← Back
BROOKLYN
50 SPARROW WAY
BROOKLYN · BIN 3430120
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction84p · 1 filing · 20 docs
Floor 10Under Construction10p · 1 filing · 20 docs
Floor 9Under Construction7p · 1 filing · 20 docs
Floor 8Under Construction7p · 1 filing · 20 docs
Floor 7Under Construction7p · 1 filing · 20 docs
Floor 6Under Construction7p · 1 filing · 20 docs
Floor 5Under Construction300p · 1 filing · 20 docs
Floor 4Under Construction300p · 1 filing · 20 docs
Floor 3Under Construction309p · 1 filing · 20 docs
Floor 2Under Construction322p · 1 filing · 20 docs
Floor 1Under Construction379p · 1 filing · 20 docs
CellarUnder Construction360p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLASTON DEVELOPMENT3709/17/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC606/10/2026
TOHFAZ UDDIN PE PC305/19/2026
GGA STUDIOS, DPC105/06/2026
HILL WEST ARCHITECTS303/31/2026
VHB302/25/2026
MCNAMARA SALVIA OF NEW YORK, PC204/24/2024
LANGAN ENGINEERING104/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2403/21/2026
SPRING SCAFFOLDING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.E. LEVINE BUILDER INCGeneral Contractor1207/29/2026
BUNLIN LLCGeneral Contractor209/17/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
FORWARD MECHANICAL CORPPlumbing206/28/2026
G.N.T. MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842803/31/2026
LANGAN ENG, ENV, SURVEYIN1265204/24/2024
MCNAMARA/SALVIA OF NEW YO4970204/24/2024
Building Lifecycle
All (156)Filed (18)Permit Issued (19)Violation (2)Inspection (8)Objection (79)Special Inspection (30)
09/16/2026
Permit issued — Supported Scaffold
B01410451-I1-SF
09/03/2026
Objection resolved — Addressed
08/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/27/2026
Permit issued — Protection and Mechanical Methods
B01440856-I1-PMM
07/28/2026
Permit issued — Structural
B00847849-S4-ST
07/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/22/2026
Special inspection requirement — Maintenance information
07/20/2026
Permit issued — Foundation
B00847849-S3-FO
07/10/2026
Permit issued — Support of Excavation
B00847849-S5-SE
07/09/2026
Permit issued — General Construction
B00847849-I1-GC
07/08/2026
Permit issued — General Construction
B00847849-I1-GC
06/22/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/16/2026
Permit issued — Protection and Mechanical Methods
B01323664-S1-PMM
06/16/2026
Permit issued — Plumbing
B00847849-Z1-PL
06/11/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
06/10/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00847849-I1
B00847849-P3
06/03/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
06/02/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00847849-I1
B00847849-Z1
05/27/2026
Permit issued — General Construction
B01362077-I1-GC
05/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT THE BUILDING ENTRANCE. IN CONJUNCTION WITH NEW BUILDINGS B00847849
B01323664-S1
05/18/2026
Permit issued — General Construction
B01398318-I1-GC
05/06/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO ADDRESS VIOLATION #'s: 039553462H AND 039553467R. SCOPE OF WORK INCLUDES REMOVAL OF REMNANTS FROM PRIOR DEMOLITION ACTIVITIES 20 YEARS AGO AT VARIOUS LOCATIONS AS INDICATED ON PLANS.
B01398318-I1
05/06/2026
Special inspection requirement — Final
LESLEY SCHMERZLER
04/27/2026
Special inspection requirement — Air barrier continuity plan testing
CONNIE PISANI
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
04/27/2026
Special inspection requirement — Air barrier — testing
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
04/27/2026
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
04/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
CONNIE PISANI
04/27/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
CONNIE PISANI
04/27/2026
Special inspection requirement — Vestibules
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
04/27/2026
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
04/27/2026
Special inspection requirement — Fenestration areas
CONNIE PISANI
04/27/2026
Special inspection requirement — Luminous Exit Path Markings
CONNIE PISANI
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
04/27/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
CONNIE PISANI
04/27/2026
Special inspection requirement — Protection of exposed foundation insulation
CONNIE PISANI
04/27/2026
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
04/27/2026
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
04/24/2026
Violation issued (ECB, closed)
Construction
04/24/2026
Violation issued (ECB, closed)
Construction
04/15/2026
Objection resolved — Addressed
04/13/2026
Objection raised — Other
03/31/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00847849-I1
B00847849-P2
03/19/2026
Permit issued — General Construction
B01362077-I1-GC
03/18/2026
Permit issued — Standpipe
B00847849-S7-EW-SD
03/06/2026
Permit issued — Plumbing
B01362077-S1-PL
03/02/2026
Permit issued — Foundation
B00847849-S3-FO
02/26/2026
Permit issued — Support of Excavation
B00847849-S5-SE
02/25/2026
Filed — Alteration
SHP1 - FILING FOR CIVIL SITE WORK IN CONJUCTION WITH NEW BUILDING B00847849-I1
B01362077-I1
02/25/2026
Filed — Alteration
SHP1 - FILING FOR CIVIL SITE WORK IN CONJUCTION WITH NEW BUILDING B00847849-I1
B01362077-S1
02/18/2026
Permit issued — Support of Excavation
B00847849-S5-SE
02/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT THE BUILDING ENTRANCE. IN CONJUNCTION WITH NEW BUILDINGS B00847849
B01323664-P1
02/12/2026
Permit issued — Foundation
B00847849-S3-FO
02/04/2026
Filed — New Building
FILING FOR TEMP STANDPIPE IN CONJUNCTION WITH NEW BUILDING# B00847849-I1
B00847849-S7
02/04/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
12/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT THE BUILDING ENTRANCE. IN CONJUNCTION WITH NEW BUILDINGS B00847849
B01323664-I1
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedBUNLIN LLC09/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBUNLIN LLC08/27/2026
DOB NOWStructuralPermit IssuedJ.E. LEVINE BUILDER INC07/28/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC07/20/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC07/10/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC07/09/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC07/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC06/16/2026
DOB NOWPlumbingPermit IssuedFORWARD MECHANICAL CORP06/16/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/27/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC05/18/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. LEVINE BUILDER INC03/19/2026
DOB NOWStandpipePermit IssuedG.N.T. MECHANICAL LLC03/18/2026
DOB NOWPlumbingPermit IssuedFORWARD HEATING CORP03/06/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC03/02/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC02/26/2026
DOB NOWSupport of ExcavationPermit IssuedJ.E. LEVINE BUILDER INC02/18/2026
DOB NOWFoundationPermit IssuedJ.E. LEVINE BUILDER INC02/12/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC12/29/2025
1 project · most recent 06/10/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Permit IssuedJ.E. LEVINE BUILDER INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A36NKA7 36,000 BTU · Condensing Unit ×4
Heating
Mitsubishi Electric PUHY-EP72TNU-A1 80,000 BTU · Vrf Outdoor ×5
PUHY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×4
PUHY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×3
PUHY-EP96TNU-A1 108,000 BTU · Vrf Outdoor ×2
PURY-EP72TNU-A1 108,000 BTU · Vrf Outdoor ×2
PUHY-EP168TNU-A1 188,000 BTU · Vrf Outdoor ×1
PURY-EP96TNU-A1 108,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE-3XJINH-S35VV-ANT-L 1,665 CFM · Erv ×3
HE-1XJINH-S15EE-GNT-L 700 CFM · Erv ×1
Swegon RX-050 6,730 CFM · Erv ×2
RX-020 1,395 CFM · Erv ×1
1 project · most recent 06/10/2026
Sprinkler System
FiledStatusContractorScope
06/10/2026——Sprinkler System
2 projects · most recent 06/10/2026
Storm Gas Water/Sanitary
FiledStatusContractorScope
06/10/2026Permit IssuedFORWARD MECHANICAL CORPGas, Storm, Water/Sanitary
02/25/2026Permit IssuedFORWARD MECHANICAL CORPStorm
2 projects · most recent 09/04/2026
FiledStatusContractorScope
09/04/2026Permit IssuedRELIANT ELEC'L CONT'G INC—
11/24/2025Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 06/10/2026
Concrete Masonry
FiledStatusContractorScope
06/10/2026Permit IssuedJ.E. LEVINE BUILDER INCConcrete, Masonry
1 project · most recent 05/19/2026
Sidewalk Shed
FiledStatusContractorScope
05/19/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2026Pass-Final PL - UndergroundPassView ↗
06/22/2026Pass-Final PL - UndergroundPassView ↗
06/11/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
06/03/2026Fail-Final PL - UndergroundFailView ↗
05/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
07/22/2026Maintenance information—energy_progress
05/06/2026FinalLESLEY SCHMERZLERprogress
04/27/2026Air barrier - visual inspectionCONNIE PISANIenergy_progress
04/27/2026Air barrier continuity plan testingCONNIE PISANIenergy_progress
04/27/2026Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
04/27/2026Fenestration areasCONNIE PISANIenergy_progress
04/27/2026Insulation placement and R valuesCONNIE PISANIenergy_progress
04/27/2026Air barrier — testing CONNIE PISANIenergy_progress
04/27/2026Protection of exposed foundation insulationCONNIE PISANIenergy_progress
04/27/2026Luminous Exit Path MarkingsCONNIE PISANIspecial
04/27/2026Fenestration air leakageCONNIE PISANIenergy_progress
04/27/2026Mastic and Intumescent Fire-resistant CoatingsCONNIE PISANIspecial
04/27/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
04/27/2026Post-installed AnchorsCONNIE PISANIspecial
04/27/2026Sprayed fire-resistant materialsCONNIE PISANIspecial
04/27/2026Exterior Insulation and Finish Systems (EIFS)CONNIE PISANIspecial
04/27/2026Wall Panels, Curtain Walls, and VeneersCONNIE PISANIspecial
04/27/2026VestibulesCONNIE PISANIenergy_progress
04/27/2026Fire-Resistance Rated ConstructionCONNIE PISANIprogress
04/27/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
12/19/2025Lighting controls—energy_progress
12/19/2025Metering—energy_progress
12/19/2025Interior lighting power—energy_progress
12/19/2025Lighting in dwelling units—energy_progress
12/19/2025Exterior lighting power—energy_progress
Latest 25 of 68.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/18/2026B01362077-I1Request digital key ↗
08/18/2026B01362077-S1Request digital key ↗
08/17/2026B01398318-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/29/2025340917510Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/21/2025340917510Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00847849-P2Open ↗
08/13/2026B00847849-P1Open ↗
08/13/2026B00847849-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B00847849-P2Open ↗
08/14/2026B00847849-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/17/2026B01398318-I1Open ↗
08/16/2026B01323664-I1Open ↗
08/16/2026B01323664-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B01398318-I1Open ↗
08/28/2026B00847849-P1Open ↗
08/28/2026B00847849-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B00847849-P1Open ↗
08/24/2026B00847849-S5Open ↗
08/24/2026B00847849-S5Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/21/2025340917510Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/21/2025340917510Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026B00847849-P2Open ↗
08/13/2026B00847849-I1Open ↗
08/13/2026B00847849-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00847849-I1—
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/16/2026B00847849-P1Open ↗
08/15/2026B00847849-P2Open ↗
08/14/2026B00847849-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00847849-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/21/2025340917510Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/21/2025340917510Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/21/2025340917510Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/21/2025340917510Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00847849-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00847849-S3Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/16/2026B01323664-S1Open ↗
08/16/2026B00847849-P3Open ↗
08/16/2026B00847849-Z1Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/21/2025340917510Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial3
08/15/2026B00847849-P2Open ↗
08/13/2026B00847849-P1Open ↗
08/13/2026B00847849-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00847849-P2Open ↗
08/13/2026B00847849-P1Open ↗
08/13/2026B00847849-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00847849-S5Open ↗