← Back
Condo, residential unit in elevator building
Ikon Condominium
50 BAYARD STREET · Williamsburg · BIN 3393895
💬 Discuss this project
1900Year Built
9Stories
R4Building Class
M1-2/R6AZoning
48,628 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · 12,004 sf lot · 4.05 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 98p · 1 filing · 11 docs
Floor 88p · 1 filing · 11 docs
Floor 78p · 1 filing · 11 docs
Floor 618p · 3 filings · 20 docs
Floor 58p · 1 filing · 11 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior5p · 1 filing · 3 docs
Filed — no permit issued10p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAYARD APARTMENTS703/21/2026
SAGITTARIUS INVESTMENTS HOLDINGS503/21/2026
NORTH DEVELOPMENT GROUP403/21/2026
IKON CONDOMINIUM403/21/2026
AINSTAR REALTY203/21/2026
EXOD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SW ENGINEERING COMPANY204/04/2024
ENTHINK ENGINEERS LLC109/07/2023
DAGHER ENGINEERING PLLC408/31/2023
NAVA208/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING403/21/2026
QUICK FILING OF NY INC603/21/2026
QUICK FILING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED OAK RENOVATIONS CORPGeneral Contractor403/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
JUNO CONTRACTING CORPGeneral Contractor107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912204/04/2024
DAGHER ENGINEERING2441408/07/2023
Building Lifecycle
All (162)Filed (9)Permit Issued (5)Signed Off (4)Facade (FISP) (9)Violation (60)Inspection (3)Objection (53)Special Inspection (19)
05/08/2026
Violation issued (HPD, closed)
A
04/06/2026
Violation issued (FDNY_NOV, closed)
04/06/2026
Violation issued (FDNY_NOV, closed)
11/19/2025
Violation issued (HPD, closed)
I
06/28/2025
Violation issued (FDNY_NOV, closed)
05/07/2025
Signed off — Alteration
Limited exterior repairs as: Balconies metal cladding system resetting and related waterproofing work. no change to use, egress or occupancy.
B00860775-I1
12/03/2024
Signed off — Alteration
Interior renovations to 006 fl apartment #PH1 as per plans submitted. PL B00729379, MH# B00729425, SP # B00729427, , to be submitted under separate application.
B00726959-I1
11/21/2024
Permit issued — General Construction
B00726959-I1-GC
09/27/2024
Signed off — Alteration
B00729379-I1
05/24/2024
Cycle 9 facade report signed — SWARMP
05/21/2024
Signed off — Alteration
B00930229-I1
04/22/2024
Special inspection requirement — Final
Yakov Weinstein
04/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
04/22/2024
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
04/12/2024
Objection resolved — Addressed
04/12/2024
Objection resolved — Addressed
04/11/2024
Objection raised — Admin
04/11/2024
Objection raised — Scope
04/04/2024
Filed — Alteration
Limited exterior repairs as: Balconies metal cladding system resetting and related waterproofing work. no change to use, egress or occupancy.
B00860775-P1
04/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/14/2024
Cycle 9 facade report submitted
02/14/2024
Cycle 9 facade inspection completed
01/18/2024
Violation issued (FDNY_NOV, closed)
11/20/2023
Violation issued (HPD, closed)
I
10/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Josephine Zurica
09/07/2023
Filed — Alteration
B00930229-I1
09/07/2023
Permit issued — Plumbing
B00729379-I1-PL
09/07/2023
Permit issued — Supported Scaffold
B00930229-I1-SF
09/07/2023
Objection resolved — Addressed
08/31/2023
Filed — Alteration
B00729379-P1
08/29/2023
Permit issued — General Construction
B00860775-I1-GC
08/09/2023
Objection raised — Other
08/07/2023
Filed — Alteration
Interior renovations to 006 fl apartment #PH1 as per plans submitted. PL B00729379, MH# B00729425, SP # B00729427, , to be submitted under separate application.
B00726959-P1
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Josephine Zurica
07/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DAVID RUFF
07/28/2023
Special inspection requirement — Air barrier - visual inspection
DAVID RUFF
07/28/2023
Special inspection requirement — Fenestration areas
DAVID RUFF
07/28/2023
Special inspection requirement — Fenestration air leakage
DAVID RUFF
07/28/2023
Special inspection requirement — Interior lighting power
DAVID RUFF
07/28/2023
Special inspection requirement — Lighting controls
DAVID RUFF
07/28/2023
Special inspection requirement — Lighting in dwelling units
DAVID RUFF
07/28/2023
Special inspection requirement — Maintenance information
DAVID RUFF
07/28/2023
Special inspection requirement — Insulation placement and R values
DAVID RUFF
07/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Josephine Zurica
07/28/2023
Special inspection requirement — Energy Code Compliance Inspections
DAVID RUFF
07/28/2023
Special inspection requirement — Final
DAVID RUFF
07/24/2023
Permit issued — General Construction
B00726959-I1-GC
05/11/2023
Objection raised — Scope
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Scope
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Scope
05/11/2023
Objection resolved — Addressed
05/09/2023
Filed — Alteration
Limited exterior repairs as: Balconies metal cladding system resetting and related waterproofing work. no change to use, egress or occupancy.
B00860775-I1
10/04/2022
Objection resolved — Addressed
07/18/2022
Objection resolved — Addressed
06/17/2022
Objection resolved — Addressed
06/17/2022
Objection resolved — Addressed
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRED OAK RENOVATIONS CORP11/21/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/07/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/07/2023
DOB NOWGeneral ConstructionSigned-offJUNO CONTRACTING08/29/2023
DOB NOWGeneral ConstructionSigned-offRED OAK RENOVATIONS CORP07/24/2023
BISOTISSUEDJUNO CONTRACTING CORP05/30/2018
BISEQISSUEDJUNO CONTRACTING CORP06/07/2017
BISEQISSUEDEVEREST SCAFFOLDING INC05/31/2017
BISOTISSUEDJUNO CONTRACTING CORP05/05/2017
BISOTISSUEDATRIUM INTERIORS INC01/13/2015
BISOTISSUEDATRIUM INTERIORS INC12/30/2014
BISPLISSUEDJOHN FARR P & H CORP01/04/2012
BISOTISSUEDBOLTECH BLDG SOLUTIONS CO12/30/2011
BISOTISSUEDBAYARD APARTMENTS LLC01/09/2008
BIS—ISSUEDBAYARD APARTMENTS LLC08/27/2007
BISEQISSUEDBAYARD APARTMENTS LLC08/27/2007
BISEQISSUEDBAYARD APARTMETNS LLC08/27/2007
BISEQISSUEDKISKA05/02/2007
BISEQISSUEDKISKA05/02/2007
BISPLISSUEDW.G. PL & HTG03/14/2007
BISPLISSUEDW.G. PLUMBING & HEATING03/14/2007
BISSDISSUEDW.G. PLUMBING & HEATING03/14/2007
BIS—ISSUEDKISKA GROUP LTD01/22/2007
BISEQISSUEDKISKA GROUP LTD01/08/2007
BISEQISSUEDKISKA GROUP LTD01/08/2007
BISEQISSUEDKISKA GROUP LTD09/29/2006
BISOTISSUEDKISKA GROUP LTD06/05/2006
BISPLISSUEDW.G. PL & HTG03/09/2006
BIS—ISSUEDKISKA GROUP LTD01/24/2006
BISEQISSUEDKISKA GROUP LTD01/24/2006
BISEQISSUEDKISKA GROUP LTD01/18/2006
BIS—ISSUEDKISKA GROUP LTD01/28/2005
BISEQISSUEDKISKA GROUP LTD01/28/2005
BISEQISSUEDKISKA GROUP LTD01/28/2005
BISEQISSUEDL&B CONSTRUCTION NY06/02/2003
BISEQISSUEDL&B CONSTRUCTION NY03/19/2003
1 project · most recent 05/27/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2022——Ventilation Systems
Ventilation
Carrier ROVIDE NEW FAN MODEL: FV-05-11VK1 ESP-0.25" 18 WATTS 120/1/60 1 kW · Exhaust Fan ×1
1 project · most recent 05/27/2022
FiledStatusContractorScope
05/27/2022——17 heads
4 projects · most recent 04/09/2024
General Wiring
FiledStatusContractorScope
04/09/2024CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
06/27/2022CompleteOHM'S ELECTRICAL CORP—
04/08/2019Permit IssuedATN ELECTRIC CORPGeneral Wiring
12/04/2018CompleteNGM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/22/2024FinalYakov Weinsteinprogress
04/22/2024Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
04/22/2024MasonryJOSHUA LUCKRITZspecial
09/28/2023HVAC-R and service water piping design and insulationJosephine Zuricaenergy_progress
07/28/2023Fire-Resistance Rated ConstructionJosephine Zuricaprogress
07/28/2023Fenestration and door U-factor and product ratingsDAVID RUFFenergy_progress
07/28/2023Air barrier - visual inspectionDAVID RUFFenergy_progress
07/28/2023Fenestration areasDAVID RUFFenergy_progress
07/28/2023Fenestration air leakageDAVID RUFFenergy_progress
07/28/2023Interior lighting powerDAVID RUFFenergy_progress
07/28/2023Lighting controlsDAVID RUFFenergy_progress
07/28/2023Lighting in dwelling unitsDAVID RUFFenergy_progress
07/28/2023Maintenance informationDAVID RUFFenergy_progress
07/28/2023Insulation placement and R valuesDAVID RUFFenergy_progress
07/28/2023Fire-Resistant Penetrations and JointsJosephine Zuricaspecial
07/28/2023Energy Code Compliance InspectionsDAVID RUFFprogress
07/28/2023FinalDAVID RUFFprogress
05/02/2022Mechanical SystemsJosephine Zuricaspecial
05/02/2022FinalJosephine Zuricaprogress
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026B00729379-I1Request digital key ↗
08/29/2026B00729379-P1Request digital key ↗
08/26/2026B00930229-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
02/28/2019321911080Open ↗
02/28/2019321911099Open ↗
02/28/2019321911106Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
05/31/2018321466542Open ↗
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
▸BISLimited Alteration Application (LAA1)1
04/16/2019321911106Open ↗
▸Seals & Professional Certifications43
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
04/16/2019321911099Open ↗
02/28/2019321911080Open ↗
02/28/2019321911080Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026B00726959-I1Open ↗
08/29/2026B00726959-P1Open ↗
08/29/2026B00729379-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B00726959-P1Open ↗
08/29/2026B00726959-P1Open ↗
08/29/2026B00726959-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00726959-P1Open ↗
08/29/2026B00729425-I1Open ↗
08/24/2026B00860775-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
▸BISPC FULL REPORT1
10/17/2007310030686Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE6
08/16/2012320116780Open ↗
05/11/2012320116780Open ↗
03/07/2012320116780Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/13/2019321911080Open ↗
02/28/2019321911080Open ↗
02/28/2019321911106Open ↗
▸BISSCHEDULE B - PLUMBING2
03/21/2012320116780Open ↗
12/31/2009320116780Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
06/19/2019321911080Open ↗
▸Safety & Tenant Protection25
▸DOB NOWHPD-1: Anti-Harassment Area Checklist9
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
08/13/2026B00729425-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTenant Protection Plan and Notes8
04/16/2019321911099Open ↗
02/28/2019321911080Open ↗
02/28/2019321911080Open ↗
Showing 3 of 8 on file for this type
▸BISANTI-HARASSMENT CHECKLIST5
06/19/2019321911080Open ↗
02/28/2019321911099Open ↗
02/28/2019321911106Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCertificate of No Harassment2
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
▸BISSTREET TREE CHECKLIST1
12/31/2009320116780Open ↗
▸Environmental & Asbestos20
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/28/2019321911080Open ↗
02/28/2019321911099Open ↗
02/28/2019321911106Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
08/13/2026B00860775-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
08/13/2026B00860775-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
12/23/2014340186346Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00726959-P1Open ↗
08/15/2026B00726959-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/31/2009320116780Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/16/2019321911099Open ↗
02/28/2019321911099Open ↗
02/28/2019321911106Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/30/2018321466542Open ↗
06/03/2016340186346Open ↗
04/05/2016340186346Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/05/2016340186346Open ↗
12/23/2014340186346Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00726959-I1Open ↗
08/13/2026B00729379-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/30/2017340506483Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/23/2014340186346Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
04/05/2016340186346Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRO FLOW TEST LETTER1
06/19/2019321911080Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/30/2018321466542Open ↗
01/02/2018340506483Open ↗
07/05/2016340186346Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/16/2019321911099Open ↗
04/16/2019321911106Open ↗
02/28/2019321911080Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/31/2009320116780Open ↗
10/17/2007310030686Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
04/05/2016340186346Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
04/18/2019321911106Open ↗
04/18/2019321911106Open ↗
04/18/2019321911106Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
02/28/2019321911080Open ↗
02/28/2019321911099Open ↗
02/28/2019321911106Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
04/18/2019321911106Open ↗
01/02/2018340506483Open ↗
12/23/2014340186346Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/06/2017340508061Open ↗
05/30/2017340506483Open ↗
▸BISBOROUGH INTAKE FORM2
11/30/2018321466542Open ↗
01/02/2018340506483Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/18/2018321466542Open ↗
06/03/2016340186346Open ↗
▸BISTax Abatement Miscellaneous1
04/05/2016340186346Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/03/2016340186346Open ↗