← Back
BuildNYC
Elevator cooperative
50 KENILWORTH PLACE
BROOKLYN · BIN 3121600
💬 Discuss this project
1955Year Built
6Stories
D4Building Class
R7AZoning
87,027 sfGross Floor Area
73Units
LL97 CoveredRent Stabilized33 Active Violations 3 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 50 Kenilworth Owners · 26,250 sf lot · 3.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Building alteration project repairs2p · 1 filing · 4 docs
CellarBuilding alteration project repairs1p · 1 filing · 4 docs
Site & exteriorCrack brick repair and replacement7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50 Kenilworth Owners103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SF Associates104/10/2025
Ashraf104/02/2022
Green Design110/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services203/21/2026
Service103/21/2026
Service103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Professional LineScaffold707/08/2026
Apex Group NYGeneral Contractor507/08/2026
EC613General Contractor104/09/2026
J & G GNRLGeneral Contractor108/28/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Safariny7792104/10/2025
Asr Engineering8404104/02/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
08/10/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/27/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED…
HPD violation · open
03/23/2026
Co-op apartment 6K sold for $208,000
03/22/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
239 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEC61312/05/2025
DOB NOWGeneral ConstructionSigned-offApex Group NY06/14/2023
DOB NOWGeneral ConstructionSigned-offApex Group NY05/25/2023
DOB NOWSidewalk ShedSigned-offProfessional Line12/12/2022
DOB NOWGeneral ConstructionSigned-offRoyal Concrete and Mason06/24/2022
DOB NOWSidewalk ShedSigned-offProfessional Line12/13/2021
DOB NOWSidewalk ShedSigned-offProfessional Line10/27/2020
BISEQISSUEDJ & G GNRL08/28/2012
3 projects · most recent 10/22/2020
FiledStatusContractorScope
10/22/2020CompleteRichard Neu—
11/07/2018Permit IssuedAlltech Electrical Contng—
04/26/2018Permit IssuedWCK Electric—
Nothing on file for this building.
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account