← Back
BuildNYC
Converted dwellings or rooming house
50 WEST 82ND STREET
MANHATTAN · BIN 1031146
💬 Discuss this project
1887Year Built
4Stories
C5Building Class
R8BZoning
4,532 sfGross Floor Area
10Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 5 likely answered ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: 50 W. 82 LLC · 1,635 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
StructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorHeavy duty sidewalk shed installation8p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50 W 82 LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf110/09/2024
Bangash Associates109/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pioneer Construction GroupScaffold407/08/2026
Building Lifecycle
All (21)Filed (2)Permit Issued (2)Signed Off (2)Violation (15)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2025
Violation issued (HPD, closed)
C
09/22/2025
Violation issued (HPD, closed)
C
03/09/2025
Signed off — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01104986-S1
03/09/2025
Signed off — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01104986-I1
10/15/2024
Permit issued — Supported Scaffold
M01104986-S1-SF
10/09/2024
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01104986-S1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2024
Permit issued — Sidewalk Shed
M01104986-I1-SH
09/04/2024
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01104986-I1
06/07/2024
Violation issued (ECB, open)
Boilers
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (HPD, closed)
A
11/06/2017
Violation issued (HPD, closed)
I
01/06/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPioneer Construction Group10/15/2024
DOB NOWSidewalk ShedSigned-offPioneer Construction Group09/05/2024
2 projects · most recent 09/18/2024
General Wiring
FiledStatusContractorScope
09/18/2024Permit IssuedRichard Neu—
08/03/2021Permit IssuedWCK ElectricGeneral Wiring
Nothing on file for this building.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026M01104986-S1Request digital key ↗
08/26/2026M01104986-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01104986-I1Open ↗
08/13/2026M01104986-S1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist2
08/13/2026M01104986-S1Open ↗
08/13/2026M01104986-I1Open ↗