RoofUnder Construction22p · 3 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents · 13 drawing sheets
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this job
4 documents · 1 drawing sheet
PenthouseUnder Construction34p · 1 filing · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents
Floor 12Under Construction72p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents · 11 drawing sheets
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 3 drawing sheets
Floor 11Under Construction68p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents · 6 drawing sheets
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 10Under Construction25p · 3 filings · 20 docs
PlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Structural
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 9Under Construction2p · 3 filings · 20 docs
PlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Structural
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
STRUCTURAL WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
7 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 8Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 7Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 6Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 5Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 4Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 3Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 2Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
Floor 1Under Construction2p · 2 filings · 18 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
4 documents
Replacement of gas piping with new exterior risers
On file for this job
14 documents · 2 drawing sheets
MezzanineUnder Construction6p · 1 filing · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
Plumbing
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this job
51 documents · 2 drawing sheets
Cellar4p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
EXISTING LOW PRESSURE GAS SERVICE, NEW GAS LINE (2) NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this job
11 documents · 1 drawing sheet
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER IN CONJUNCTION WITH M00860698. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this job
16 documents · 1 drawing sheet
INSTALL (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER. IN CONJUNCTION WITH REPLACEMENT (1) BOILER/BURNER FILED UNDER APPLICAITON M00859938. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this job
18 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.