← Back
BuildNYC
Two family frame
50 RUGBY ROAD
BROOKLYN · BIN 3116420
💬 Discuss this project
1899Year Built
2.75Stories
B2Building Class
R3XZoning
2,460 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior house renovation and wall removal3p · 2 filings · 20 docs
Floor 3Interior house renovation and wall removal36p · 4 filings · 20 docs
Floor 2Interior house renovation and wall removal35p · 4 filings · 20 docs
Floor 1Interior house renovation and wall removal36p · 4 filings · 20 docs
CellarPartition removal and new finishes8p · 3 filings · 20 docs
BasementInterior house renovation and wall removal3p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/13/2021$2.0M—50 RUGBY ROAD LLC → Private party$813/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Julie Mee Schmidt Architecture402/09/2024
Cuono Engineering301/30/2023
New Age102/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Azar Associates703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Around the Clock CNSN GroupGeneral Contractor707/08/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chang Park Arch663702/09/2024
New Age Engineering7746102/23/2022
Building Lifecycle
06/17/2024
Signed off — Alteration
MINOR NON-STRUCTURAL PARTITION REMOVL, NEW FINISH FLOORING, NEW PARTITIONS, DROPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650572-I1
03/14/2024
Objection resolved — Addressed
03/06/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Scope
02/09/2024
Filed — Alteration
MINOR NON-STRUCTURAL PARTITION REMOVL, NEW FINISH FLOORING, NEW PARTITIONS, DROPED CEILINGS, FINISHES AND CABINETS, NO CHANGE TO OCCUPANCY USE OR EGRESS
B00650572-P2
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAround the Clock CNSN Group10/04/2022
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG04/22/2022
DOB NOWMechanical SystemsPermit IssuedAround the Clock CNSN Group02/26/2022
DOB NOWGeneral ConstructionSigned-offAround the Clock CNSN Group01/12/2022
1 project · most recent 02/23/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
02/23/2022Permit IssuedAround the Clock CNSN GroupAir Conditioning Systems, Heating Systems
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/09/2024Lighting in dwelling unitsChang Parkenergy_progress
02/09/2024Interior lighting powerChang Parkenergy_progress
02/09/2024Lighting controlsChang Parkenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsChang Parkspecial
02/09/2024FinalChang Parkprogress
01/31/2023Structural Steel - DetailsChang Parkspecial
01/31/2023FinalCIRO CUONOprogress
01/31/2023Structural Wood FrameChang Parkprogress
01/31/2023Structural Steel - WeldingChang Parkspecial
01/31/2023Structural Steel - High Strength BoltingChang Parkspecial
01/31/2023Structural Cold-Formed SteelChang Parkspecial
01/31/2023Structural Stability – Alterations of existing buildingsChang Parkspecial
01/26/2023Structural Cold-Formed SteelChang Parkspecial
01/26/2023Structural Stability – Alterations of existing buildingsChang Parkspecial
01/26/2023Structural Steel - DetailsChang Parkspecial
01/26/2023Structural Steel - High Strength BoltingChang Parkspecial
01/26/2023Structural Steel - WeldingChang Parkspecial
01/26/2023FinalCIRO CUONOprogress
01/26/2023Structural Wood FrameChang Parkprogress
02/23/2022HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
02/23/2022Maintenance informationStephen Shishkoenergy_progress
02/23/2022HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/13/2022Mechanical SystemsStephen Shishkospecial
01/13/2022Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/13/2022FinalStephen Shishkoprogress
Latest 25 of 26.
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account