Office with commercial, 1-6 stories
500 DEKALB AVENUE
BROOKLYN · BIN 3055395
💬 Discuss this project
1969Year Built
6Stories
O5Building Class
R7AZoning
56,112 sfGross Floor Area
8Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: BSD SUITES LLC · 12,240 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Roof4p · 3 filings · 20 docs
Floor 63p · 2 filings · 16 docs
Floor 52p · 1 filing · 12 docs
Floor 42p · 1 filing · 12 docs
Floor 32p · 1 filing · 12 docs
Floor 23p · 1 filing · 12 docs
Floor 121p · 4 filings · 20 docs
Cellar18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROYAL PROPERTY MANAGEMENT2907/08/2026
WIFI CONSTRUCTION LLC503/22/2026
BSD SUITES LLC103/22/2026
JL WORK INC103/22/2026
JONAS EQUITIES203/22/2026
ARBERN REALTY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2018$23.2M—— → —$414/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEY ASSOCIATES307/13/2026
BILD ARCHITECTURE105/26/2026
BEAM ARCHITECTS D.P.C.811/26/2025
BGM ENGINEERING110/31/2024
CHOSEN MEP, CORP.312/28/2021
AZSK ARCHITECTS PC307/21/2021
ASIF JAMIL, RA105/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1503/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor607/08/2026
TARGET PIPING NY LLCFire Protection607/08/2026
JL WORKS INCGeneral Contractor507/08/2026
WIFI CONSTRUCTION LLCGeneral Contractor303/21/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
CAPONE ELECL CONTRS CORPElectrical103/22/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
CURRENT MECHS ELEC CONTSElectrical103/22/2026
JP & SON ELECTRIC CORPElectrical103/22/2026
AMOK INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941411/26/2025
Building Lifecycle
All (200)Filed (20)Permit Issued (17)Signed Off (10)Violation (56)Inspection (13)Objection (54)Special Inspection (30)
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Energy
07/28/2026
Objection raised — Energy
07/21/2026
Objection resolved — Addressed
07/20/2026
Objection resolved — Addressed
07/15/2026
Objection raised — Cost
07/15/2026
Objection raised — Cost
07/13/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION JOB #B01407561-I1
B01407561-S3
07/13/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION JOB #B01407561-I1
B01407561-S1
07/13/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION JOB #B01407561-I1
B01407561-S2
06/30/2026
Objection raised — Admin
06/30/2026
Objection raised — Zoning
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Addressed
06/29/2026
Special inspection requirement — Maintenance information
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/17/2026
Special inspection requirement — Maintenance information
06/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/17/2026
Special inspection requirement — Shutoff dampers
06/16/2026
Special inspection requirement — Sprinkler Systems
06/16/2026
Special inspection requirement — Final
06/16/2026
Special inspection requirement — Mechanical Systems
05/27/2026
Objection raised — Scope
05/27/2026
Objection raised — Cost
05/27/2026
Objection raised — Zoning
05/27/2026
Objection raised — Admin
05/27/2026
Objection raised — Fire_Protection
05/26/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION JOB #B01407561-I1
B01407561-I1
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/26/2026
Special inspection requirement — Lighting controls
05/26/2026
Special inspection requirement — Interior lighting power
04/28/2026
Signed off — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-I1
12/02/2025
Special inspection requirement — Interior lighting power
Paul Raymond
12/02/2025
Special inspection requirement — Lighting controls
Paul Raymond
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/26/2025
Filed — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-P7
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
10/27/2025
Special inspection requirement — Interior lighting power
Paul Raymond
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
10/27/2025
Special inspection requirement — Lighting controls
Paul Raymond
07/03/2025
Violation issued (FDNY_ORDER, closed)
06/20/2025
Signed off — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-S4
06/19/2025
Signed off — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-S3
06/19/2025
Signed off — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-S2
05/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/30/2025
Signed off — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-S1
04/28/2025
Filed — Alteration CO
Proposed interior renovation and change to Childcare of cellar / partial first floor of an existing six (6) story + cellar commercial building.
B01102419-P5
04/09/2025
Special inspection requirement — Lighting controls
Paul Raymond
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/09/2025
DOB NOWSprinklersSigned-offAMOK INC01/08/2025
DOB NOWMechanical SystemsSigned-offJSB WORKS INC12/26/2024
DOB NOWStructuralSigned-offJSB WORKS INC12/10/2024
DOB NOWGeneral ConstructionPermit IssuedJSB WORKS INC10/09/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC10/28/2021
DOB NOWMechanical SystemsSigned-offJSB WORKS INC10/28/2021
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC10/28/2021
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC05/13/2021
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC10/29/2020
DOB NOWStandpipeSigned-offTARGET PIPING NY LLC10/28/2020
DOB NOWConstruction FenceSigned-offJL WORKS INC06/05/2020
DOB NOWStandpipeSigned-offTARGET PIPING NY LLC11/21/2019
DOB NOWStandpipeSigned-offTARGET PIPING NY LLC11/21/2019
DOB NOWConstruction FenceSigned-offJL WORKS INC06/04/2019
DOB NOWSidewalk ShedSigned-offWIFI CONSTRUCTION LLC05/13/2019
DOB NOWConstruction FenceSigned-offJL WORKS INC03/08/2019
BIS—ISSUEDJSB WORKS INC11/30/2021
BISPLISSUEDB&B MECH PLBG & HTG LLC10/27/2021
BISOTISSUEDJSB WORKS INC06/24/2021
BISOTISSUEDJSB WORKS INC06/24/2021
BISOTISSUEDJSB WORKS INC04/22/2021
BISOTISSUEDJSB WORKS INC04/22/2021
BISPLISSUEDB&B MECH PLBG & HTG LLC10/28/2020
BISOTISSUEDYELLOW HAT CONSTRUCTION I10/20/2020
BISOTISSUEDJL WORKS INC07/08/2020
BISOTISSUEDJL WORKS INC07/02/2019
BISPLISSUEDWNW & SONS PLBG & HTG INC06/05/2019
BISOTISSUEDJL WORKS INC02/26/2019
BISOTISSUEDJL WORKS INC12/26/2018
BISOTISSUEDBENI CONSTRUCTION CO INC03/09/2017
BISMHISSUEDBENI CONSTRUCTION CO INC03/08/2017
BISOTISSUEDBENI CONSTRUCTION CO INC03/08/2017
BISMHISSUEDBENI CONSTRUCTION CO INC03/08/2017
BISOTISSUEDBENI CONSTRUCTION CO INC03/08/2017
BISOTISSUEDNYC HUMAN RESOURCES ADMIN10/29/2015
BISOTISSUEDSBA COMMUNICATIONS GROUP11/29/2007
BISEQISSUEDCOLGATE SCAFFOLDING09/22/2004
BISOTISSUEDMITCHELL CONSTRUCTION CORP10/05/1998
BISOTISSUEDMITCHELL CONSTRUCTION COM. INC09/21/1998
1 project · most recent 07/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×1
Ventilation
Mitsubishi Electric LGH-F470RVX2-E 1,200 CFM · Erv ×1
2 projects · most recent 07/13/2026
Sprinkler System
FiledStatusContractorScope
07/13/2026——Sprinkler System
11/26/2025Signed-offAMOK INCSprinkler System
2 projects · most recent 07/13/2026
Water/Sanitary
FiledStatusContractorScope
07/13/2026——Water/Sanitary
11/26/2025Signed-offDYNAMIC PLBG & SPRKLR CORWater/Sanitary
7 projects · most recent 04/15/2025
General Wiring
FiledStatusContractorScope
04/15/2025CompleteJP & SON ELECTRIC CORPGeneral Wiring
06/09/2022CompleteFRIED ELECTRIC CO.General Wiring
06/07/2022CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
03/10/2022CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
05/06/2020CompleteHIGH STANDARD ELECTRIC8 meters, 6 new_meters
05/24/2019CompleteHIGH STANDARD ELECTRICGeneral Wiring
05/08/2019CompleteSEGA ELECTRIC LLC—
1 project · most recent 11/26/2025
Steel
FiledStatusContractorScope
11/26/2025Signed-offDYNAMIC PLBG & SPRKLR CORSteel
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
06/29/2026Maintenance information—energy_progress
06/17/2026Fire-Resistant Penetrations and Joints—special
06/17/2026Shutoff dampers—energy_progress
06/17/2026Maintenance information—energy_progress
06/17/2026HVAC-R and service water heating system controls—energy_progress
06/17/2026HVAC-R and service water heating equipment—energy_progress
06/17/2026Duct leakage testing, insulation and design—energy_progress
06/17/2026HVAC-R and service water piping design and insulation—energy_progress
06/16/2026Sprinkler Systems—special
06/16/2026Final—progress
06/16/2026Mechanical Systems—special
05/26/2026Energy Code Compliance Inspections—progress
05/26/2026Interior lighting power—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/26/2026Lighting controls—energy_progress
12/02/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/02/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
12/02/2025Energy Code Compliance InspectionsPaul Raymondprogress
12/02/2025Interior lighting powerPaul Raymondenergy_progress
12/02/2025Lighting controlsPaul Raymondenergy_progress
10/27/2025Interior lighting powerPaul Raymondenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
10/27/2025Energy Code Compliance InspectionsPaul Raymondprogress
10/27/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
10/27/2025Lighting controlsPaul Raymondenergy_progress
Latest 25 of 64.
▾Documents — 331 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch13
08/23/2026B01102419-P4Request digital key ↗
08/23/2026B01102419-P5Request digital key ↗
08/23/2026B01102419-P7Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
08/31/2026B00230861-I1Request digital key ↗
08/15/2026B00230861-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00293586-I1Request digital key ↗
08/15/2026B00293586-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/31/2026B00230861-I1Request digital key ↗
08/15/2026B00230861-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00293591-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00130348-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00163519-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION29
01/26/2023322001016Open ↗
02/15/2022322001016Open ↗
02/07/2022322001016Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION16
11/30/2021322001016Open ↗
11/26/2021322001016Open ↗
04/28/2021321903464Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
11/18/2019321903464Open ↗
04/03/2019321903464Open ↗
02/22/2019321903464Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/03/2021322001016Open ↗
12/02/2021322001016Open ↗
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)1
02/01/2023322001016Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/15/2026B01407561-I1Open ↗
08/13/2026B01102419-I1Open ↗
08/13/2026B01102419-P5Open ↗
Showing 3 of 4 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/13/2021322001016Open ↗
▸BISVERIFY TAX LOT1
05/17/2022322001016Open ↗
▸Seals & Professional Certifications103
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026B01102419-I1Open ↗
09/01/2026B01102419-I1Open ↗
09/01/2026B01102419-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
11/26/2021322001016Open ↗
02/05/2020322001016Open ↗
02/25/2019321909896Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/01/2026B01102419-I1Open ↗
08/28/2026B01102419-P3Open ↗
08/28/2026B01102419-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/02/2026B00130348-I1Open ↗
08/23/2026B01102419-S4Open ↗
08/23/2026B01102419-P3Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/03/2019321903464Open ↗
01/25/2017321513536Open ↗
01/24/2017321513545Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/25/2017321513536Open ↗
01/24/2017321513545Open ↗
01/24/2017321513527Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
01/03/2019321903464Open ↗
01/24/2017321513518Open ↗
▸Trade Schedules & Equipment18
▸BISEQUIPMENT USE APPLICATION/PERMIT9
05/03/2017321513527Open ↗
05/02/2017321513518Open ↗
05/02/2017321513518Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/27/2019321903464Open ↗
11/22/2019321903464Open ↗
11/15/2019321903464Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
07/19/2021321903464Open ↗
07/13/2021321903464Open ↗
▸BISEQUIPMENT USE PERMITS1
05/05/2017321513527Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
11/06/2019321903464Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/23/2026B01102419-P5Open ↗
08/23/2026B01102419-P7Open ↗
08/15/2026B01102419-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
01/30/2020322001016Open ↗
▸BISSTREET TREE SIGNOFF1
12/13/2021322001016Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/16/2026B01407561-S3Open ↗
08/15/2026B01407561-S2Open ↗
08/15/2026B01407561-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/05/2020322001016Open ↗
01/02/2019321903464Open ↗
01/25/2017321513536Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
11/26/2021322001016Open ↗
02/05/2020322001016Open ↗
01/03/2019321903464Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
02/01/2022321903464Open ↗
01/25/2022321903464Open ↗
01/25/2022321903464Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/26/2022322001016Open ↗
01/25/2022321903464Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00293591-I1Open ↗
08/13/2026B01102419-S1Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/27/2022321903464Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/12/2022322001016Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
02/21/2022321909896Open ↗
02/21/2022321909896Open ↗
02/16/2022321909896Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE10
02/15/2022322001016Open ↗
02/07/2022322001016Open ↗
10/14/2021322001016Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/10/2022321903464Open ↗
02/24/2022321909896Open ↗
05/03/2017321513527Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/28/2021321903464Open ↗
04/28/2021321909896Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT18
02/23/2022321909896Open ↗
02/01/2022321903464Open ↗
01/30/2020322001016Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/31/2023322001016Open ↗
02/16/2022321909896Open ↗
01/13/2022321903464Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
11/26/2021322001016Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/03/2021322001016Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET9
10/24/2019322001016Open ↗
02/22/2019321909896Open ↗
01/03/2019321903464Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
02/07/2022322001016Open ↗
10/15/2021322001016Open ↗
08/19/2021322001016Open ↗
Showing 3 of 8 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/23/2026B01102419-P5Open ↗
08/23/2026B01102419-P7Open ↗
08/15/2026B01102419-I1Open ↗
Showing 3 of 4 on file for this type