1879Year Built
4Stories
B9Building Class
R6Zoning
4,352 sfGross Floor Area
2Units
Miscellaneous two family · Owner of record: GARTENHAUS LLC · 1,821 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof25p · 2 filings · 20 docs
Floor 420p · 1 filing · 20 docs
Floor 321p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar26p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2024$6.5M—Private party → GARTENHAUS LLC$1,494/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2403/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEERING HOUSE CONSTRUCTGeneral Contractor1404/09/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
DYNAMIC BLUE WATER MECHPlumbing206/28/2026
FIREQUEST CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC9301306/22/2026
Building Lifecycle
All (124)Filed (17)Permit Issued (13)Signed Off (8)Inspection (12)Objection (44)Special Inspection (30)
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/22/2026
Filed — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-P6
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
04/01/2026
Signed off — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-S1
03/30/2026
Signed off — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-S4
03/30/2026
Signed off — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-S5
03/24/2026
Signed off — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-S3
03/17/2026
Signed off — Alteration
PROPOSE INTERIOR DEMOLITION WORKS OF FINISHES & PARTITION WORKS AS PER PLAN OF EXISTING TWO-FAMILY HOUSE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B01118171-I1
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2026
Signed off — Alteration
Alteration is being filed for the installation of temporary construction fence. NO change in use, egress or occupancy under this application.
B01118519-I1
03/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/13/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/07/2026
Permit issued — Plumbing
B01064017-S2-PL
01/06/2026
Permit issued — Construction Fence
B01118519-I1-FN
01/06/2026
Permit issued — Mechanical Systems
B01064017-S1-MS
11/21/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. THE PIPE SCAFFOLD AT THE FRONT OF THE ELEVATION FROM THE TOP OF THE SIDEWALK SHED TO THE TOP OF THE BU
B01206993-S1
11/21/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. THE PIPE SCAFFOLD AT THE FRONT OF THE ELEVATION FROM THE TOP OF THE SIDEWALK SHED TO THE TOP OF THE BU
B01206993-I1
06/19/2025
Filed — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-P5
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2025
Permit issued — Foundation
B01064017-S5-FO
05/06/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/23/2025
Special inspection requirement — Structural Wood Frame
Joseph Jabour
04/23/2025
Special inspection requirement — Final
Joseph Jabour
04/23/2025
Special inspection requirement — Post-installed Anchors
Joseph Jabour
04/23/2025
Special inspection requirement — Structural Cold-Formed Steel
Joseph Jabour
04/23/2025
Special inspection requirement — Structural Steel - Details
Joseph Jabour
04/23/2025
Special inspection requirement — Masonry
Joseph Jabour
04/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
04/17/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. THE PIPE SCAFFOLD AT THE FRONT OF THE ELEVATION FROM THE TOP OF THE SIDEWALK SHED TO THE TOP OF THE BU
B01206993-S1
04/17/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. THE PIPE SCAFFOLD AT THE FRONT OF THE ELEVATION FROM THE TOP OF THE SIDEWALK SHED TO THE TOP OF THE BU
B01206993-I1
04/17/2025
Permit issued — Supported Scaffold
B01206993-S1-SF
04/17/2025
Permit issued — Sidewalk Shed
B01206993-I1-SH
04/17/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Cost
04/04/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
04/02/2025
Objection resolved — Addressed
03/27/2025
Filed — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-P3
03/27/2025
Filed — Alteration CO
New installation of Plumbing and gas works as subsequent filing for B01064017-I1
B01064017-P2
03/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Jabour
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
03/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
03/27/2025
Special inspection requirement — Chimneys and vents
Joseph Jabour
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP01/07/2026
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT01/06/2026
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT01/06/2026
DOB NOWFoundationSigned-offSTEERING HOUSE CONSTRUCT05/20/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC04/17/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/17/2025
DOB NOWSprinklersSigned-offFIREQUEST CORP03/12/2025
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT12/19/2024
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT12/19/2024
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP12/09/2024
DOB NOWStructuralSigned-offSTEERING HOUSE CONSTRUCT11/01/2024
DOB NOWGeneral ConstructionSigned-offSTEERING HOUSE CONSTRUCT10/10/2024
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT10/04/2024
1 project · most recent 06/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/22/2026Signed-offDYNAMIC BLUE WATER MECHGas, Storm, Water/Sanitary
2 projects · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025CompleteTOP SHELF ELECTRIC CORP—
12/14/2024CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 06/22/2026
Steel Masonry Wood
FiledStatusContractorScope
06/22/2026Signed-offDYNAMIC BLUE WATER MECHSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2026Pass-Final PL - UndergroundPassView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/02/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
06/05/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
06/13/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
04/23/2025Structural Wood FrameJoseph Jabourprogress
04/23/2025FinalJoseph Jabourprogress
04/23/2025Post-installed AnchorsJoseph Jabourspecial
04/23/2025Structural Cold-Formed SteelJoseph Jabourspecial
04/23/2025Structural Steel - DetailsJoseph Jabourspecial
04/23/2025MasonryJoseph Jabourspecial
04/23/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
03/27/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
03/27/2025Fire-Resistance Rated ConstructionJoseph Jabourprogress
03/27/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
03/27/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
03/27/2025Chimneys and ventsJoseph Jabourspecial
03/17/2025Post-installed AnchorsJoseph Jabourspecial
03/17/2025MasonryJoseph Jabourspecial
03/17/2025FinalJoseph Jabourprogress
03/17/2025Structural Wood FrameJoseph Jabourprogress
03/17/2025Structural Steel - DetailsJoseph Jabourspecial
03/17/2025Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
03/17/2025Structural Cold-Formed SteelJoseph Jabourspecial
03/07/2025Sprinkler SystemsJoseph Jabourspecial
03/07/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
03/07/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
Latest 25 of 36.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/24/2026B01064017-I1Request digital key ↗
08/24/2026B01064017-S1Request digital key ↗
08/24/2026B01064017-S4Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/24/2026B01064017-P6Open ↗
08/13/2026B01064017-S5Open ↗
08/13/2026B01064017-P4Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01064017-I1Open ↗
08/13/2026B01064017-P1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026B01064017-S2Open ↗
08/24/2026B01064017-P6Open ↗
08/24/2026B01118171-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026B01064017-P4Open ↗
09/01/2026B01064017-S5Open ↗
09/01/2026B01064017-S5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01064017-P4Open ↗
09/01/2026B01064017-S5Open ↗
09/01/2026B01064017-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01064017-I1Open ↗
08/13/2026B01064017-P1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/24/2026B01064017-P6Open ↗
08/13/2026B01064017-P5Open ↗
08/13/2026B01064017-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026B01118171-I1Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building3
08/13/2026B01064017-I1Open ↗
08/13/2026B01064017-P1Open ↗
08/13/2026B01118171-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026B01064017-I1Open ↗
08/13/2026B01064017-P1Open ↗
▸DOB NOWFinal Survey1