← Back
BuildNYC
Elevator cooperative
Brighton House
500 BRIGHTWATER COURT · Brighton Beach · BIN 3245104
💬 Discuss this project
1967Year Built
18Stories
D4Building Class
R7-1Zoning
185,000 sfGross Floor Area
197Units
LL97 CoveredRent Stabilized42 Active Violations 38 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: Brighton House · 41,800 sf lot · 4.43 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMetro Management Development INC.1 filing
RoofMetro Management Development, Inc.1p · 2 filings · 9 docs
BulkheadMetro Management Development, Inc.Under Construction2p · 2 filings · 14 docs
Site & exteriorMetro Management Development, Inc.Under Construction2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brighton House3503/22/2026
Highlawn Terrace907/08/2026
500 Brightwater Court503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Queens306/16/2025
Lawless & Mangione108/12/2024
Structural Consulting Services107/23/2024
WQB Architecture110/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SBLM103/21/2026
Xinos Construction203/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold609/07/2026
Xinos ConstructionGeneral Contractor306/27/2026
DDS Mechanical PBG HeatingPlumbing203/21/2026
Powers Bridging ScaffoldingGeneral Contractor203/21/2026
Fast Flo Plumbing & HeatingPlumbing103/21/2026
Sanford Stein ConsultantsPlumbing103/21/2026
Arista Plumbing & HeatingFire Protection103/21/2026
Odyssia Global Commercialspecialty_contractor107/08/2026
All-Con ContractingGeneral Contractor103/21/2026
NY NJ Restorationspecialty_contractor107/08/2026
Cema ConstructionGeneral Contractor109/19/2006
Colgate ScaffoldingGeneral Contractor110/25/2004
Constrade USAGeneral Contractor110/06/2004
RC3 ElectricGeneral Contractor106/03/2015
Rockledge ScaffoldGeneral Contractor107/28/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898108/26/2024
NY Restoration Technology6187108/12/2024
Structural Consulting Services1919107/23/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/03/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B01094387-I1-SH
07/28/2026
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
B01094651-I1-SC
06/23/2026
Permit renewed — General Construction
Renewed without changes
B01073385-I1-GC
06/08/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B01094387-I1-SH
238 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/03/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction06/23/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/08/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction03/05/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction08/08/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction07/28/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction06/13/2025
DOB NOWAntennaPermit IssuedOdyssia Global Commercial08/30/2024
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction08/26/2024
DOB NOWSidewalk ShedPermit IssuedXinos Construction08/12/2024
DOB NOWGeneral ConstructionPermit IssuedNY NJ Restoration01/14/2022
BISSPISSUEDDDS Mechanical FPS04/09/2020
BISPLISSUEDD.D.S. Mechanical PBG & Heating04/09/2020
BIS—ISSUEDAll Con Contracting05/20/2019
BISEQISSUEDAll Con Contracting05/10/2019
BISEQISSUEDAll Con Contracting05/10/2019
BISSPISSUEDDDS Mechanical FPS04/30/2019
BISPLISSUEDD.D.S. Mechanical PBG & Heating04/30/2019
BISBLISSUEDD.D.S. Mechanical PBG & Heating04/30/2019
BISBLISSUEDD.D.S. Mechanical PBG & Heating01/15/2019
BIS—ISSUEDAll Con Contracting09/13/2018
BIS—ISSUEDAll Con Contracting06/04/2018
BISMHISSUEDAll Con Contracting06/01/2018
BISEQISSUEDAll Con Contracting05/18/2018
BISEQISSUEDAll Con Contracting05/18/2018
BISBLISSUEDD.D.S. Mechanical PBG & Heating05/14/2018
BISPLISSUEDD.D.S. Mechanical PBG & Heating05/14/2018
BISMHISSUEDAll Con Contracting05/09/2018
BIS—ISSUEDAll Con Contracting03/29/2018
BISEQISSUEDAll Con Contracting05/10/2017
BISEQISSUEDAll Con Contracting05/10/2017
BISOTISSUEDXinos Construction08/24/2015
BISOTISSUEDRC3 Electric06/03/2015
BISEQISSUEDXinos Construction05/08/2015
BISEQISSUEDXinos Construction04/14/2014
BISEQISSUEDXinos Construction06/12/2013
BISEQISSUEDPowers Bridging & Scaffolding04/16/2007
BISEQISSUEDPowers Bridging & Scaffolding01/11/2007
BISOTISSUEDCema Construction09/19/2006
BISPLISSUEDProto P & H Services01/27/2006
+ 6 more permits on file
7 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026CompleteJam Electrical—
06/19/2025Permit IssuedTower Electric—
03/06/2025Permit IssuedElectl Contg SolutionsGeneral Wiring
10/01/2024Permit IssuedTower Electric—
06/23/2020CompleteDemand ElectricGeneral Wiring
05/17/2019CompleteDemand Electric—
05/02/2018CompleteDemand ElectricGeneral Wiring
1 project · most recent 06/16/2025
Sidewalk Shed
FiledStatusContractorScope
06/16/2025Permit IssuedXinos ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/12/2024Post-installed AnchorsANDREAS CHRISTOFOROUspecial
08/12/2024Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
07/30/2024MasonryHamidreza Sagharispecial
07/30/2024Post-installed AnchorsHamidreza Sagharispecial
07/30/2024Energy Code Compliance InspectionsWilliam Struthprogress
07/30/2024Air barrier - visual inspectionWilliam Struthenergy_progress
07/30/2024Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
07/30/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Hamidreza Sagharispecial
07/24/2024Tenant Protection Plan ComplianceHamidreza Sagharispecial
338 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account