← Back
Dormitory
International House
500 RIVERSIDE DRIVE · BIN 1059870
💬 Discuss this project
1926Year Built
13Stories
H8Building Class
R8Zoning
258,120 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SAFE
Dormitory · Owner of record: INTERNATIONAL HOUSE · 27,900 sf lot · 9.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction19p · 2 filings · 11 docs
Cellar33p · 2 filings · 20 docs
Sub-Cellar66p · 6 filings · 20 docs
Basement1p · 1 filing · 9 docs
Sub-Basement37p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INTERNATIONAL HOUSE13607/22/2026
PRATT CONSTRUCTION1907/08/2026
KINGS GROUP NY CORP503/22/2026
TRICE CONTRACTING303/22/2026
TRICE CONTRACTING INC 1103/22/2026
APA GROUP103/22/2026
PILE FOUNDATION CONST. CO103/22/2026
OWNER OF 500 RIVERSIDE DR203/22/2026
BLUE WOODS MGMT GROUP103/21/2026
HUDSON WATERFRONT ASSOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WB ENGINEERS & CONSULTANTS PLLC1008/18/2026
THORNTON TOMASETTI201/08/2026
GENSLER209/08/2025
TOHFAZ UDDIN PE PC107/21/2025
BAZINI ENGINEERING, P.C.705/09/2025
BELMONT FREEMAN ARCHITECTS102/16/2023
ASHRAF CORP612/06/2021
BITOPI CONSULTANTS LLC102/06/2020
ROYAL ENGINEERING, P.C110/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC503/21/2026
RIZZO GROUP1403/21/2026
AK CONSULTING SERVICES203/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
SPRING SCAFFOLDING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRATT CONSTRUCTION & RESTGeneral Contractor1607/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor1507/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor407/08/2026
J L HVAC INCGeneral Contractor403/21/2026
TRICE CONTRACTING INCGeneral Contractor307/08/2026
BEDROCK PLBG. & HTG., INCPlumbing306/28/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/22/2026
NAT'L MECH. SVCS PLBG LLCPlumbing207/08/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
FIDELIS CONTRACTING INCGeneral Contractor107/08/2026
ARTECO AND DESIGN RESTORAElectrical103/21/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
ASANKOMAH, KOFIElectrical103/21/2026
BEHNAMBAKHSH, SHAYANElectrical103/21/2026
GLENFORD HARRINGTONElectrical103/21/2026
KLEIN, HOWARDElectrical103/21/2026
MARK BOBBElectrical103/21/2026
OTTEN, GERALDElectrical103/21/2026
SPIELER, RONALDElectrical103/21/2026
WINGTON, RANDYElectrical103/21/2026
PSI PARTNERS, LLCFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WB ENGINEERING5331708/18/2026
GRANT ENGINEERING2627401/08/2026
Building Lifecycle
All (195)Filed (31)Permit Issued (31)Signed Off (5)Facade (FISP) (14)Violation (60)Inspection (24)Special Inspection (30)
08/18/2026
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (Sub Cellar Floor- I House) as per plans. No change to use, egress or occupancy.
M01195977-P4
07/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
David Bonifacic
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Bonifacic
07/22/2026
Special inspection requirement — Post-installed Anchors
David Bonifacic
07/21/2026
Permit issued — Construction Fence
M01234560-I1-FN
04/04/2026
Violation issued (ECB, open)
Construction
02/02/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/02/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/29/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/16/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
C
01/15/2026
Violation issued (HPD, closed)
B
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Stephen Morse
01/09/2026
Special inspection requirement — Final
Stephen Morse
01/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Stephen Morse
01/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Morse
01/09/2026
Special inspection requirement — Post-installed Anchors
Stephen Morse
01/09/2026
Special inspection requirement — Structural Steel - Welding
Stephen Morse
01/09/2026
Special inspection requirement — Structural Steel - Details
Stephen Morse
01/08/2026
Filed — Alteration
Structural modification on the on the cellar, Sub Cellar floor (I House) as per plans. No change to use, egress or occupancy.
M01195991-P1
12/23/2025
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (Sub Cellar Floor- I House) as per plans. No change to use, egress or occupancy.
M01195977-P3
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2025
Special inspection requirement — Structural Steel - Details
Stephen Morse
11/13/2025
Special inspection requirement — Post-installed Anchors
Stephen Morse
11/13/2025
Special inspection requirement — Final
Stephen Morse
11/13/2025
Special inspection requirement — Structural Steel - Welding
Stephen Morse
11/13/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Stephen Morse
11/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Stephen Morse
11/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Morse
10/28/2025
Permit issued — Mechanical Systems
M01204119-I1-MS
10/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2025
Permit issued — General Construction
M01200295-I1-GC
10/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2025
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (Sub Cellar Floor- I House) as per plans. No change to use, egress or occupancy.
M01195977-P2
09/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2025
Special inspection requirement — Post-installed Anchors
David Bonifacic
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Bonifacic
09/09/2025
Filed — Alteration
Mechanical: Modifications to the existing HVAC system on the (1st Floor- I House) as per plans. No change to use, egress or occupancy.
M01204119-I1
09/09/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
09/09/2025
Special inspection requirement — Shutoff dampers
David Bonifacic
09/08/2025
Filed — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor and adjacent south patio ( I- House) as per plans. No change to use, egress or occupancy.
M01200295-I1
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Bonifacic
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
David Bonifacic
09/05/2025
Special inspection requirement — Maintenance information
David Bonifacic
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Bonifacic
09/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
David Bonifacic
09/05/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
David Bonifacic
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
David Bonifacic
07/21/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE FRONT OF THE BUILDING AT RIVERISIDE DRIVE ON THE SOUTH ELEVATION.
M01234560-I1
07/21/2025
Permit issued — Construction Fence
M01234560-I1-FN
07/21/2025
Permit issued — Structural
M01195991-I1-ST
07/16/2025
Filed — Alteration
Plumbing: Modifications to the existing plumbing system on the (Sub Cellar Floor- I House) as per plans. No change to use, egress or occupancy.
M01195977-P1
07/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Permit issued — Mechanical Systems
M01195974-I1-MS
06/12/2025
Permit issued — General Construction
M01195969-I1-GC
06/11/2025
Permit issued — Sprinklers
M01195986-I1-EW-SP
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC07/21/2026
DOB NOWMechanical SystemsPermit IssuedJ L HVAC10/28/2025
DOB NOWGeneral ConstructionPermit IssuedBENCHMARK BUILDERS LLC10/10/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC07/21/2025
DOB NOWStructuralPermit IssuedBENCHMARK BUILDERS LLC07/21/2025
DOB NOWMechanical SystemsSigned-offJ L HVAC06/13/2025
DOB NOWGeneral ConstructionPermit IssuedBENCHMARK BUILDERS LLC06/12/2025
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC06/11/2025
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC06/10/2025
DOB NOWBoiler EquipmentSigned-offTHE METRO GROUP PLBG LLC04/25/2025
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC04/25/2025
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC09/10/2024
DOB NOWPlumbingPermit IssuedNAT'L MECH. SVCS PLBG LLC09/10/2024
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C03/17/2023
DOB NOWGeneral ConstructionPermit IssuedTRICE CONTRACTING INC02/24/2023
DOB NOWMechanical SystemsPermit IssuedTRICE CONTRACTING INC02/22/2023
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEM INSTALLATION09/26/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedINTERSYSTEM INSTALLATION12/07/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION12/02/2021
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION12/02/2021
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*06/02/2021
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION05/17/2021
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*01/15/2021
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*09/24/2020
DOB NOWSidewalk ShedPermit IssuedFIDELIS CONTRACTING INC02/07/2020
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*01/27/2020
DOB NOWSupported ScaffoldSigned-offPRATT CONSTRUCTION & RES*08/15/2019
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*07/08/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/12/2018
BISOTISSUEDTRICE CONTRACTING INC07/01/2021
BISOTISSUEDPRATT CONSTRUCTION & REST04/07/2021
BISOTISSUEDPRATT CONSTRUCTION & REST03/25/2021
BISOTISSUEDPRATT CONSTRUCTION & REST05/27/2020
BISOTISSUEDAPA GROUP INC03/24/2020
BISOTISSUEDAPA GROUP INC02/26/2020
BISOTISSUEDAPA GROUP INC11/29/2018
BISPLRE-ISSUEDNAT'L MECH. SVCS PLBG LLC05/24/2018
BISSPISSUEDGO PRO FIRE PROTECTION C02/02/2018
+ 41 more permits on file
2 projects · most recent 09/09/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2025Permit IssuedJ L HVAC INCAir Conditioning Systems
Cooling
Daikin FXQ48TBVJU 14,510 CFM · Vrf Outdoor ×1
FXSQ24TBVJU 9,935 CFM · Vrf Indoor ×1
06/02/2025Signed-offJ L HVAC INCAir Conditioning Systems
Cooling
Daikin RXYQ72AATJB 6,210 CFM · Vrf Outdoor ×1
1 project · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025Signed-offPSI PARTNERS, LLC6 heads
3 projects · most recent 08/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedBEDROCK PLBG. & HTG., INCGas, Water/Sanitary
05/09/2025Permit IssuedTHE METRO GROUP PLBG LLCGas
02/16/2023Permit IssuedZONE PLUMBING & HEATING CWater/Sanitary
11 projects · most recent 07/01/2026
General Wiring
FiledStatusContractorScope
07/01/2026Permit IssuedEPIC ELECTRIC INCGeneral Wiring
04/23/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
04/12/2023Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
04/11/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/05/2022CompleteSTEVEN FARKAS—
12/27/2021CompleteSTEVEN FARKAS—
09/23/2021CompleteH. & L. ELECTRIC INCGeneral Wiring
09/25/2019CompleteH. & L. ELECTRIC INCGeneral Wiring
09/17/2019CompleteSTEVEN FARKAS—
07/02/2019CompleteSTEVEN FARKAS—
10/11/2018CompleteMEO ELECTRIC CORP—
1 project · most recent 01/08/2026
Steel Concrete
FiledStatusContractorScope
01/08/2026Permit IssuedBENCHMARK BUILDERS LLCSteel, Concrete
1 project · most recent 07/21/2025
Fence
FiledStatusContractorScope
07/21/2025Signed-offSPRING SCAFFOLDING LLCFence
1 project · most recent 09/08/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/08/2025Permit IssuedBENCHMARK BUILDERS LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
02/02/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/02/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/29/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Fail-Final Boiler Equipment InspectionFailView ↗
12/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
07/23/2026Tenant Protection Plan ComplianceDavid Bonifacicspecial
07/22/2026Post-installed AnchorsDavid Bonifacicspecial
07/22/2026Fire-Resistant Penetrations and JointsDavid Bonifacicspecial
01/09/2026Post-installed AnchorsStephen Morsespecial
01/09/2026Tenant Protection Plan ComplianceStephen Morsespecial
01/09/2026FinalStephen Morseprogress
01/09/2026Structural Steel - DetailsStephen Morsespecial
01/09/2026Structural Steel - High Strength BoltingStephen Morsespecial
01/09/2026Structural Stability – Alterations of existing buildingsStephen Morsespecial
01/09/2026Structural Steel - WeldingStephen Morsespecial
11/13/2025Structural Steel - WeldingStephen Morsespecial
11/13/2025FinalStephen Morseprogress
11/13/2025Tenant Protection Plan ComplianceStephen Morsespecial
11/13/2025Post-installed AnchorsStephen Morsespecial
11/13/2025Structural Steel - DetailsStephen Morsespecial
11/13/2025Structural Stability – Alterations of existing buildingsStephen Morsespecial
11/13/2025Structural Steel - High Strength BoltingStephen Morsespecial
09/11/2025Tenant Protection Plan Compliance—special
09/10/2025Post-installed AnchorsDavid Bonifacicspecial
09/10/2025Fire-Resistant Penetrations and JointsDavid Bonifacicspecial
09/09/2025Shutoff dampersDavid Bonifacicenergy_progress
09/05/2025Duct leakage testing, insulation and designDavid Bonifacicenergy_progress
09/05/2025HVAC-R and service water heating system controlsDavid Bonifacicenergy_progress
09/05/2025Exhaust and Vent Systems in Plenums and DuctsDavid Bonifacicspecial
09/05/2025Maintenance informationDavid Bonifacicenergy_progress
Latest 25 of 64.
▾Documents — 1,015 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch27
09/06/2026M00087317-I1Request digital key ↗
09/03/2026M00639732-I1Request digital key ↗
09/03/2026M00639893-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00210624-I1Request digital key ↗
08/15/2026M00210624-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00181659-I1Request digital key ↗
09/05/2026M00307913-I1Request digital key ↗
▸Applications & Permits184
▸BISPLAN / WORK APPROVAL APPLICATION97
03/21/2025122513618Open ↗
03/19/2025122513618Open ↗
12/11/2024122513618Open ↗
Showing 3 of 97 on file for this type
▸BISWORK PERMIT APPLICATION70
07/01/2021123692067Open ↗
04/07/2021122912018Open ↗
04/06/2021122912018Open ↗
Showing 3 of 70 on file for this type
▸BISPLACE OF ASSEMBLY12
11/18/2019122678165Open ↗
11/18/2019122678174Open ↗
Showing 2 of 12 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/09/2024122513618Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING RESOLUTION DETERMINATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸Seals & Professional Certifications247
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION113
11/18/2019122678165Open ↗
11/18/2019122678165Open ↗
11/18/2019122678174Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/05/2026M00181659-I1Open ↗
09/05/2026M00210624-P1Open ↗
09/05/2026M00210624-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/23/2026M01204119-I1Open ↗
09/02/2026M01195974-I1Open ↗
09/01/2026M01195991-P1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
05/23/2018140768505Open ↗
05/09/2017123090868Open ↗
Showing 2 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M01204119-I1Open ↗
09/23/2026M01204119-I1Open ↗
09/02/2026M01195974-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION11
05/23/2018140768505Open ↗
Showing 1 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
05/23/2018140768505Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment39
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
04/15/2019120474478Open ↗
01/14/2019120474478Open ↗
12/17/2018120474478Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/23/2018140768505Open ↗
Showing 1 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
10/21/2021122513618Open ↗
11/06/2019122513618Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/30/2017140574581Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes9
10/04/2019123692067Open ↗
08/09/2019123692049Open ↗
09/24/2018123460209Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00181659-I1Open ↗
08/13/2026M00307913-I1Open ↗
08/13/2026M00210624-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos65
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/31/2026M00820683-I1Open ↗
08/31/2026M00820070-I1Open ↗
08/23/2026M01081330-P5Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
01/13/2020123692067Open ↗
11/30/2018123460209Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/23/2018140768505Open ↗
Showing 1 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
10/04/2019123692067Open ↗
08/09/2019123692049Open ↗
12/04/2018140768505Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
09/20/2021122912018Open ↗
09/20/2021123692067Open ↗
06/02/2020123460209Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/20/2021122912018Open ↗
09/20/2021123692067Open ↗
06/02/2020123460209Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/23/2018140768505Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY15
09/20/2021122912018Open ↗
09/20/2021123692067Open ↗
09/11/2020120474478Open ↗
Showing 3 of 15 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/18/2019122678165Open ↗
11/18/2019122678174Open ↗
▸Approvals, Objections & Sign-offs124
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
10/21/2021122513618Open ↗
10/20/2021122513618Open ↗
09/20/2021122912018Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/05/2026M00181659-I1Open ↗
09/03/2026M00639732-I1Open ↗
08/23/2026M01081330-P4Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISCCD1-Construction Code Determination13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
11/18/2019122678165Open ↗
11/18/2019122678165Open ↗
11/18/2019122678174Open ↗
Showing 3 of 9 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/26/2019122513618Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER1
07/01/2021123692067Open ↗
▸Cost, Insurance & Ownership76
▸BISCOST AFFIDAVIT75
09/20/2021122912018Open ↗
09/20/2021123692067Open ↗
09/11/2020120474478Open ↗
Showing 3 of 75 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET38
10/04/2019123692067Open ↗
08/09/2019123692049Open ↗
09/24/2018123460209Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM31
10/22/2021122513618Open ↗
07/01/2021123692067Open ↗
04/07/2021122912018Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION12
03/23/2021122912018Open ↗
04/17/2019120474478Open ↗
Showing 2 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
05/23/2018140768505Open ↗
Showing 1 of 12 on file for this type
▸Other Documents33
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION21
10/04/2019123692067Open ↗
08/09/2019123692049Open ↗
12/04/2018140768505Open ↗
Showing 3 of 21 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M00820070-I1Open ↗
08/13/2026M00820657-I1Open ↗
08/13/2026M00820683-I1Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00087317-I1Open ↗