50 SOUTH BRIDGE STREET
STATEN ISLAND · Tottenville-Charleston · BIN 5167804
💬 Discuss this project
2025Year Built
1Stories
K1Building Class
M1-1Zoning
5,088 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 800 RAHWAY AVE LLC · 12,500 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 31p · 1 filing · 2 docs
Floor 2
Floor 113p · 5 filings · 20 docs
Cellar1p · 1 filing · 20 docs
Site & exterior3p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARIANAS2407/08/2026
ARIANA'S1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE1101/13/2026
TERRA PRETA ARCHITECTS209/04/2025
A TECH ENGINEERING NYC, PLLC.205/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN CONCEPTS203/21/2026
A TECH ENGINEERING NYC403/21/2026
THINK DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2D CONSTRUCTION CORPGeneral Contractor607/08/2026
ONOFRIO LODUCA PLBG CORPPlumbing307/08/2026
MEMA GENERAL CONTR CORPGeneral Contractor207/08/2026
ONOFRIO LODUCA PLBG CORP.Fire Protection107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738904/30/2025
Building Lifecycle
All (163)Filed (15)Permit Issued (11)Signed Off (7)Violation (47)Inspection (15)Objection (38)Special Inspection (30)
03/30/2026
Signed off — New Building
application filed for a new 1 story commercial building (banquet Hall establishment). And to obtain new C.O. Filed in direct response to vacate order and ECB Violation #39080845H;39067100R;39067099Z;39067101Z.
S00823564-I1
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2026
Special inspection requirement — Public Assembly Emergency Lighting
anthony santoro
01/13/2026
Filed — No Work
S01311484-P1
01/05/2026
Special inspection requirement — Public Assembly Emergency Lighting
anthony santoro
11/24/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Scope
11/04/2025
Filed — No Work
S01311484-I1
09/26/2025
Special inspection requirement — Mechanical Systems
anthony santoro
09/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/26/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/26/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
09/26/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
09/26/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/26/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
09/26/2025
Special inspection requirement — Footing and Foundation
anthony santoro
09/26/2025
Special inspection requirement — Final
anthony santoro
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
09/26/2025
Special inspection requirement — Interior lighting power
anthony santoro
09/26/2025
Special inspection requirement — Masonry
anthony santoro
09/26/2025
Special inspection requirement — Maintenance information
anthony santoro
09/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
09/26/2025
Special inspection requirement — Fenestration areas
anthony santoro
09/26/2025
Special inspection requirement — Lighting controls
anthony santoro
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/26/2025
Special inspection requirement — Metering
anthony santoro
09/26/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/26/2025
Special inspection requirement — Exterior lighting power
anthony santoro
09/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
09/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/26/2025
Special inspection requirement — Shutoff dampers
anthony santoro
09/26/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
09/26/2025
Special inspection requirement — Heating Systems
anthony santoro
09/23/2025
Signed off — Alteration
S01276972-I1
09/23/2025
Signed off — Alteration
APPLICATION FILED TO LEGALIZE REMOVAL OF THE MONOPOLE SIGN, CORRECTING DOB VIOLATION #'S 012915CFEU50310PS;072915CFEU50303PS;032923CFEU50315PS;113013CSGSTF03AM
S01258164-I1
09/22/2025
Permit issued — General Construction
S01276972-I1-GC
09/22/2025
Permit issued — General Construction
S01258164-I1-GC
09/04/2025
Filed — Alteration
S01276972-I1
07/21/2025
Filed — Alteration
APPLICATION FILED TO LEGALIZE REMOVAL OF THE MONOPOLE SIGN, CORRECTING DOB VIOLATION #'S 012915CFEU50310PS;072915CFEU50303PS;032923CFEU50315PS;113013CSGSTF03AM
S01258164-I1
07/10/2025
Violation issued (ECB, closed)
Construction
05/06/2025
Signed off — Alteration
S00834179-I1
04/30/2025
Filed — New Building
application filed for a new 1 story commercial building (banquet Hall establishment). And to obtain new C.O. Filed in direct response to vacate order and ECB Violation #39080845H;39067100R;39067099Z;39067101Z.
S00823564-P7
04/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/16/2024
Signed off — New Building
application filed for a new 1 story commercial building (banquet Hall establishment). And to obtain new C.O. Filed in direct response to vacate order and ECB Violation #39080845H;39067100R;39067099Z;39067101Z.
S00823564-S1
12/13/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S08044788-I1
12/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/29/2024
Signed off — Alteration
S00843247-I1
08/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2024
Filed — New Building
application filed for a new 1 story commercial building (banquet Hall establishment). And to obtain new C.O. Filed in direct response to vacate order and ECB Violation #39080845H;39067100R;39067099Z;39067101Z.
S00823564-P6
07/17/2024
Filed — New Building
application filed for a new 1 story commercial building (banquet Hall establishment). And to obtain new C.O. Filed in direct response to vacate order and ECB Violation #39080845H;39067100R;39067099Z;39067101Z.
S00823564-P3
07/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/09/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMEMA GENERAL CONTR CORP09/22/2025
DOB NOWGeneral ConstructionSigned-offMEMA GENERAL CONTR CORP09/22/2025
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP04/08/2024
DOB NOWGeneral ConstructionPermit Issued2D CONSTRUCTION CORP04/05/2024
DOB NOWSprinklersSigned-offONOFRIO LODUCA PLBG CORP.03/27/2024
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP03/26/2024
DOB NOWCurb CutSigned-off2D CONSTRUCTION CORP03/22/2024
DOB NOWConstruction FenceSigned-off2D CONSTRUCTION CORP01/02/2024
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP12/15/2023
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC11/17/2023
DOB NOWStructuralPermit Issued2D CONSTRUCTION CORP10/26/2023
BISOTISSUEDRH MEDIA SERVICES INC10/21/2015
BIS—ISSUEDRED HOOK SIGN AND ELECT10/21/2015
BIS—ISSUEDCLEAR CHANNEL OUTDOOR INC05/11/2004
BIS—ISSUEDARTKRAFT STRAUSS SIGN CORP.04/07/1994
BIS—ISSUEDARTKRAFT STRAUSS SIGN CORP.03/21/1994
1 project · most recent 04/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/30/2025Permit Issued2D CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Rheem RGEDZR120ACA 157,500 BTU · Rooftop Unit ×3
Trane GBC240A3EHB09D 280,000 BTU · Rooftop Unit ×2
— GBC240A3EHB 20 tons · Rooftop Unit ×1
Ventilation
N/A n/a 3,000 CFM ×1
1 project · most recent 04/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/30/2025Signed-offGRECO INDUSTRIES LLCGas, Storm, Water/Sanitary
2 projects · most recent 03/11/2024
General Wiring
FiledStatusContractorScope
03/11/2024CompleteCNB ELECTRICAL INC1 meters, 1 new_meters
11/12/2019CompleteS & V ELECTRICAL CORPGeneral Wiring
1 project · most recent 04/30/2025
Steel Masonry
FiledStatusContractorScope
04/30/2025Permit Issued2D CONSTRUCTION CORPSteel, Masonry
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/09/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
01/15/2026Public Assembly Emergency Lightinganthony santoroprogress
01/05/2026Public Assembly Emergency Lightinganthony santoroprogress
09/26/2025Mechanical Systemsanthony santorospecial
09/26/2025Heating Systemsanthony santorospecial
09/26/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/26/2025Subgrade Inspectionsanthony santorospecial
09/26/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
09/26/2025Masonryanthony santorospecial
09/26/2025Structural Steel - Detailsanthony santorospecial
09/26/2025Concrete - Cast-In-Placeanthony santorospecial
09/26/2025Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
09/26/2025Footing and Foundationanthony santoroprogress
09/26/2025Energy Code Compliance Inspectionsanthony santoroprogress
09/26/2025Fire-Resistance Rated Constructionanthony santoroprogress
09/26/2025Interior lighting poweranthony santoroenergy_progress
09/26/2025Insulation placement and R valuesanthony santoroenergy_progress
09/26/2025Maintenance informationanthony santoroenergy_progress
09/26/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/26/2025Fenestration areasanthony santoroenergy_progress
09/26/2025Lighting controlsanthony santoroenergy_progress
09/26/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/26/2025Meteringanthony santoroenergy_progress
09/26/2025Air barrier - visual inspectionanthony santoroenergy_progress
09/26/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/26/2025Exterior lighting poweranthony santoroenergy_progress
Latest 25 of 118.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/23/2026S00843247-I1Request digital key ↗
08/23/2026S00834179-I1Request digital key ↗
08/22/2026S08044788-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/18/2026S01311484-P1Request digital key ↗
08/18/2026S01311484-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION29
11/03/2023500684315Open ↗
11/02/2023500684315Open ↗
10/04/2023500684324Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
10/04/2023500684324Open ↗
08/03/2023520247153Open ↗
08/03/2023520184309Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Stormwater Construction Permit4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
10/27/2015520247153Open ↗
10/27/2015520184309Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
11/03/2023500684315Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/12/2022540239017Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/21/2026S00823564-I1Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026S00823564-I1Open ↗
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026S00823564-I1Open ↗
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026S00823564-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWSpecial Inspector Seal & Signature19
09/28/2026S00823564-P7Open ↗
09/28/2026S00823564-P7Open ↗
09/28/2026S00823564-P7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/23/2026S00843247-I1Open ↗
08/23/2026S00834179-I1Open ↗
08/22/2026S08044788-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/28/2026S00823564-P7Open ↗
09/25/2026S01258164-I1Open ↗
09/12/2026S00823564-P3Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/15/2015520184309Open ↗
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/29/2022540239017Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/29/2022540239017Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/21/2026S00823564-I1Open ↗
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/21/2026S00823564-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/21/2026S00823564-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026S00823564-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/15/2015520184309Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/29/2022540239017Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/21/2026S00823564-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/12/2022540239017Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
03/01/2023540239017Open ↗
03/04/2020520247153Open ↗
05/21/2019520247153Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
11/26/2024540239017Open ↗
02/21/2020520247153Open ↗
05/01/2019520247153Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
09/15/2015520184309Open ↗
08/27/2015520247153Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026S00823564-P7Open ↗
08/21/2026S00823564-P3Open ↗
08/21/2026S00823564-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: WAIVER OF GRADE FILING1
11/26/2024540239017Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/21/2022540239017Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
11/21/2022540239017Open ↗
▸DOB NOWFinal Survey1
08/21/2026S00823564-I1Open ↗