROMOTION 21203/22/2026
PRO MOTION 21 GENERAL CON103/22/2026
50 3RD AVE ASSOCIATES LIMITED P103/21/2026
TASTE WINE COMPANY203/21/2026
PLUCK 3RD AVENUE103/21/2026
GREATER NY SAVING BANK203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2023$10.0M—50 3RD AVENUE ASSOCIATES LIMITED PARTNERSHIP → 62-64 THIRD AVE. L.P.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANCORA ENGINEERING, PLLC609/11/2024
FL&M ENGINEERING DESIGN &INSPECTION112/14/2023
MJE PROFESSIONAL SERVICES110/16/2023
HUNG T LEE, PE107/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY203/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBA SERVICES INCGeneral Contractor1007/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor404/09/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
H&Z BUILDING CONSULTING IGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843209/11/2024
ANCORA ENGINEERING, PLLC6818108/19/2024
Building Lifecycle
All (119)Filed (9)Permit Issued (14)Signed Off (5)Violation (60)Inspection (2)Objection (26)Special Inspection (3)
04/29/2026
Violation issued (HPD, open)
A
03/04/2026
Permit issued — Construction Fence
M00945582-I1-FN
11/17/2025
Violation issued (HPD, open)
I
10/09/2025
Signed off — Alteration
M00975024-I1
06/04/2025
Violation issued (HPD, open)
A
03/18/2025
Signed off — Alteration
PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB#M00913213. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00936745-I1
03/11/2025
Signed off — Alteration
USE OF CHUTE AT THE TIME OF INTERIOR DEMOLITION
M00913384-S1
03/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2025
Signed off — Alteration
USE OF CHUTE AT THE TIME OF INTERIOR DEMOLITION
M00913384-I1
01/30/2025
Signed off — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AND USE OF CHUTE AT THE TIME OF DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
M00913213-I1
12/23/2024
Violation issued (ECB, closed)
Construction
12/23/2024
Violation issued (ECB, closed)
Unknown
12/05/2024
Permit issued — Construction Fence
M00945582-I1-FN
11/22/2024
Violation issued (HPD, open)
I
11/18/2024
Permit issued — Sidewalk Shed
M00975024-I1-SF
11/18/2024
Permit issued — Sidewalk Shed
M00975024-I1-SH
11/13/2024
Permit issued — Protection and Mechanical Methods
M00913213-S1-PMM
11/13/2024
Permit issued — Full Demolition
M00913213-I1-FD
11/08/2024
Permit issued — Sprinklers
M00936745-I1-EW-SP
10/25/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
JOHN MCMONAGLE
10/16/2024
Objection resolved — Addressed
10/02/2024
Objection resolved — Addressed
10/02/2024
Objection resolved — Addressed
09/27/2024
Objection raised — Fire_Protection
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/11/2024
Filed — Alteration
PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB#M00913213. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00936745-I1
09/09/2024
Permit issued — General Construction
M00913384-I1-GC
08/30/2024
Objection raised — Other
08/30/2024
Objection raised — Structural
08/30/2024
Objection raised — Mechanical
08/30/2024
Objection raised — Admin
08/23/2024
Permit issued — Protection and Mechanical Methods
M00913384-S1-PMM
08/19/2024
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AND USE OF CHUTE AT THE TIME OF DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
M00913213-P1
07/29/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Gregory Moormann
04/01/2024
Violation issued (HPD, open)
A
12/19/2023
Permit issued — Construction Fence
M00945582-I1-FN
12/15/2023
Permit issued — Supported Scaffold
M00975024-I1-SH
12/15/2023
Permit issued — Sidewalk Shed
M00975024-I1-SF
12/14/2023
Filed — Alteration
M00975024-I1
11/15/2023
Violation issued (HPD, open)
I
11/10/2023
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AND USE OF CHUTE AT THE TIME OF DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
M00913213-S1
10/16/2023
Filed — Alteration
M00945582-I1
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/23/2023
Permit issued — Protection and Mechanical Methods
M00913384-S1-PMM
08/22/2023
Filed — Alteration
USE OF CHUTE AT THE TIME OF INTERIOR DEMOLITION
M00913384-S1
08/15/2023
Filed — Alteration
USE OF CHUTE AT THE TIME OF INTERIOR DEMOLITION
M00913384-I1
08/11/2023
Objection raised — Accessibility
08/11/2023
Objection raised — Structural
08/11/2023
Objection raised — Fire_Protection
08/11/2023
Objection raised — Structural
08/11/2023
Objection raised — Mechanical
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offALBA SERVICES INC03/04/2026
DOB NOWConstruction FenceSigned-offALBA SERVICES INC12/05/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC11/18/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC11/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC11/13/2024
DOB NOWFull DemolitionSigned-offALBA SERVICES INC11/13/2024
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC11/08/2024
DOB NOWGeneral ConstructionSigned-offALBA SERVICES INC09/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC08/23/2024
DOB NOWConstruction FenceSigned-offALBA SERVICES INC12/19/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC12/15/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC12/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC08/23/2023
DOB NOWConstruction FencePermit IssuedH&Z BUILDING CONSULTING I07/16/2018
BISFPISSUEDPINNACLE PLBG & HTG CORP08/08/2018
BISPLISSUEDTOP PLUMBING GROUP,INC07/09/2018
BISPLISSUEDGREAT CITY PLUMBING INC06/13/2018
BISOTISSUEDWINWAY DEVELOPMENT LLC05/31/2018
BISPLISSUEDB&B MECH PLBG & HTG LLC06/25/2015
BISOTISSUEDPRECISION BUILDING & CONS04/08/2015
BISEQISSUEDH & R CONSTRUCTION GROUP INC.04/17/2006
BISOTISSUEDH & R CONSTRUCTION GROUP INC.04/17/2006
BISSPISSUEDAUTOMATIC FIRE SPRINKLER04/06/2000
BISSPISSUEDAUTOMATIC FIRE SPRINKLER09/14/1998
BISPLISSUEDMAGOR PLUMBING & HEATING11/17/1994
BISOTISSUEDC.S YUEN CONSTR CO10/31/1994
BISPLISSUEDMAGOR PLUMBING & HEATING08/09/1994
BISFPISSUEDFIRE COMMAND COMPANY INC04/29/1994
BISPLISSUEDMAGOR PLG & HTG03/10/1994
BISOTISSUEDTERRY FRANK CONST. CORP02/15/1994
BISPLISSUEDRITEWAY CONTRACTING CORP07/31/1991
BISOTISSUEDTOTAL BUSINESS ADVANTAGE INC07/18/1991
1 project · most recent 07/15/2018
Fence
FiledStatusContractorScope
07/15/2018Permit IssuedH&Z BUILDING CONSULTING IFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/25/2024Structural Stability – Alterations of existing BuildingsJOHN MCMONAGLEspecial
07/29/2024Structural Stability – Alterations of existing BuildingsGregory Moormannspecial
08/02/2023FinalJames Pattersonprogress
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/06/2026M00061903-I1Request digital key ↗
08/29/2026M00913384-I1Request digital key ↗
08/29/2026M00913384-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION16
06/02/2025103549858Open ↗
05/22/2025101742063Open ↗
05/22/2025100293996Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION9
07/30/2019123235178Open ↗
08/09/2018123469610Open ↗
08/08/2018123469610Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/01/2015122334009Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026M00945582-I1Open ↗
08/28/2026M00913213-P1Open ↗
08/28/2026M00913213-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/08/2019123235178Open ↗
06/01/2018123235178Open ↗
10/01/2015122334009Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/09/2018123469610Open ↗
06/01/2018123235178Open ↗
03/18/2015122334009Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/01/2018123235178Open ↗
03/18/2015122334009Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00913213-P1Open ↗
09/01/2026M00913213-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/09/2018123469610Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026M00913384-I1Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
12/11/2018123235178Open ↗
12/07/2018123235178Open ↗
11/23/2018123235178Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS4
11/07/2019123235178Open ↗
11/07/2019123235178Open ↗
11/07/2019123235178Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
08/13/2015122334009Open ↗
07/17/2015122334009Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/09/2018123469610Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/07/2019123235178Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M00913213-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M00913213-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M00913213-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M00913213-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
08/09/2018123469610Open ↗
06/01/2018123235178Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026M00936745-I1Open ↗
08/15/2026M00913213-P1Open ↗
08/15/2026M00913213-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/01/2018123235178Open ↗
03/18/2015122334009Open ↗
▸DOB NOWRodent Control1
08/13/2026M00913213-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/08/2019123235178Open ↗
06/01/2018123235178Open ↗
10/01/2015122334009Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/08/2019123235178Open ↗
10/01/2015122334009Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/08/2019123235178Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/08/2019123235178Open ↗
04/17/2019123469610Open ↗
10/01/2015122334009Open ↗
▸BISSUPERSEDING LETTER1
07/11/2018123235178Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
11/08/2019123235178Open ↗
04/17/2019123469610Open ↗
08/09/2018123469610Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM6
11/08/2019123235178Open ↗
04/17/2019123469610Open ↗
12/07/2018123235178Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET3
08/09/2018123469610Open ↗
06/01/2018123235178Open ↗
03/18/2015122334009Open ↗
▸BISADDITIONAL INFORMATION2
10/08/2019123235178Open ↗
11/07/2018123235178Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/15/2026M00913213-P1Open ↗
08/15/2026M00913213-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026M00913213-P1Open ↗
08/13/2026M00913213-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
04/17/2019123469610Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M00913213-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M00913213-I1Open ↗