← Back
Two stories - detached, small or mid-size
50 78 STREET
BROOKLYN · BIN 3150149
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4AZoning
1,808 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,700 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilOther
Floor 25p · 3 filings · 20 docs
Floor 12p · 2 filings · 14 docs
Basement5p · 2 filings · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2020$1.1M—— → —$608/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KCE CONSULTING ENGINEERING PLLC406/17/2025
SAHEB ARCHITECTURE202/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION CONSTRUCTION OFGeneral Contractor307/08/2026
ABR PLBG&HTG CONTR INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712406/17/2025
SAHEB ARCHITECTURE PLLC7018202/25/2022
Building Lifecycle
All (23)Filed (6)Permit Issued (5)Signed Off (4)Violation (1)Inspection (5)Objection (2)
03/30/2026
Signed off — Alteration
B01227175-I1
09/30/2025
Permit issued — Structural
B01227175-I1-ST
06/17/2025
Filed — Alteration
B01227175-I1
04/03/2023
Signed off — Alteration
THE PROPOSED MECHANICAL WORK INVOLVES A NEW CENTRAL AIR CONDITIONING (AC) COOLING ONLY SYSTEM AT THE BASEMENT, 1ST AND 2ND FLOOR OF THE HOUSE.
B00555325-I1
03/09/2023
Signed off — Alteration
Replacement of fixtures in existing kitchen and bathroom, new powder room in conjunction with DOB BIS application #340801127. New gas piping in basement.
B00448705-I1
03/07/2023
Violation issued (ECB, closed)
Zoning
02/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2023
Filed — Alteration
THE PROPOSED MECHANICAL WORK INVOLVES A NEW CENTRAL AIR CONDITIONING (AC) COOLING ONLY SYSTEM AT THE BASEMENT, 1ST AND 2ND FLOOR OF THE HOUSE.
B00555325-P1
11/09/2022
Permit issued — Plumbing
B00448705-I1-PL
04/15/2022
Signed off — Alteration
B00454045-I1
03/08/2022
Objection resolved — Addressed
03/02/2022
Objection raised — Other
02/25/2022
Filed — Alteration
Replacement of fixtures in existing kitchen and bathroom, new powder room in conjunction with DOB BIS application #340801127. New gas piping in basement.
B00448705-P1
01/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/26/2021
Permit issued — Mechanical Systems
B00555325-I1-MS
07/20/2021
Filed — Alteration
THE PROPOSED MECHANICAL WORK INVOLVES A NEW CENTRAL AIR CONDITIONING (AC) COOLING ONLY SYSTEM AT THE BASEMENT, 1ST AND 2ND FLOOR OF THE HOUSE.
B00555325-I1
07/18/2021
Permit issued — Plumbing
B00448705-I1-PL
04/23/2021
Permit issued — General Construction
B00454045-I1-GC
01/22/2021
Filed — Alteration
B00454045-I1
01/07/2021
Filed — Alteration
Replacement of fixtures in existing kitchen and bathroom, new powder room in conjunction with DOB BIS application #340801127. New gas piping in basement.
B00448705-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPRECISION CONSTRUCTION OF09/30/2025
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC11/09/2022
DOB NOWMechanical SystemsSigned-offPRECISION CONSTRUCTION OF07/26/2021
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC07/18/2021
DOB NOWGeneral ConstructionSigned-offPRECISION CONSTRUCTION OF04/23/2021
BISOTISSUEDPRECISION CONSTRUCTION OF03/25/2022
2 projects · most recent 01/20/2021
General Wiring
FiledStatusContractorScope
01/20/2021CompleteDIDONATO & SONS ELCL CONT1 meters, 1 new_meters
01/20/2021CompleteDIDONATO & SONS ELCL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/17/2022Fire-Resistant Penetrations and JointsKemba Walcottspecial
11/17/2022Mechanical SystemsKemba Walcottspecial
11/17/2022Structural Stability – Alterations of existing buildingsKemba Walcottspecial
11/17/2022FinalKemba Walcottprogress
03/09/2022Fire-Resistant Penetrations and JointsRitu Sahebspecial
01/26/2022Fire-Resistant Penetrations and JointsRitu Sahebspecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
09/01/2026B00555325-P1Request digital key ↗
09/01/2026B00555325-I1Request digital key ↗
08/21/2026B01227175-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00448705-I1Request digital key ↗
08/14/2026B00448705-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00454045-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
10/18/2022340801127Open ↗
02/09/2021340801127Open ↗
01/11/2021340801127Open ↗
▸BISWORK PERMIT APPLICATION1
05/05/2021340801127Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026B00448705-P1Open ↗
09/02/2026B00448705-I1Open ↗
09/01/2026B00454045-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026B00448705-I1Open ↗
08/26/2026B00555325-P1Open ↗
08/26/2026B00555325-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/11/2021340801127Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/11/2021340801127Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B00555325-P1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
01/11/2021340801127Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026B00448705-I1Open ↗
09/01/2026B00454045-I1Open ↗
09/01/2026B00555325-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/11/2021340801127Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026B01227175-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/05/2021340801127Open ↗
01/11/2021340801127Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/11/2021340801127Open ↗
▸BISINTERIOR LIGHTING POWER1
03/08/2023340801127Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/08/2023340801127Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/08/2023340801127Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/08/2023340801127Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/08/2023340801127Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00555325-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/17/2023340801127Open ↗
03/16/2023340801127Open ↗
03/16/2023340801127Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/08/2023340801127Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/20/2023340801127Open ↗
▸BISFINAL1
03/08/2023340801127Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/18/2022340801127Open ↗
02/17/2021340801127Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023340801127Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/17/2022340801127Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/11/2021340801127Open ↗