← Back
Office only, 2-6 stories
50 BAY STREET
STATEN ISLAND · St. George-New Brighton · BIN 5000034
💬 Discuss this project
1932Year Built
4Stories
O2Building Class
C4-2Zoning
27,000 sfGross Floor Area
1Units
7 Open Violations ▸FDNY Report ↗
Office only, 2-6 stories · 7,500 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof11p · 2 filings · 20 docs
Floor 51p · 1 filing · 15 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 15 docs
Floor 1
Site & exterior13p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SI UNIVERSITY HOSPITAL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE503/06/2024
AME SERVICES INC106/23/2023
ASIF JAMIL, RA107/27/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES203/21/2026
LEOPARDTOGO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERI RESTORATION INCGeneral Contractor407/08/2026
CICCARELLI & ASSOCIATES *General Contractor303/21/2026
PORTO CONSTRUCTION,LLCGeneral Contractor303/21/2026
BILTMORE GENERAL CONTRACTORSGeneral Contractor203/21/2026
CATELLO ELEC'L CONT., INCElectrical103/22/2026
PARAMOUNT PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683102/27/2024
A TECH ENGINEERING NYC, P6738307/27/2023
Building Lifecycle
All (108)Filed (7)Permit Issued (6)Signed Off (4)Violation (60)Inspection (1)Special Inspection (30)
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/14/2024
Signed off — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF (3) CONDENSER UNITS AT ROOF AND (3) AIR HANDLER UNITS IN AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, OR OCCUPANCY UNDER THIS APP. ALL WORK AS PER PLAN
S01010980-I1
03/13/2024
Permit issued — Mechanical Systems
S01010980-I1-MS
03/07/2024
Special inspection requirement — Final
Frank Martarella III
03/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
03/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
03/07/2024
Special inspection requirement — Maintenance information
Frank Martarella III
03/07/2024
Special inspection requirement — Permanent certificate
Frank Martarella III
03/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
03/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
03/07/2024
Special inspection requirement — Mechanical Systems
Frank Martarella III
03/06/2024
Filed — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF (3) CONDENSER UNITS AT ROOF AND (3) AIR HANDLER UNITS IN AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, OR OCCUPANCY UNDER THIS APP. ALL WORK AS PER PLAN
S01010980-P1
03/01/2024
Special inspection requirement — Permanent certificate
03/01/2024
Special inspection requirement — Mechanical Systems
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
03/01/2024
Special inspection requirement — Final
03/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
03/01/2024
Special inspection requirement — Maintenance information
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
02/27/2024
Filed — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF (3) CONDENSER UNITS AT ROOF AND (3) AIR HANDLER UNITS IN AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, OR OCCUPANCY UNDER THIS APP. ALL WORK AS PER PLAN
S01010980-I1
01/26/2024
Violation issued (FDNY_NOV, closed)
11/20/2023
Violation issued (FDNY_NOV, closed)
09/26/2023
Signed off — Alteration
S00894337-I1
09/20/2023
Signed off — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF NINE (9) ROOF TOP UNITS AT ROOF OF AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00863640-S1
09/19/2023
Signed off — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF NINE (9) ROOF TOP UNITS AT ROOF OF AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00863640-I1
07/27/2023
Filed — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF NINE (9) ROOF TOP UNITS AT ROOF OF AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00863640-P1
07/27/2023
Special inspection requirement — Mechanical Systems
anthony santoro
07/27/2023
Special inspection requirement — Maintenance information
anthony santoro
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/27/2023
Special inspection requirement — Final
anthony santoro
07/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/27/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/12/2023
Special inspection requirement — Mechanical Systems
anthony santoro
07/12/2023
Special inspection requirement — Maintenance information
anthony santoro
07/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/12/2023
Special inspection requirement — Final
anthony santoro
07/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/23/2023
Filed — Alteration
S00894337-I1
06/23/2023
Permit issued — Sidewalk Shed
S00894337-I1-SH
06/15/2023
Permit issued — Plumbing
S00863640-S1-PL
06/06/2023
Filed — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF NINE (9) ROOF TOP UNITS AT ROOF OF AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00863640-S1
05/05/2023
Permit issued — Mechanical Systems
S00863640-I1-MS
04/27/2023
Filed — Alteration
APPLICATION IS FILED FOR THE DIRECT REPLACEMENT OF NINE (9) ROOF TOP UNITS AT ROOF OF AN EXISTING 5 STORY COMMERCIAL BUILDING TO OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00863640-I1
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2020
Violation issued (ECB, closed)
Elevators
01/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/16/2019
Permit issued — Sidewalk Shed
S00198765-I1-SH
08/16/2019
Permit issued — Sidewalk Shed
S00198765-I1-SF
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2019
Filed — Alteration
S00198765-I1
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCICCARELLI & ASSOCIATES *03/13/2024
DOB NOWSidewalk ShedSigned-offBILTMORE GENERAL CONTRACTORS06/23/2023
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP06/15/2023
DOB NOWMechanical SystemsSigned-offPORTO CONSTRUCTION,LLC05/05/2023
DOB NOWSidewalk ShedPermit IssuedAMERI RESTORATION INC08/16/2019
DOB NOWSidewalk ShedPermit IssuedAMERI RESTORATION INC08/16/2019
BISOTISSUEDAMERI RESTORATION INC11/27/2019
BISEQISSUEDCOLGAGESCAFFOLDING&EQUIP06/21/2006
BIS—ISSUEDDAGGART OF RICHMOND INC04/03/2006
BISEQISSUEDCOLGATE SCAFFOLDING03/22/2006
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/09/2006
BISPLISSUEDR.J.C. MECHANICAL CORP09/30/2005
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT08/03/2005
BIS—ISSUEDDAGGART OF RICHMOND INC05/25/2005
BIS—ISSUEDDAGGART OF RICHMOND INC10/27/2004
BIS—ISSUEDDAGGART OF RICHMOND INC01/12/2004
BISOTISSUEDWVC DEVELOPMENT COMPANY,INC04/21/1998
4 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026CompleteCAPO ELECTRIC LLCGeneral Wiring
07/05/2023Permit IssuedRICHMOND ELEC'L CONTR'S—
05/10/2023CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
07/29/2019Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/07/2024FinalFrank Martarella IIIprogress
03/07/2024HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
03/07/2024HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
03/07/2024Maintenance informationFrank Martarella IIIenergy_progress
03/07/2024Permanent certificateFrank Martarella IIIenergy_progress
03/07/2024Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
03/07/2024Energy Code Compliance InspectionsFrank Martarella IIIprogress
03/07/2024Mechanical SystemsFrank Martarella IIIspecial
03/01/2024Permanent certificate—energy_progress
03/01/2024Mechanical Systems—special
03/01/2024Energy Code Compliance Inspections—progress
03/01/2024Final—progress
03/01/2024Fire-Resistance Rated Construction—progress
03/01/2024HVAC-R and service water heating equipment—energy_progress
03/01/2024Maintenance information—energy_progress
03/01/2024HVAC-R and service water heating system controls—energy_progress
07/27/2023Mechanical Systemsanthony santorospecial
07/27/2023Maintenance informationanthony santoroenergy_progress
07/27/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/27/2023Finalanthony santoroprogress
07/27/2023Fire-Resistance Rated Constructionanthony santoroprogress
07/27/2023Energy Code Compliance Inspectionsanthony santoroprogress
07/27/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
07/12/2023Mechanical Systemsanthony santorospecial
07/12/2023Maintenance informationanthony santoroenergy_progress
Latest 25 of 33.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/23/2026S00863640-S1Request digital key ↗
08/23/2026S00863640-P1Request digital key ↗
08/23/2026S00863640-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026S00198765-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026S00198765-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/25/2019540167585Open ↗
▸BISWORK PERMIT APPLICATION1
11/27/2019540167585Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026S00863640-P1Open ↗
09/01/2026S00863640-P1Open ↗
09/01/2026S00863640-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00863640-I1Open ↗
08/23/2026S00894337-I1Open ↗
08/21/2026S01010980-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00863640-P1Open ↗
09/01/2026S00863640-I1Open ↗
08/31/2026S00863640-S1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/25/2019540167585Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/25/2019540167585Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2019540167585Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/13/2020540167585Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/25/2019540167585Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/25/2019540167585Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/25/2019540167585Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/13/2020540167585Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/25/2019540167585Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/13/2020540167585Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/25/2019540167585Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/23/2026S00894337-I1Open ↗
08/13/2026S00198765-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/13/2020540167585Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/13/2020540167585Open ↗
08/25/2019540167585Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2019540167585Open ↗
▸BISBOROUGH INTAKE FORM1
01/13/2020540167585Open ↗
▸Other Documents1
▸BISFEE EXEMPTION DOCUMENTATION1
08/25/2019540167585Open ↗