← Back
BuildNYC
Two stories - detached, small or mid-size
50 THERESA PLACE
STATEN ISLAND · BIN 5015207
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R1-2Zoning
2,883 sfGross Floor Area
1Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticInterior renovation and 2nd floor extension11p · 1 filing · 20 docs
Floor 2Interior renovation and 2nd floor extension16p · 3 filings · 20 docs
Floor 1Interior renovation and 2nd floor extension19p · 3 filings · 20 docs
CellarInterior renovation and 2nd floor extension17p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sotir Associates804/09/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LT Pro ConstructionGeneral Contractor407/08/2026
Mohrail ConstructionGeneral Contractor207/08/2026
Richmond P & HPlumbing207/08/2026
Signoriello Plumbing & HeatingPlumbing103/21/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050204/09/2024
Sotir Associates7473105/25/2021
Building Lifecycle
04/12/2024
Signed off — Alteration
INTERIOR RENOVATIONS ON ALL FLOORS & HORTIZONTAL EXTENSION ON 2ND FL, EXTEND ROOF & NEW STUCCO FINISH ON FRONT FACADE.
S00463710-I1
04/10/2024
Special inspection requirement — Masonry
PAUL MARINO
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
04/10/2024
Special inspection requirement — Subgrade Inspections
PAUL MARINO
04/10/2024
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp03/23/2023
DOB NOWPlumbingSigned-offRichmond P & H03/06/2023
DOB NOWGeneral ConstructionSigned-offLT Pro Construction02/02/2023
DOB NOWGeneral ConstructionSigned-offLT Pro Construction02/02/2023
DOB NOWGeneral ConstructionSigned-offMohrail Construction01/26/2023
DOB NOWPlumbingSigned-offRichmond P & H03/09/2022
DOB NOWGeneral ConstructionSigned-offMohrail Construction07/28/2021
BISPLISSUEDSignoriello Plumbing & Heating03/06/2003
BIS—ISSUEDLeonardo Contracting02/13/2003
BISCCISSUEDN/A05/11/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/10/2024MasonryPAUL MARINOspecial
04/10/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/10/2024Subgrade InspectionsPAUL MARINOspecial
04/10/2024Concrete - Cast-In-PlacePAUL MARINOspecial
04/10/2024Excavations - Sheeting, Shoring, and BracingPAUL MARINOspecial
04/10/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/10/2024Subsurface Investigations (Borings/Test Pits)PAUL MARINOspecial
04/10/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/10/2024FinalHany Demetryprogress
04/10/2024Insulation placement and R valuesPAUL MARINOenergy_progress
04/10/2024Fenestration areasPAUL MARINOenergy_progress
04/10/2024Air barrier - visual inspectionPAUL MARINOenergy_progress
04/10/2024Lighting in dwelling unitsPAUL MARINOenergy_progress
04/10/2024Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
04/09/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/09/2024Concrete - Cast-In-PlacePAUL MARINOspecial
04/09/2024Excavations - Sheeting, Shoring, and BracingPAUL MARINOspecial
04/09/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/09/2024MasonryPAUL MARINOspecial
04/09/2024Subgrade InspectionsPAUL MARINOspecial
04/09/2024Subsurface Investigations (Borings/Test Pits)PAUL MARINOspecial
04/09/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/09/2024FinalHany Demetryprogress
04/09/2024Air barrier - visual inspectionPAUL MARINOenergy_progress
04/09/2024Insulation placement and R valuesPAUL MARINOenergy_progress
Latest 25 of 37.
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account