← Back
BuildNYC
One story - permanent living quarter
50 HAWTHORNE AVENUE
STATEN ISLAND · BIN 5030048
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3XZoning
988 sfGross Floor Area
1Units
One story - permanent living quarter · 4,600 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 246p · 2 filings · 20 docs
Floor 141p · 2 filings · 20 docs
Cellar44p · 2 filings · 20 docs
Site & exteriorTemporary construction fence for safety1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TB Associates709/09/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zaim ContractorGeneral Contractor109/13/2026
R Marchese ConstructionScaffold107/08/2026
Capital Contracting P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738308/27/2025
Building Lifecycle
09/11/2026
Permit renewed — General Construction
Renewed with changes
S00992690-I1-GC-CX
02/06/2026
Signed off — Alteration
Plumbing water service, drainage and gas in conjunction with the alteration of a detached residence.
S00992735-I1
11/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Objection resolved — Addressed
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZaim Contractor09/11/2026
DOB NOWPlumbingSigned-offCapital Contracting P&H03/28/2025
DOB NOWConstruction FenceSigned-offR.marchese Construction10/17/2024
1 project · most recent 08/27/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/27/2025Permit IssuedZaim ContractorHeating and Air Conditioning Systems
1 project · most recent 02/25/2025
General Wiring
FiledStatusContractorScope
02/25/2025CompleteJ.V.C. Electric ServiceGeneral Wiring
1 project · most recent 08/27/2025
Wood
FiledStatusContractorScope
08/27/2025Permit IssuedZaim ContractorWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/20/2025Concrete - Cast-In-Placeanthony santorospecial
08/20/2025Mechanical Systemsanthony santorospecial
08/20/2025Subgrade Inspectionsanthony santorospecial
08/20/2025Wood – Prefabricated I-Joistsanthony santorospecial
08/20/2025Energy Code Compliance Inspectionsanthony santoroprogress
08/20/2025Finalanthony santoroprogress
08/20/2025Fire-Resistance Rated Constructionanthony santoroprogress
08/20/2025Footing and Foundationanthony santoroprogress
08/20/2025Structural Wood Frameanthony santoroprogress
08/20/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
08/20/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/20/2025Maintenance informationanthony santoroenergy_progress
08/20/2025Fenestration areasanthony santoroenergy_progress
08/20/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/20/2025Air barrier - visual inspectionanthony santoroenergy_progress
08/20/2025Meteringanthony santoroenergy_progress
08/20/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/20/2025Insulation placement and R valuesanthony santoroenergy_progress
08/20/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
08/20/2025Air barrier — testing anthony santoroenergy_progress
08/20/2025Permanent certificateanthony santoroenergy_progress
08/20/2025Fenestration air leakageanthony santoroenergy_progress
08/20/2025Lighting controlsanthony santoroenergy_progress
08/20/2025Shutoff dampersanthony santoroenergy_progress
08/20/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
Latest 25 of 50.
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account