Elevator apt, fireproof without stores
Rockefeller University Residential
500 EAST 63 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1090711
💬 Discuss this project
1975Year Built
26Stories
D3Building Class
R10Zoning
283,000 sfGross Floor Area
275Units
LL97 CoveredRent Stabilized8 Open Violations 3 unresolved · 5 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: THE ROCKEFELLER UNIVERSITY · 42,035 sf lot · 6.73 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JMV CONSULTING ENGINEERING103/14/2023
CONLON ENGINEERING, LLC103/14/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE TURBOCHYLL COMPANY INGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONLON ENGINEERING, LLC4722103/14/2023
CROSSCHECK INSPECTION SER544103/14/2023
JMV CONSULTING ENGINEERIN804203/14/2023
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Signed Off (2)Violation (4)Special Inspection (6)
02/07/2024
Signed off — Alteration
M00834265-I1
01/09/2024
Signed off — Alteration
MECHANICAL WORK TO ACCOMMODATE COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00834258-I1
04/26/2023
Permit issued — Structural
M00834265-I1-ST
04/26/2023
Permit issued — Mechanical Systems
M00834258-I1-MS
03/14/2023
Filed — Alteration
M00834265-I1
03/14/2023
Filed — Alteration
MECHANICAL WORK TO ACCOMMODATE COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00834258-I1
03/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Vuto
03/07/2023
Special inspection requirement — Maintenance information
Joseph Vuto
03/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
03/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Vuto
02/23/2023
Special inspection requirement — Mechanical Systems
Joseph Vuto
02/23/2023
Special inspection requirement — Final
Joseph Vuto
01/03/2023
Violation issued (ECB, open)
Local Law
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
07/30/2020
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTHE TURBOCHYLL COMPANY IN04/26/2023
DOB NOWMechanical SystemsSigned-offTHE TURBOCHYLL COMPANY IN04/26/2023
1 project · most recent 09/21/2020
FiledStatusContractorScope
09/21/2020CompleteOPTIMAL ELECTRIC, INC—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/13/2023Tenant Protection Plan ComplianceJoseph Vutospecial
03/07/2023Maintenance informationJoseph Vutoenergy_progress
03/07/2023HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
03/07/2023HVAC-R and service water heating system controlsJoseph Vutoenergy_progress
02/23/2023Mechanical SystemsJoseph Vutospecial
02/23/2023FinalJoseph Vutoprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026M00834265-I1Request digital key ↗
08/31/2026M00834258-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026M00834258-I1Open ↗
08/24/2026M00834258-I1Open ↗
08/24/2026M00834258-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026M00834265-I1Open ↗
08/31/2026M00834258-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M00834258-I1Open ↗
08/24/2026M00834258-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026M00834265-I1Open ↗
08/31/2026M00834258-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/31/2026M00834265-I1Open ↗
08/13/2026M00834258-I1Open ↗