1937Year Built
3Stories
Q1Building Class
PARKZoning
55,350 sfGross Floor Area
0Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 1,032,000 sf lot · 0.05 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
Site & exterior11 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8403/21/2026
NYC Parks1610/04/2026
NYC Department of Education603/22/2026
Generate Capital407/08/2026
NYC School Construction303/21/2026
New York City Department of Educ203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Liro Engineers209/08/2026
Andrew Formichella604/20/2026
Urban Integrations404/18/2025
RP Engineering108/08/2024
Wayne Rendely111/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical603/21/2026
NY TentGeneral Contractor507/08/2026
Winick ProductionsGeneral Contractor507/08/2026
Charan Electrical Enterp'sElectrical103/22/2026
Empower CESGeneral Contractor107/08/2026
Rize ConstructionGeneral Contractor107/08/2026
Walsh LawrenceElectrical103/21/2026
Island ElectricElectrical103/22/2026
Russo ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Liro Engineers4559209/08/2026
Homerun Solar8772108/08/2024
RP Engineering7930108/08/2024
Building Lifecycle
All (224)Filed (14)Permit Issued (6)Signed Off (2)Violation (161)Objection (2)Special Inspection (8)
09/08/2026
Filed — Alteration
Installation of reinforced concrete foundations for eight (8) new approximately 40foot tall site light poles within McCarren Park (NYC Parks property). Scope includes excavation, concrete placement, and backfill.
B01390917-P1
09/02/2026
Closed: Failure to file 2018 external low pressure inspection
DOB violation · closed on the city's record
08/31/2026
Boiler inspection report filed
Initial · defects found · Accepted
08/31/2026
Special inspection requirement — Footing and Foundation
AARON DOLIBER
08/31/2026
Special inspection requirement — Final
AARON DOLIBER
08/31/2026
Special inspection requirement — Concrete - Cast-In-Place
AARON DOLIBER
08/09/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00961690-I1-GC
08/03/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/03/2026
Boiler inspection report filed
Initial · defects found · Accepted
08/03/2026
Boiler inspection report filed
Initial · defects found · QA Supervisor Review
06/04/2026
Permit issued — Structural
B01390917-I1-GC-CX
06/04/2026
Reissue:35717144P exit door not self-closing.1ST floor stair d,exterior door not openning at all.rem:comply with code.
ECB violation · open
05/15/2026
Objection resolved — Addressed
05/06/2026
Objection raised — Other
04/24/2026
Filed — Alteration
Installation of reinforced concrete foundations for eight (8) new approximately 40foot tall site light poles within McCarren Park (NYC Parks property). Scope includes excavation, concrete placement, and backfill.
B01390917-I1
04/22/2026
Special inspection requirement — Footing and Foundation
AARON DOLIBER
04/22/2026
Special inspection requirement — Concrete - Cast-In-Place
AARON DOLIBER
04/22/2026
Special inspection requirement — Final
AARON DOLIBER
04/21/2026
Permit renewed — General Construction
Renewed without changes
B01210963-I1-GC
04/20/2026
Filed — No Work
B01384060-I1
01/08/2026
Boiler inspection report filed
Initial · no defects · Accepted
12/19/2025
Boiler inspection report filed
Initial · no defects · Accepted
11/12/2025
Filed — No Work
B01313511-I1
10/28/2025
Permit renewed — General Construction
Renewed without changes
B00961690-I1-GC
10/22/2025
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
10/22/2025
EG-21-03: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3.
FDNY_ORDER violation · closed
10/22/2025
EG-21-10: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3
FDNY_ORDER violation · closed
10/22/2025
EG-21-13: Failed to maintain emergency power source for exit lighting, exit signs and/or exit directional signs in good working order, in violation…
FDNY_ORDER violation · closed
10/22/2025
PFE-25-01: Failed to produce and/or maintain records for inspection and/or servicing of portable fire extinguisher(s), in violation of FC906.2 and…
FDNY_ORDER violation · closed
10/22/2025
E-21-01: Failed to provide and/or maintain required electrical devices/equipment and/or allowed electrical hazards to exist, in violation of FC605.1.
FDNY_ORDER violation · closed
10/22/2025
GP-57: Failed to maintain walls of hallway corridors free of combustible artworks and/or decorations, in violation of FC805.1.
FDNY_ORDER violation · closed
09/26/2025
FPS-21-01: Failed to provide and maintain fire protection and/or communication system in good working order, in violation of FC901.6.
FDNY_ORDER violation · closed
09/02/2025
Elevator Category 1 inspection report filed
08/25/2025
C-12-01: Failed to obtain and/or produce a Certificate of Fitness for installation of device, equipment, system; conducting an operation; operation…
FDNY_ORDER violation · closed
07/30/2025
VC5: failed to (maintain/produce) records for fire extinguishing system at premises. VC5: failed to (maintain/produce) records for portable fire…
FDNY_NOV violation · closed
05/22/2025
Exit door not self-closing. Noted: at(1ST fl) stair d exterior door indisrepair/not closing when tested. Remedy: repair and/or replace.
ECB violation · open
05/22/2025
Failure to maintain building in code-compliant manner. Illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. Noted:…
ECB violation · open
05/22/2025
Failure to maintain building in code-compliant manner. Use of prohibited door and/or hardware per bc 1008.1.8: 27-371(j). Noted: at all floors…
ECB violation · closed
05/06/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01042415-I1-GC
04/30/2025
Failure to maintain building in code-compliant manner. Noted: at 1ST fl outside of exit d concrete/walkway broken/lifted sections. Remedy: comply…
ECB violation · open
04/30/2025
Failure to miantain building in code-compliant manner. Noted: at(roof bulkhead) stair a(3RD fl) rooms 338, 323, 309(basement) gas meter rm all…
ECB violation · closed
04/23/2025
Closed: Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
DOB violation · closed on the city's record
04/23/2025
Closed: Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
DOB violation · closed on the city's record
04/22/2025
Permit issued — General Construction
B01210963-I1-GC
04/18/2025
Filed — Alteration
Install of temp tent and ancillary structures, no alt to exist structures for Annual NYCRuns BK Half Start. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
B01210963-I1
04/18/2025
Filed — No Work
B01211131-I1
04/15/2025
Special inspection requirement — Final
DANNY TRUJILLO
01/21/2025
Boiler inspection report filed
Initial · no defects · Accepted
12/19/2024
Boiler inspection report filed
Initial · no defects · Accepted
12/12/2024
Signed off — Alteration
INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTEM ON SCHOOL BUILDING ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01086970-I1
11/04/2024
Filed — No Work
B01132587-I1
10/31/2024
RH45: Failed to provide and/or maintain Alarm Logbook at the premises, in violation of FC901.6 and 3 RCNY 907-01(d).
FDNY_ORDER violation · closed
10/25/2024
Permit renewed — General Construction
Renewed without changes
B00961690-I1-GC
10/04/2024
Elevator Category 5 inspection report filed
08/20/2024
Permit issued — Solar
B01086970-I1-SL
08/08/2024
Filed — Alteration
INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTEM ON SCHOOL BUILDING ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01086970-I1
07/09/2024
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
05/06/2024
Permit issued — General Construction
B01042415-I1-GC
04/29/2024
Filed — Alteration
Install of temp tent and ancillary structures, no alt to exist structures for Annual NYCRuns BK Half Start. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
B01042415-I1
04/26/2024
Special inspection requirement — Final
DANNY TRUJILLO
Latest 60 of 224 events.
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch7
09/03/2026B01390917-P1Request the plans ↗
08/27/2026B00857169-I1Request the plans ↗
08/26/2026B00961690-I1Request the plans ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly7
08/27/2026B00857233-I1Request the plans ↗
08/26/2026B00961728-I1Request the plans ↗
08/25/2026B01032786-I1Request the plans ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/23/2010320140575Open ↗
▸BISWORK PERMIT APPLICATION1
03/23/2010320140575Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026B01390917-P1Open ↗
09/03/2026B01390917-I1Open ↗
08/24/2026B01086970-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/05/2026B01390917-P1Open ↗
10/05/2026B01390917-P1Open ↗
10/03/2026B01210963-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
10/05/2026B01390917-P1Open ↗
08/24/2026B01390917-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/23/2010320140575Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/23/2010320140575Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/23/2010320140575Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
02/12/2025302586985Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/23/2010320140575Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026B01086970-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/03/2026B01390917-P1Open ↗
08/17/2026B01384060-I1Open ↗
08/14/2026B01390917-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
09/03/2026B01390917-P1Open ↗
08/14/2026B01390917-I1Open ↗
08/13/2026B01086970-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/23/2010320140575Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01086970-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B01086970-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/23/2010320140575Open ↗