50 PARK TERRACE EAST
MANHATTAN · Inwood · BIN 1065028
💬 Discuss this project
1941Year Built
6Stories
D4Building Class
R7AZoning
106,983 sfGross Floor Area
70Units
LL97 CoveredRent Stabilized1 Active Violation 1 likely answered ▸FISP: SAFE
Elevator cooperative · Owner of record: Park Terrace Owners · 16,700 sf lot · 6.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade restoration and repair1p · 2 filings · 10 docs
Floor 5Unit 5D, Unit 5EUnder Construction4p · 1 filing · 8 docs
Floor 4
Floor 3Unit 3A, Unit 3G, Unit 3M4p · 4 filings · 17 docs
Floor 2Unit 2A, Unit 2B1p · 2 filings · 8 docs
Floor 1
CellarCellar tenant laundry washer dryer and sprinkler installatio2p · 2 filings · 7 docs
Site & exteriorTemporary sidewalk shed installation22p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Terrace Owners2203/22/2026
Phoenix403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Prof. Engineering110/30/2025
Kelley Design609/10/2025
Sam Architecture106/06/2025
Moore Associates112/01/2023
GBN Engineering106/22/2022
Jane Kim Design205/06/2021
KZ Engineering405/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants403/21/2026
AE Design Solution603/21/2026
CCBS Consultants403/21/2026
Progeny Management & Expediting Services803/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EZ Runer ConstructionPlumbing607/08/2026
Ceprine ConstructionScaffold603/21/2026
EZ Runer ConstructionGeneral Contractor407/08/2026
Gotham CommunicationsGeneral Contractor107/08/2026
Mega Project ManagementGeneral Contractor104/09/2026
Powers Bridging & ScaffoldingScaffold104/09/2026
C.Q. Electr'l ContractingElectrical103/21/2026
New York Plumbing-Heating-CoolingPlumbing107/08/2026
RSC Electrical CoElectrical103/21/2026
Optimal ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mohammad Ahead - Professi9286210/13/2025
Erik Sun, Architect3010209/10/2025
S.A.M. Architecture5901106/06/2025
Moore Engineering of NY9134112/01/2023
GBN Engineering4670106/22/2022
Building Lifecycle
All (166)Filed (18)Permit Issued (16)Signed Off (12)Facade (FISP) (12)Violation (60)Inspection (14)Objection (18)Special Inspection (16)
08/10/2026
Signed off — Alteration
Combination of apartments #5E & 5D. Cap one gas range in Apt. 5E, one sink, and add one clothes washer. No change of use, egress, or occupancy.
M01263454-S1
08/03/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01302310-I1
06/10/2026
Signed off — Alteration
Facade restoration with brick pointing, brick replacement, coping stone restoration, ornamental stone repair, damaged gravity roof/wall mounted vent replacement and other miscellaneous facade repair works.
M01236941-I1
12/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2025
Permit issued — General Construction
M01263454-I1-GC
11/20/2025
Permit issued — Plumbing
M01263454-S1-PL
11/03/2025
Permit issued — Sidewalk Shed
M01302310-I1-SH
10/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01302310-I1
10/23/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
10/23/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/16/2025
Objection raised — Admin
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Plumbing
10/15/2025
Objection raised — Scope
10/15/2025
Objection raised — Cost
10/15/2025
Objection raised — Cost
10/15/2025
Objection raised — Scope
10/13/2025
Filed — Alteration
installation of suspended scaffold for facade work and/or inspection . Amend #1 added scaffold drops
M01260445-P1
10/13/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
10/13/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
09/10/2025
Filed — Alteration
Combination of apartments #5E & 5D. Cap one gas range in Apt. 5E, one sink, and add one clothes washer. No change of use, egress, or occupancy.
M01263454-S1
09/10/2025
Filed — Alteration
Combination of apartments #5E & 5D. Cap one gas range in Apt. 5E, one sink, and add one clothes washer. No change of use, egress, or occupancy.
M01263454-I1
07/31/2025
Permit issued — Suspended Scaffold
M01260445-I1-SC
07/30/2025
Objection raised — Other
07/30/2025
Objection resolved — Addressed
07/29/2025
Filed — Alteration
installation of suspended scaffold for facade work and/or inspection . Amend #1 added scaffold drops
M01260445-I1
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK SUN
07/29/2025
Special inspection requirement — Final
ERIK SUN
07/21/2025
Permit issued — General Construction
M01236941-I1-GC
06/06/2025
Filed — Alteration
Facade restoration with brick pointing, brick replacement, coping stone restoration, ornamental stone repair, damaged gravity roof/wall mounted vent replacement and other miscellaneous facade repair works.
M01236941-I1
06/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sajjad Malik
06/05/2025
Special inspection requirement — Final
Sajjad Malik
06/05/2025
Special inspection requirement — Post-installed Anchors
Sajjad Malik
06/05/2025
Special inspection requirement — Masonry
Sajjad Malik
02/12/2025
Signed off — Alteration
INSTALLATION OF WASHER MACHINES AND GAS DRYERS FOR ACCESSORY USE TENANT'S LAUNDRY AT CELLAR. WORK ALSO INCLUDES NEW SPRINKLER HEADS OFF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPNACY
M00962765-I1
02/21/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
01/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/13/2024
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
12/13/2023
Permit issued — Plumbing
M00962765-I1-PL
12/01/2023
Filed — Alteration
INSTALLATION OF WASHER MACHINES AND GAS DRYERS FOR ACCESSORY USE TENANT'S LAUNDRY AT CELLAR. WORK ALSO INCLUDES NEW SPRINKLER HEADS OFF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPNACY
M00962765-I1
11/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MOORE
11/06/2023
Signed off — Alteration
M00728765-I1
05/24/2023
Cycle 9 facade report submitted
05/23/2023
Cycle 9 facade inspection completed
05/22/2023
Cycle 9 facade report signed — SAFE
03/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/21/2023
Signed off — Alteration
M00728768-I1
02/21/2023
Signed off — Alteration
M00659293-I1
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEZ Runer Construction11/24/2025
DOB NOWPlumbingSigned-offEZ Runer Construction11/20/2025
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol11/03/2025
DOB NOWSuspended ScaffoldPermit IssuedMega Project Management07/31/2025
DOB NOWGeneral ConstructionSigned-offMega Project Management07/21/2025
DOB NOWPlumbingSigned-offNew York Plumbing-Heating-Cooling12/13/2023
DOB NOWPlumbingPermit IssuedEZ Runer Construction02/08/2023
DOB NOWPlumbingPermit IssuedEZ Runer Construction08/23/2022
DOB NOWGeneral ConstructionSigned-offEZ Runer Construction08/23/2022
DOB NOWAntennaSigned-offGotham Communications08/22/2022
DOB NOWGeneral ConstructionSigned-offEZ Runer Construction08/09/2022
DOB NOWPlumbingSigned-offEZ Runer Construction08/08/2022
DOB NOWPlumbingSigned-offEZ Runer Construction11/20/2021
DOB NOWGeneral ConstructionSigned-offEZ Runer Construction05/03/2021
DOB NOWSupported ScaffoldSigned-offCeprine Construction01/23/2019
DOB NOWSidewalk ShedSigned-offCeprine Construction01/22/2019
BISOTISSUEDAwr Group03/21/2019
BISOTISSUEDAvarga Contracting06/05/2017
BISEQISSUEDPhoenix Sutton STR04/04/2017
BISEQISSUEDPhoenix Sutton STR04/04/2017
BISOTISSUEDSquan Construction Services10/06/2015
BISEQISSUEDEverest Scaffolding09/25/2015
BISOTISSUEDSquan Construction Services08/11/2015
BISOTISSUEDAvarga Contracting07/13/2015
BISOTISSUEDAvarga Contracting01/21/2015
BISEQISSUEDEverest Scaffolding10/06/2014
BISOTISSUEDAvarga Contracting08/25/2014
BISOTISSUEDAccura Restoration04/11/2013
BISOTISSUEDTrinity Technologies03/05/2013
BISOTISSUEDOdyssia Global Commercial08/09/2012
BISOTISSUEDTelcom Engineering GP12/30/2011
BISPLISSUEDNeptune Mechanical03/24/2004
BISOTISSUEDAntoine Renovation and Construction12/05/2003
BISOTISSUEDGJF Construction10/10/2000
BISPLISSUEDNeptune Mechanical05/10/2000
BISOTISSUEDSame03/16/2000
BISOTISSUEDN/A01/26/2000
BISPLISSUEDNeptune Mechanical05/21/1999
BISOTISSUEDOwner08/05/1998
BISPLISSUEDBargain Plumbing11/19/1997
1 project · most recent 09/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2025Signed-offEZ Runer ConstructionGas, Water/Sanitary
4 projects · most recent 10/20/2025
FiledStatusContractorScope
10/20/2025Permit IssuedOptimal Electric—
11/20/2019Permit IssuedIlluminous Electric—
01/11/2019CompleteV. Vass Electric—
01/02/2019CompleteV. Vass Electric—
1 project · most recent 10/30/2025
Sidewalk Shed
FiledStatusContractorScope
10/30/2025Signed-offPowers Bridging & ScaffolSidewalk Shed
1 project · most recent 10/13/2025
Suspended Scaffold
FiledStatusContractorScope
10/13/2025Permit IssuedMega Project ManagementSuspended Scaffold
1 project · most recent 10/13/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/13/2025Permit IssuedMega Project ManagementSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/18/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
01/13/2024Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
03/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/23/2025Post-installed AnchorsMOHAMMAD AHEADspecial
10/23/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
10/13/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
10/13/2025Post-installed AnchorsMOHAMMAD AHEADspecial
07/29/2025Fire-Resistant Penetrations and JointsERIK SUNspecial
07/29/2025FinalERIK SUNprogress
06/05/2025Tenant Protection Plan ComplianceSajjad Malikspecial
06/05/2025FinalSajjad Malikprogress
06/05/2025Post-installed AnchorsSajjad Malikspecial
06/05/2025MasonrySajjad Malikspecial
11/17/2023Tenant Protection Plan ComplianceJAMES MOOREspecial
02/21/2022Lighting in dwelling unitsBeth Kelleyenergy_progress
01/07/2022Energy Code Compliance InspectionsBeth Kelleyprogress
01/07/2022FinalBeth Kelleyprogress
05/28/2019FinalKarol Zdancewiczprogress
05/28/2019FinalKarol Zdancewiczprogress
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch14
09/04/2026M00483882-I1Request digital key ↗
09/03/2026M00515264-I1Request digital key ↗
09/02/2026M00659293-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00118494-P1Request digital key ↗
09/05/2026M00118494-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00118499-I1Request digital key ↗
08/15/2026M00118499-P1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION19
10/27/2021102585631Open ↗
10/20/2021102585631Open ↗
10/13/2021102585631Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION17
03/21/2019123593441Open ↗
06/07/2017122973764Open ↗
04/03/2017140625018Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWHPD - Permit Notice1
08/13/2026M00483882-I1Open ↗
▸Seals & Professional Certifications74
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
12/19/2018123593441Open ↗
07/31/2018122973764Open ↗
07/31/2018122973764Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00118494-P1Open ↗
09/05/2026M00118494-I1Open ↗
09/05/2026M00118499-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/26/2026M00962765-I1Open ↗
09/22/2026M01260445-P1Open ↗
09/22/2026M01260445-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026M01236941-I1Open ↗
08/31/2026M01263454-I1Open ↗
08/26/2026M00659293-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/19/2018123593441Open ↗
04/03/2017140625018Open ↗
04/03/2017140624947Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/03/2017140625018Open ↗
04/03/2017140624947Open ↗
10/05/2014140263337Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/03/2017140625018Open ↗
04/03/2017140624947Open ↗
10/05/2014140263337Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/21/2019123593441Open ↗
12/19/2018123593441Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
08/13/2012121111661Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES5
11/03/2021102585631Open ↗
04/03/2017140625018Open ↗
04/03/2017140624947Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/05/2026M00118499-I1Open ↗
09/05/2026M00118499-P1Open ↗
09/03/2026M00515264-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/21/2019123593441Open ↗
04/03/2017140624947Open ↗
06/11/2015122410159Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
10/07/2011120843800Open ↗
07/01/2010120403090Open ↗
07/01/2010120403090Open ↗
Showing 3 of 5 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
06/09/2017122973764Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/31/2018122973764Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/02/2013121568972Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
12/19/2018123593441Open ↗
07/31/2018122973764Open ↗
07/31/2018122973764Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/31/2018122973764Open ↗
10/17/2016122054980Open ↗
06/02/2016122410159Open ↗
Showing 3 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
04/03/2017140625018Open ↗
10/05/2014140263337Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00659293-I1Open ↗
08/13/2026M00728765-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/07/2011120843800Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/11/2021102585631Open ↗
11/11/2021102585631Open ↗
04/03/2017140625018Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
04/03/2017140624947Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
11/12/2021102585631Open ↗
07/31/2018122973764Open ↗
07/16/2018122973764Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/04/2017122973764Open ↗
10/29/2014121111661Open ↗
07/30/2013120843800Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/02/2013121568972Open ↗
06/29/2012121111661Open ↗
07/01/2010120403090Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT19
12/19/2018123593441Open ↗
07/31/2018122973764Open ↗
12/29/2016122973764Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM6
03/19/2019123593441Open ↗
07/31/2018122973764Open ↗
07/31/2018122973764Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
03/21/2019123593441Open ↗
03/28/2018122973764Open ↗
08/30/2016122054980Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
12/19/2018123593441Open ↗
12/29/2016122973764Open ↗
06/11/2015122410159Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/03/2017140625018Open ↗
04/03/2017140624947Open ↗
10/05/2014140263337Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/21/2026M01260445-I1Open ↗
08/13/2026M01260445-P1Open ↗
▸DOB NOWCalculations2
08/21/2026M01260445-I1Open ↗
08/13/2026M01260445-P1Open ↗
▸DOB NOWHPD - Completion Notice1
08/13/2026M00483882-I1Open ↗