← Back
BuildNYC
Two stories - detached, small or mid-size
50 HOLLY STREET
STATEN ISLAND · BIN 5022113
💬 Discuss this project
1940Year Built
1.5Stories
A1Building Class
R1-2Zoning
995 sfGross Floor Area
1Units
1 Active Violation 1 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 22p · 1 filing · 14 docs
Floor 12p · 1 filing · 14 docs
Sub-Basement2p · 1 filing · 14 docs
Site & exterior2p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR Architect107/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Adac Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR Architect1171107/25/2023
Norman C. Lok818107/25/2023
Building Lifecycle
09/30/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00898974-I1-GC
09/30/2025
Permit issued — General Construction
S00898974-I1-GC
02/16/2024
Objection resolved — Addressed
02/15/2024
Objection raised — Energy
02/13/2024
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedYafe Meod09/30/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
02/13/2024Energy Code Compliance InspectionsANGEL ROJASprogress
08/25/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationANGEL ROJASspecial
08/15/2023Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
08/15/2023Fenestration air leakageANGEL ROJASenergy_progress
08/15/2023Air barrier - visual inspectionANGEL ROJASenergy_progress
08/15/2023Fenestration areasANGEL ROJASenergy_progress
08/15/2023Insulation placement and R valuesANGEL ROJASenergy_progress
07/01/2023Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
07/01/2023Fire-Resistant Penetrations and JointsANGEL ROJASspecial
07/01/2023MasonryANGEL ROJASspecial
07/01/2023Excavations - Sheeting, Shoring, and BracingNORMAN LOKspecial
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account