← Back
BuildNYC
Elevator cooperative
50 PARK TERRACE WEST
MANHATTAN · Inwood · BIN 1065031
💬 Discuss this project
1925Year Built
6Stories
D4Building Class
R7AZoning
47,477 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized39 Active Violations 32 unresolved · 7 paperwork only 3 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Inwood Tenants · 10,175 sf lot · 4.67 FAR built · Flood zone X
Locations of Work
StructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Blue Woods Management Group, INC.9p · 2 filings · 17 docs
Site & exteriorSidewalk Shed Installation4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Inwood Tenants3303/22/2026
Matthew Adam Properties203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering409/08/2023
Enthink Engineers107/06/2021
Asif Jamil, RA111/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United King ConstructionScaffold707/08/2026
Rock Group NYScaffold303/21/2026
Cape PlumbingPlumbing207/08/2026
Century Electric CoElectrical103/22/2026
Goldman ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Collado Engineering3432409/08/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/22/2026
Co-op apartment 1B sold for $350,000
07/22/2026
Co-op apartment 1C sold for $565,000
02/05/2026
Co-op apartment 6B sold for $397,000
01/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
161 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCape Plumbing09/16/2022
DOB NOWSidewalk ShedPermit IssuedUnited King Construction05/06/2022
DOB NOWSidewalk ShedPermit IssuedUnited King Construction11/04/2021
DOB NOWSidewalk ShedPermit IssuedUnited King Construction07/06/2021
DOB NOWSidewalk ShedPermit IssuedRock Group NY11/26/2019
BISOTISSUEDJRR Contracting05/22/2023
BISOTISSUEDJRR Contracting03/24/2022
BISOTISSUEDJRR Contracting09/27/2021
BISOTISSUEDDedvukaj Builders Group05/01/2019
BISPLISSUEDCape Plumbing08/20/2018
BISOTISSUEDDedvukaj Builders Group07/23/2018
BISPLISSUEDCape Plumbing04/17/2018
BISOTISSUEDDedvukaj Builders Group04/02/2018
BISOTISSUEDMichael Definis All Pro02/08/2018
BISOTISSUEDBuilt in Brooklyn Construction05/25/2017
BISOTISSUEDEcotech Contracting05/19/2016
BISOTISSUEDHome Improvement Construction09/16/2015
BISOTISSUEDTitan Construction Services06/25/2015
BISOTISSUEDStandard Waterproofing03/08/2012
BISEQISSUEDArsenal Scaffold03/01/2012
BISOTISSUEDStandard Waterproofing09/26/2011
BISOTISSUEDStandard Waterproofing07/26/2011
BISEQISSUEDArsenal Scaffold03/09/2011
BISFSISSUEDC C Controlled Combustion03/25/2008
BISOTISSUEDAccura Restoration09/12/2006
BISOTISSUEDAccura Restoration04/07/2006
BISEQISSUEDRockledge Scaffold01/10/2006
BISEQISSUEDColgate Scaffolding06/16/1998
BISEQISSUEDLee Mark08/27/1990
4 projects · most recent 03/22/2022
General Wiring
FiledStatusContractorScope
03/22/2022CompleteCentury ElectricGeneral Wiring
07/06/2021Permit IssuedRichard Neu—
11/20/2019Permit IssuedIlluminous Electric—
08/30/2018Permit IssuedGoldman ElectricGeneral Wiring
1 project · most recent 07/06/2021
Sidewalk Shed
FiledStatusContractorScope
07/06/2021Permit IssuedUnited King ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/11/2023Post-installed AnchorsAndrew Hlushkospecial
05/25/2023Post-installed AnchorsAndrew Hlushkospecial
01/11/2023Post-installed AnchorsAndrew Hlushkospecial
196 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account