Large suburban residence
50 EASTENTRY ROAD
STATEN ISLAND · BIN 5022917
💬 Discuss this project
1905Year Built
2.75Stories
A3Building Class
R1-1Zoning
8,396 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 12,893 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC204/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDLINE ELECTRIC INCElectrical103/22/2026
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500204/28/2025
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (10)
05/14/2025
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S00983752-I1
04/28/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S00983752-P1
04/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jay Kavi
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
04/28/2025
Special inspection requirement — Final
Ayracon Almaraz
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
04/28/2025
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
04/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jay Kavi
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
04/28/2025
Special inspection requirement — Final
Ayracon Almaraz
04/28/2025
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
01/08/2024
Permit issued — Solar
S00983752-I1-SL
01/03/2024
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S00983752-I1
07/28/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC01/08/2024
BISPLISSUEDCAPITAL CONTR P&H CORP09/16/2004
BIS—ISSUEDSALVATORE CALCAGNO CONST04/23/2004
BISEQISSUEDSALVATORE CALCAGNO CONST03/31/2004
BIS—ISSUEDSALVATORE CALCAGNO CONST03/31/2004
1 project · most recent 02/29/2024
FiledStatusContractorScope
02/29/2024CompleteREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/28/2025Structural Stability – Alterations of existing buildingsJay Kavispecial
04/28/2025Fire-Resistant Penetrations and JointsJay Kavispecial
04/28/2025FinalAyracon Almarazprogress
04/28/2025Energy Code Compliance InspectionsAyracon Almarazprogress
04/28/2025Air barrier - visual inspectionAyracon Almarazenergy_progress
04/28/2025Fire-Resistant Penetrations and JointsJay Kavispecial
04/28/2025Structural Stability – Alterations of existing buildingsJay Kavispecial
04/28/2025Energy Code Compliance InspectionsAyracon Almarazprogress
04/28/2025FinalAyracon Almarazprogress
04/28/2025Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S00983752-P1Request digital key ↗
08/21/2026S00983752-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S00983752-I1Open ↗
09/02/2026S00983752-I1Open ↗
09/02/2026S00983752-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026S00983752-I1Open ↗
09/02/2026S00983752-I1Open ↗
08/27/2026S00983752-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S00983752-I1Open ↗
08/21/2026S00983752-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S00983752-I1Open ↗
08/21/2026S00983752-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00983752-I1Open ↗