RoofUnder Construction14p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sidewalk Shed
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents · 13 drawing sheets
INSTALLATION OF TEMPORARY PLATFORM, AND ROOF, SKYLIGHT, AND OVERHEAD PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
INSTALLATION OF A TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
PenthouseUnder Construction1 filing · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents
Floor 12Under Construction11p · 1 filing · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents · 11 drawing sheets
Floor 11Under Construction8p · 2 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents · 6 drawing sheets
Installation of Plumbing fixtures
On file for this project
5 documents · 2 drawing sheets
Floor 10Under Construction1 filing · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents
Floor 94 filings · 15 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
STRUCTURAL WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 8
Floor 72 filings · 2 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
PERFORM MECHANICAL WORK INCONJUNCTION WITH APT#7B RENOVATION. INSTALL A/C UNITS , REPLACE EXHAUSTS AND ASSOCIATED DUCTWORK. GENERAL CONSTRUCTION AND PLUMBING WORK FILED UNDER SEPERATE APPLICATIONS. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
On file for this project
6 documents
PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH APT#7B RENOVATION. CAP AND REMOVE EXISTING GAS PIPING & EQUIPMENT. GENERAL CONSTRUCTION & MECHANICAL WORK FILED UNDER SEPERATE APPLICATIONS. NO CHANGE TO USE, EGESS, OCCUPANCY OR FIRE PROTECTION.
On file for this project
5 documents
Floor 6
Floor 5
Floor 4
Floor 3
Floor 22 filings · 16 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Structural work in conjunction with proposed general construction to remove dumbwaiter shaft and chimney flues and support structurally. No change to occupancy / use, egress, fire protection under this application.
On file for this project
87 documents
Mechanical air conditioning at apartment 1A/2A at the first and second floor as per plans filed herewith.
On file for this project
14 documents
Floor 12 filings · 2 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents
Mechanical air conditioning at apartment 1A/2A at the first and second floor as per plans filed herewith.
On file for this project
14 documents
MezzanineUnder Construction2p · 1 filing · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
Plumbing
Structural modifications to the base building structure of residential units 11B and 12BC to accommodate new stairs runs, a new dumbwaiter shaft, a new skylight and a mezzanine extension.
On file for this project
51 documents · 2 drawing sheets
Cellar1p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Plumbing
EXISTING LOW PRESSURE GAS SERVICE, NEW GAS LINE (2) NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER IN CONJUNCTION WITH M00860698. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
16 documents · 1 drawing sheet
INSTALL (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER. IN CONJUNCTION WITH REPLACEMENT (1) BOILER/BURNER FILED UNDER APPLICAITON M00859938. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Site & exteriorUnder Construction12 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF A SUPPORTED SCAFFOLD IN THE COURTYARD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 2 drawing sheets
FACADE RESTORATION INCLUDING BRICK REPLACEMENT, BRICK REPOINTING, TERRA COTTTA PATCHING & TERRA COTTA REPLACEMENT WITH GFRC AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 4 drawing sheets
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
On file for this project
12 documents · 6 drawing sheets
Latest 3 of 12 filings on this floor.
Filed — no permit issued2 filings · 12 docs
ArchitectureGeneralMechanicalPlumbingStructural
SIDEWALK REPLACEMENT AND VAULT REPAIRS. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
On file for this project
4 documents · 7 drawing sheets
Removal & installation of non load-bearing partitions, w/ associated plumbing fixtures & finishes as per plans filed herewith. No change to use, occupancy or egress filed under this application. No change to lighting, light controls, switches, mechanical.
On file for this project
8 documents · 12 drawing sheets