← Back
BuildNYC
Predominantly retail with other uses
500 DRIGGS AVENUE
BROOKLYN · BIN 3061702
💬 Discuss this project
1900Year Built
6Stories
K4Building Class
M1-2/R6AZoning
113,722 sfGross Floor Area
69Units
LL97 CoveredRent Stabilized2 Active Violations 2 likely answered ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: Marjay Realty · 35,000 sf lot · 3.25 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1The Craic12p · 3 filings · 20 docs
Site & exteriorBuffalo Exchange1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Marjay Realty5103/22/2026
Driggs Realty903/21/2026
Murraywalsh607/08/2026
Greenpoint Industrial Center603/22/2026
Chalk GYMS603/21/2026
Kove504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PL Engineering205/27/2025
Mje Professional Services110/26/2024
AAG106/14/2024
Leon Skvirsky PE108/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WJ ContractingGeneral Contractor307/08/2026
Oasis PlomoGeneral Contractor303/21/2026
BT's Plumbing and HeatingPlumbing107/08/2026
P&H Electric D/B/A Mage ElectricElectrical103/21/2026
JascoScaffold107/08/2026
Paul SignsSign hanger107/08/2026
Building Lifecycle
All (79)Filed (5)Permit Issued (6)Signed Off (4)Violation (60)Inspection (2)Special Inspection (2)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
11/18/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01132031-I1
08/19/2025
Signed off — Alteration
Removal of non-load bearing interior partitions, existing plumbing fixtures, and finishes. Installation of new non-load bearing interior partitions, plumbing fixtures and finishes.
B01067129-I1
08/13/2025
Signed off — Alteration
PROVIDE WORK TO REDO 1 BATHROOM AND PROVIDE FLOOR DRAINS, DRINKING FOUNTAINS, COLD WATER, HOT WATER AND VENT AS REQUIRED. NO CHANGE IN USE OR EGRESS.
B01231051-I1
07/08/2025
Permit issued — General Construction
B01231051-I1-GC
07/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — Plumbing
B01231051-S1-PL
06/09/2025
Violation issued (HPD, closed)
A
05/27/2025
Filed — Alteration
PROVIDE WORK TO REDO 1 BATHROOM AND PROVIDE FLOOR DRAINS, DRINKING FOUNTAINS, COLD WATER, HOT WATER AND VENT AS REQUIRED. NO CHANGE IN USE OR EGRESS.
B01231051-I1
05/27/2025
Filed — Alteration
PROVIDE WORK TO REDO 1 BATHROOM AND PROVIDE FLOOR DRAINS, DRINKING FOUNTAINS, COLD WATER, HOT WATER AND VENT AS REQUIRED. NO CHANGE IN USE OR EGRESS.
B01231051-S1
05/23/2025
Special inspection requirement — Final
PABLO LEON
10/28/2024
Permit issued — Sidewalk Shed
B01132031-I1-SH
10/26/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01132031-I1
08/14/2024
Permit issued — General Construction
B01067129-I1-GC
06/24/2024
Permit issued — General Construction
B01067129-I1-GC
06/14/2024
Filed — Alteration
Removal of non-load bearing interior partitions, existing plumbing fixtures, and finishes. Installation of new non-load bearing interior partitions, plumbing fixtures and finishes.
B01067129-I1
06/14/2024
Special inspection requirement — Final
Allen Gillers
11/13/2023
Violation issued (FDNY_NOV, closed)
03/22/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
04/11/2022
Violation issued (ECB, closed)
Elevators
02/24/2022
Violation issued (HPD, closed)
A
07/09/2021
Signed off — Alteration
B00068581-I1
04/08/2021
Violation issued (HPD, closed)
A
02/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2019
Violation issued (ECB, closed)
Elevators
01/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2018
Permit issued — Sign
B00068581-I1-SG
08/23/2018
Filed — Alteration
B00068581-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2018
Violation issued (ECB, closed)
Elevators
02/08/2018
Violation issued (ECB, closed)
Construction
02/08/2018
Violation issued (ECB, closed)
Construction
02/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2016
Violation issued (ECB, closed)
Construction
11/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOasis Plomo07/08/2025
DOB NOWPlumbingSigned-offBT's Plumbing and Heating06/25/2025
DOB NOWSidewalk ShedSigned-offJasco10/28/2024
DOB NOWGeneral ConstructionSigned-offWJ Contracting08/14/2024
DOB NOWGeneral ConstructionSigned-offWJ Contracting06/24/2024
DOB NOWSignSigned-offPaul Signs10/05/2018
BISMHISSUEDInterboro Property Management05/31/2016
BISPLISSUEDJohn's Plumbing & Heating04/26/2016
BISSPISSUEDJohn's Plumbing & Heating04/26/2016
BISOTISSUEDShaira Construction04/25/2016
BISMHISSUEDEastern Air04/25/2016
BISMHISSUEDInterboro Property Management01/13/2014
BISOTISSUEDInterboro Property Management04/19/2013
BISOTISSUEDBayport Construction03/13/2013
BISFPISSUEDMega Fire Protection10/25/2011
BISOTISSUEDDavid Thomas Works07/21/2011
BISPLISSUEDCK Plumbing & Mechanical09/16/2010
BIS—ISSUEDTenta NY09/14/2010
BISOTISSUEDSteinway Awning II11/21/2008
BISOTISSUEDSteinway Awning II11/20/2008
BISOTISSUEDDriggs Realty08/28/2007
BIS—ISSUEDPSG Construction Co06/16/2005
BIS—ISSUEDPSG Construction Co05/26/2005
BISFPISSUEDMega Fire Protection12/14/2004
BISMHISSUEDPSG Construction Co11/29/2004
BISSPISSUEDFirequest08/03/2004
BISPLISSUEDStarlite Plumbing & Heating04/19/2004
BIS—ISSUEDPSG Construction Co04/19/2004
BISEQISSUEDPSG Construction Co04/05/2004
BIS—ISSUEDPSG Construction Co04/05/2004
BISSPISSUEDFirequest03/03/2004
BISEQISSUEDPSG Construction Co11/20/2003
BISPLISSUEDStarlite Plumbing & Heating08/06/2003
BIS—ISSUEDPSG Construction Co05/05/2003
BISEQISSUEDPSG Construction Co04/16/2003
BISEQISSUEDPSG Construction Co04/11/2003
BISPLISSUEDUnflat Perotto Associates01/06/1997
BISMHISSUEDAdmiral Cooling12/18/1996
BISPLISSUEDUnflat Perotto Ass12/12/1996
BISOTISSUEDUnflat Perotto Ass12/12/1996
1 project · most recent 05/27/2025
Water/Sanitary
FiledStatusContractorScope
05/27/2025Signed-offBT's Plumbing and HeatingWater/Sanitary
5 projects · most recent 07/25/2025
General Wiring
FiledStatusContractorScope
07/25/2025CompleteJoseph Weinstein Electric—
04/03/2025CompleteTimothy Coleman LicensedGeneral Wiring
10/30/2024Permit IssuedRichard Neu—
08/07/2024CompleteElectrical SolutionsGeneral Wiring
10/12/2018Permit IssuedRainbow Electric Co—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/23/2025FinalPABLO LEONprogress
06/14/2024FinalAllen Gillersprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The CraicRestaurant / Food ServiceFloor 1
Project B01067129 Alteration · LOC Issued · 06/14/2024
Buffalo ExchangeRetailFloor 1
Project B00068581 Alteration · LOC Issued · 08/23/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 226 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B00068581-I1Request digital key ↗
08/24/2026B01067129-I1Request digital key ↗
08/23/2026B01132031-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION24
02/24/2023320150643Open ↗
02/03/2023320150643Open ↗
08/16/2022320150643Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION16
05/31/2016340373198Open ↗
04/28/2016321282973Open ↗
04/28/2016321282973Open ↗
Showing 3 of 16 on file for this type
▸BISPLACE OF ASSEMBLY2
03/20/2013320723062Open ↗
03/20/2013320723053Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/15/2016321282973Open ↗
05/15/2016321282973Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/10/2011320150643Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026B01067129-I1Open ↗
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
04/09/2018321652911Open ↗
04/09/2018321652911Open ↗
03/20/2017321282973Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
04/09/2018321652911Open ↗
05/18/2016340373198Open ↗
03/30/2016321282973Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B00068581-I1Open ↗
08/24/2026B01067129-I1Open ↗
08/21/2026B01231051-S1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/09/2018321652911Open ↗
03/30/2016321282973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01231051-I1Open ↗
08/24/2026B01067129-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
10/14/2011320381207Open ↗
01/03/2011320150643Open ↗
12/15/2010320150643Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/10/2016340373198Open ↗
02/26/2014340098548Open ↗
02/26/2014340098548Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/20/2016321282973Open ↗
03/30/2016321282973Open ↗
03/30/2016321282973Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
09/26/2011320150643Open ↗
01/24/2011320150643Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/13/2026B01231051-S1Open ↗
08/13/2026B01067129-I1Open ↗
08/13/2026B01132031-I1Open ↗
Showing 3 of 4 on file for this type
▸BISST-1 Street Tree Checklist2
12/15/2010320150643Open ↗
10/04/2010320150643Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
04/10/2018321652911Open ↗
04/25/2016321282973Open ↗
▸BISTenant Protection Plan and Notes2
04/09/2018321652911Open ↗
04/25/2016321282973Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist2
12/15/2010320150643Open ↗
07/23/2010320150643Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026B01067129-I1Open ↗
▸Environmental & Asbestos23
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/18/2016340373198Open ↗
04/25/2016321282973Open ↗
01/02/2014340098548Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
06/28/2011320324868Open ↗
10/27/2008310217743Open ↗
10/27/2008310216904Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/15/2011320381207Open ↗
10/15/2011320381207Open ↗
04/28/2010320150643Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026B00068581-I1Open ↗
08/21/2026B01231051-S1Open ↗
08/21/2026B01231051-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026B01231051-I1Open ↗
08/13/2026B01231051-S1Open ↗
08/13/2026B00068581-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
05/18/2016340373198Open ↗
04/22/2016321282973Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B01231051-I1Open ↗
08/13/2026B00068581-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/10/2018321652911Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/09/2018321652911Open ↗
06/10/2016340373198Open ↗
04/25/2016321282973Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/10/2016340373198Open ↗
02/26/2014340098548Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/06/2022320150643Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/31/2016340373198Open ↗
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/06/2022320150643Open ↗
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS9
03/30/2016321282973Open ↗
03/25/2013320729253Open ↗
09/21/2012320587049Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/24/2023320150643Open ↗
02/03/2023320150643Open ↗
08/16/2022320150643Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/10/2016340373198Open ↗
06/10/2016340373198Open ↗
04/18/2013320723053Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/10/2016340373198Open ↗
02/26/2014340098548Open ↗
08/12/2013320729253Open ↗
Showing 3 of 4 on file for this type
▸BISThird Party Electrical Signoff Compliance Report1
08/12/2013320729253Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
04/09/2018321652911Open ↗
06/10/2016340373198Open ↗
05/18/2016340373198Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2022320150643Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET12
04/09/2018321652911Open ↗
04/06/2016321282973Open ↗
04/06/2016321282973Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION3
02/28/2020321652911Open ↗
01/12/2011320150643Open ↗
12/15/2010320150643Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/18/2016340373198Open ↗
01/02/2014340098548Open ↗
▸Other Documents9
▸BISPLOT DIAGRAM3
07/26/2010320150643Open ↗
04/28/2010320150643Open ↗
12/15/2010320150643Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
01/02/2014340098548Open ↗
01/20/2011320150643Open ↗
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
02/14/2023320150643Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
04/10/2018321652911Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026B00068581-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026B00068581-I1Open ↗