50 WARDS POINT AVENUE
STATEN ISLAND · Tottenville-Charleston · BIN 5088552
💬 Discuss this project
1983Year Built
1.75Stories
A1Building Class
R1-2Zoning
2,002 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 18,759 sf lot · 0.11 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Roof1p · 1 filing · 9 docs
Floor 21 filing · 1 doc
Floor 11 filing · 1 doc
Cellar1p · 1 filing · 1 doc
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/11/2025
CHARLES A. MAGRINO, AIA111/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/11/2025
Building Lifecycle
All (15)Filed (2)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (5)
01/27/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01315127-I1
11/24/2025
Permit issued — Solar
S01315127-I1-SL
11/11/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01315127-I1
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/11/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/06/2025
Special inspection requirement — Final
Walid Abdulla
02/15/2024
Signed off — Alteration
S00948475-I1
01/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Permit issued — Plumbing
S00948475-I1-PL
11/02/2023
Filed — Alteration
S00948475-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/24/2025
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO12/06/2023
BISOTISSUEDTARANTO CONSTRUCTION CO; INC.01/24/1995
1 project · most recent 11/11/2025
FiledStatusContractorScope
11/11/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/11/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/11/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
11/06/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/06/2025Energy Code Compliance InspectionsWalid Abdullaprogress
11/06/2025FinalWalid Abdullaprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01315127-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
02/23/2024500142605Open ↗
02/16/2024500142605Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01315127-I1Open ↗
08/26/2026S01315127-I1Open ↗
08/26/2026S01315127-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01315127-I1Open ↗
08/13/2026S00948475-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01315127-I1Open ↗
08/26/2026S01315127-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01315127-I1Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
02/27/2024500142605Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/12/2024500142605Open ↗
03/12/2024500142605Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01315127-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/11/2024500142605Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
03/12/2024500142605Open ↗
02/23/2024500142605Open ↗
▸Other Documents3
▸BIS* FIRE STOPS 27-3451
02/27/2024500142605Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
02/27/2024500142605Open ↗
▸BISFIREPLACE INSTALLATION1
03/11/2024500142605Open ↗