← Back
BuildNYC
Elevator apt, semi-fireproof without stores
50 MANHATTAN AVENUE
MANHATTAN · BIN 1055398
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R8Zoning
42,783 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized14 Active Violations 13 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 50-56 Manhattan Avenue · 9,587 sf lot · 4.46 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof50-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 650-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 550-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 450-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 350-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 250-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Floor 150-56 Manhattan Avenue LLC3p · 1 filing · 15 docs
Cellar50-56 Manhattan Avenue LLC12p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation17p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50-56 Manhattan Avenue3107/08/2026
Wick Holding803/21/2026
1436 Lexington503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2019$15.7M—50 MANHATTAN AVENUE LLC → 50-56 Manhattan Avenue$368/sf building
07/06/2016$25.8M—WICK HOLDING CORP. → 50 MANHATTAN AVENUE LLC$603/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AP Professional Engineering405/28/2024
NS Engineers702/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Youber Design1403/21/2026
Sandeep Kaur403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E & M Electrical NYElectrical603/21/2026
Total NY ConstructionScaffold603/21/2026
Clean Tech MechanicalPlumbing407/08/2026
E.C. Electrical ContractorElectrical203/22/2026
Coast GroupGeneral Contractor203/21/2026
Coast GroupScaffold203/21/2026
HY-Lee Electric CoElectrical103/21/2026
Gilston Electric MaintenanceElectrical103/21/2026
High Quality Electric ofElectrical103/22/2026
New Century Electrical ContractingElectrical103/21/2026
High Quality Electric ofElectrical103/21/2026
Lime Stone BuildersGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP Professional Engineering5974105/28/2024
NS Engineers1442406/15/2021
Building Lifecycle
08/10/2026
Elevator Category 1 inspection report filed
05/01/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st…
HPD violation · closed
05/01/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
05/01/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT…
HPD violation · open
05/01/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
247 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCoast Group06/03/2024
DOB NOWSidewalk ShedSigned-offCoast Group04/15/2024
DOB NOWPlumbingPermit IssuedClean Tech Mechanical05/04/2021
DOB NOWBoiler EquipmentSigned-offClean Tech Mechanical04/22/2021
DOB NOWSidewalk ShedSigned-offTotal NY Construction01/12/2021
DOB NOWMechanical SystemsSigned-offLime Stone Builders10/23/2020
DOB NOWBoiler EquipmentSigned-offClean Tech Mechanical09/04/2020
DOB NOWPlumbingPermit IssuedClean Tech Mechanical08/17/2020
DOB NOWSidewalk ShedSigned-offTotal NY Construction06/30/2020
BISOTISSUEDTotal NY Construction10/30/2020
BISOTISSUEDRong Maintenance10/04/2019
BISOTISSUEDRong Maintenance10/04/2019
BISPLISSUEDClean Tech Mechanical10/04/2018
BISOTISSUEDExcel Management & Maintenance10/04/2018
BISPLISSUEDS & L Plumbing06/27/2017
BISPLISSUEDS & L Plumbing06/27/2017
BISPLISSUEDS & L Plumbing06/27/2017
BISOTISSUEDAmaco Management & Consulting05/30/2017
BISOTISSUEDAmaco Management & Consulting05/30/2017
BISOTISSUEDAmaco Management & Consulting05/23/2017
BISOTISSUEDAmaco Management & Consulting03/22/2017
BISOTISSUEDAmaco Management & Consulting03/21/2017
BISPLISSUEDS & L Plumbing12/30/2016
BISPLISSUEDS & L Plumbing12/14/2016
BISOTISSUEDAmaco Management & Consulting11/01/2016
BISPLISSUEDClean Tech Mechanical10/12/2016
BISOTISSUEDAmaco Management & Consulting09/26/2016
BISOTISSUEDAmaco Management & Consulting09/06/2016
BISPLISSUEDS & L Plumbing07/28/2016
BISOTISSUEDAmaco Management & Consulting07/20/2016
BISOTISSUEDSquan Construction Services12/17/2015
BISOTISSUEDSquan Construction Services10/19/2015
BISPLISSUEDApplied Plumbing Systems09/11/2015
BISOTISSUEDGPS Painting of NY08/17/2015
BISOTISSUEDSquan Construction Services07/21/2015
BISOTISSUEDSquan Construction Services06/16/2015
BISOTISSUEDTotal NY Construction05/01/2015
BISOTISSUEDGPS Painting of NY01/29/2015
BISPLISSUEDApplied Plumbing Systems11/26/2014
BISOTISSUEDGPS Painting of NY11/19/2014
+ 11 more permits on file
1 project · most recent 02/17/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/17/2022Permit IssuedClean Tech MechanicalGas, Water/Sanitary
6 projects · most recent 04/17/2024
General Wiring
FiledStatusContractorScope
04/17/2024CompleteHigh Quality Electric of—
05/05/2022Permit IssuedE.C. Electrical ContractorGeneral Wiring
04/30/2021Permit IssuedE.C. Electrical ContractorGeneral Wiring
06/30/2020CompleteRichard Neu—
06/19/2020CompleteDemand Electric—
01/29/2019Permit IssuedE & M Electrical NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/18/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/28/2024MasonryGURVINDER SINGHspecial
04/18/2024Tenant Protection Plan ComplianceGURVINDER SINGHspecial
06/16/2021HVAC and service water heating system controlsShamsul Siddiqueenergy_progress
06/16/2021HVAC and service water heating equipmentShamsul Siddiqueenergy_progress
06/16/2021Mechanical SystemsShamsul Siddiquespecial
06/16/2021Maintenance informationShamsul Siddiqueenergy_progress
06/16/2021HVAC and service water heating equipmentShamsul Siddiqueenergy_progress
06/16/2021HVAC and service water heating system controlsShamsul Siddiqueenergy_progress
06/16/2021HVAC insulation and sealingShamsul Siddiqueenergy_progress
06/16/2021Maintenance informationShamsul Siddiqueenergy_progress
06/16/2021Heating SystemsShamsul Siddiquespecial
06/16/2021Chimneys and ventsShamsul Siddiquespecial
06/16/2021FinalShamsul Siddiqueprogress
06/03/2021Maintenance informationShamsul Siddiqueenergy_progress
06/03/2021HVAC and service water heating system controlsShamsul Siddiqueenergy_progress
06/03/2021Heating SystemsShamsul Siddiquespecial
06/03/2021HVAC and service water heating equipmentShamsul Siddiqueenergy_progress
356 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account