← Back
Walk-up apt, over six families with stores
50 CARMINE STREET
MANHATTAN · West Village · BIN 1008357
💬 Discuss this project
1897Year Built
6Stories
C7Building Class
R6Zoning
8,985 sfGross Floor Area
16Units
Rent Stabilized11 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 50 CARMINE STREET, · 2,000 sf lot · 4.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 65p · 1 filing · 2 docs
Floor 57p · 2 filings · 6 docs
Floor 47p · 2 filings · 6 docs
Floor 37p · 2 filings · 6 docs
Floor 28p · 2 filings · 6 docs
Floor 17p · 2 filings · 6 docs
Cellar4p · 2 filings · 14 docs
Site & exterior5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50 CARMINE STREET4003/22/2026
KINGS GROUP NY807/08/2026
50 CARMINE_RESTAURANT ASSOCIATES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.212/30/2021
ROYAL ENGINEERING, P.C209/26/2018
NORMAN C. LOK, PE103/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES403/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor407/08/2026
CALRAY GAS HEAT CORPPlumbing207/08/2026
JEROME KRITZElectrical203/21/2026
MARK COSTOSOElectrical103/21/2026
SKOWRONSKI JEFFElectrical103/21/2026
CHAIM MILCHMANElectrical103/21/2026
ACTIVE SIGNSScaffold107/08/2026
COACHMEN SOLUTIONS CORPElectrical103/22/2026
JEFF SKOWRONSKIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851112/30/2021
Building Lifecycle
All (43)Filed (5)Permit Issued (5)Signed Off (5)Violation (19)Inspection (2)Special Inspection (7)
09/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY 54' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION#M00082564
M00082560-I1
09/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00082564-I1
03/03/2023
Signed off — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER.
M00633806-I1
03/03/2023
Signed off — Alteration
M00633833-I1
01/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/05/2022
Permit issued — Plumbing
M00633806-I1-PL
01/05/2022
Permit issued — Boiler Equipment
M00633833-I1-BE
12/30/2021
Filed — Alteration
M00633833-I1
12/28/2021
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER.
M00633806-I1
12/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/27/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
12/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/18/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/18/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
10/15/2018
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING DOUBLE FACED PROJECTING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00024312-I1
09/26/2018
Filed — Alteration
INSTALLATION OF TEMPORARY 54' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION#M00082564
M00082560-I1
09/26/2018
Permit issued — Supported Scaffold
M00082560-I1-SF
09/26/2018
Permit issued — Sidewalk Shed
M00082564-I1-SH
09/25/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00082564-I1
04/23/2018
Permit issued — Sign
M00024312-I1-SG
03/27/2018
Filed — Alteration
NON ILLUMINATED NON ADVERTISING DOUBLE FACED PROJECTING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00024312-I1
03/05/2018
Special inspection requirement — Final
NORMAN LOK
10/01/2015
Violation issued (HPD, closed)
I
02/25/2009
Violation issued (ECB, closed)
Construction
06/20/2008
Violation issued (HPD, open)
B
03/07/2007
Violation issued (HPD, open)
B
01/19/2006
Violation issued (HPD, open)
B
01/19/2006
Violation issued (HPD, open)
B
01/19/2006
Violation issued (HPD, open)
B
11/26/2005
Violation issued (HPD, open)
B
07/16/2004
Violation issued (HPD, open)
B
07/16/2004
Violation issued (HPD, open)
B
07/16/2004
Violation issued (HPD, open)
B
07/16/2004
Violation issued (HPD, open)
B
12/04/2003
Violation issued (ECB, closed)
Unknown
05/12/2003
Violation issued (ECB, closed)
Construction
05/12/2003
Violation issued (ECB, closed)
Site Safety
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/1994
Violation issued (HPD, open)
C
08/31/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP01/05/2022
DOB NOWBoiler EquipmentSigned-offCALRAY GAS HEAT CORP01/05/2022
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/26/2018
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/26/2018
DOB NOWSignSigned-offACTIVE SIGNS INC04/23/2018
BISOTISSUEDTOTAL STRUCTURAL CONCEPTS INC01/25/2019
BISOTISSUEDTOTAL STRUCTURAL CONCEPTS INC10/09/2018
BISFPISSUEDSENTINEL FIRE SAFETY CORP01/09/2015
BISOTISSUEDCOOPER WORKS INC12/10/2014
BISEQISSUEDCOOPER WORKS INC12/10/2014
BISPLISSUEDC.H.P.H. CO10/20/2014
BISOTISSUEDCOOPER WORKS INC10/01/2014
BISFPISSUEDCHIEF FIRE PREVENTIO & MECHANICA08/01/2007
BISOTISSUEDBUILTECH ASSOCIATES INC07/26/2007
BISPLISSUEDDC BUILDING SERVICES INC07/03/2007
BISMHISSUEDBUILTECH ASSOCIATES INC07/02/2007
BISEQISSUEDBUILTECH ASSOCIATES INC05/29/2007
BISOTISSUEDBUILTECH ASSOCIATES INC05/03/2007
BISOTISSUEDETNA MAINTEANCE03/22/2004
BISOTISSUEDETNA MAINTEANCE06/10/2003
BISPLISSUEDS & L PLUMBING INC04/29/2003
BISEQISSUEDIDEAL CONTR. INC.03/19/2003
BISMHISSUEDIDEAL CONTR. INC.03/19/2003
BISBLRE-ISSUEDEBM PLUMBING CORP03/24/1998
BISPLRE-ISSUEDEBM PLUMBING CORP03/24/1998
BISOTISSUEDMINCH CONSTRUCTION CORP03/20/1998
BISEQISSUEDSPRING ENTERPRIS INC.03/04/1998
4 projects · most recent 03/23/2025
General Wiring
FiledStatusContractorScope
03/23/2025Permit IssuedCOACHMEN SOLUTIONS CORP1 meters
07/26/2023CompleteCOACHMEN SOLUTIONS CORP1 meters, 1 new_meters
09/07/2021Permit IssuedTAKOS AND K ELECTRIC INCGeneral Wiring
09/25/2018Permit IssuedMEO ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/27/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/27/2021HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/27/2021Maintenance informationLOUIS ARENAenergy_progress
12/27/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/18/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
11/18/2021Heating SystemsLOUIS ARENAspecial
03/05/2018FinalNORMAN LOKprogress
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/06/2026M00024312-I1Request digital key ↗
09/06/2026M00082564-I1Request digital key ↗
09/06/2026M00082560-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
01/28/2019123566658Open ↗
10/09/2018123566658Open ↗
01/23/2015122205997Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/09/2018123566658Open ↗
06/08/2018123566658Open ↗
12/17/2014122205997Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/07/2020123566658Open ↗
02/07/2020123566658Open ↗
02/07/2020123566658Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M00633833-I1Open ↗
09/23/2026M00633833-I1Open ↗
09/23/2026M00633833-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/06/2026M00082564-I1Open ↗
09/06/2026M00082560-I1Open ↗
09/03/2026M00633806-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/11/2014122214184Open ↗
09/30/2014122145785Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/11/2014122214184Open ↗
09/30/2014122145785Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M00633833-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
03/12/2015122145785Open ↗
12/10/2014122145785Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/17/2014122205997Open ↗
09/30/2014122145785Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/16/2018123566658Open ↗
▸BISTenant Protection Plan and Notes1
06/08/2018123566658Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/09/2018123566658Open ↗
12/17/2014122205997Open ↗
12/11/2014122214184Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00633806-I1Open ↗
08/13/2026M00633833-I1Open ↗
08/13/2026M00024312-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/07/2020123566658Open ↗
02/07/2020123566658Open ↗
06/08/2018123566658Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
02/07/2020123566658Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00633833-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00633833-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLANDMARKS APPROVAL5
02/07/2020123566658Open ↗
12/11/2014122214184Open ↗
09/30/2014122145785Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/19/2018123566658Open ↗
09/19/2018123566658Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/07/2020123566658Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
02/07/2020123566658Open ↗
06/08/2018123566658Open ↗
12/17/2014122205997Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
12/15/2014122214184Open ↗
10/03/2014122145785Open ↗
10/03/2014122145785Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
06/08/2018123566658Open ↗
12/17/2014122205997Open ↗
12/11/2014122214184Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
09/07/2018123566658Open ↗
▸BISBOROUGH INTAKE FORM1
02/07/2020123566658Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/08/2018123566658Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00082564-I1Open ↗