Condo, residential tower (mixed-use, multi-family elevator) [derived]
One High Line Condominium
500 WEST 18TH STREET · BIN 1090682
💬 Discuss this project
2017Year Built
36Stories
RMBuilding Class
C6-4Zoning
744,344 sfGross Floor Area
238Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 76 ELEVENTH AVENUE PROPERTY OWNER LLC · 76,425 sf lot · 9.74 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 351p · 1 filing · 15 docs
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 282p · 1 filing · 20 docs
Floor 27
Floor 26
Floor 2511p · 1 filing · 20 docs
Floor 24
Floor 23
Floor 22Under Construction1 filing · 20 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 171p · 1 filing · 4 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 62p · 1 filing · 7 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
76 ELEVENTH AVENUE PROPER103/22/2026
ONE HIGH LINE CONDOMINIUM DOUGLAS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1403/21/2026
JAM CONSULTANTS, INC.1003/21/2026
STEVEN M YANG ARCHITECT803/21/2026
DVA Advisors503/21/2026
I L CONSULTING403/21/2026
JM ZONING, LLC.803/21/2026
YAO W GUO ARCHITECT, PC603/21/2026
KX CONSULTING203/21/2026
AZAR ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIEBHABER COMPANY INCGeneral Contractor907/08/2026
DONATO PLUMBING, INCPlumbing507/08/2026
AIR FORCE MECHANICAL CORPGeneral Contractor404/09/2026
KG SPRINKLER CORPFire Protection307/08/2026
BOGEN INCGeneral Contractor304/09/2026
EK EURO GROUP INCGeneral Contractor203/21/2026
HUDSON GREEN CRAFT LLCGeneral Contractor204/09/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor207/08/2026
LTB MECHANICAL CORPGeneral Contractor203/21/2026
B.A.C.C BUILDERS INCGeneral Contractor203/21/2026
CHRISTOS FARANTATOSGeneral Contractor203/21/2026
CYPRESS GREEN CONST COGeneral Contractor204/09/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
MACREDDIN PLBG & HTG INCPlumbing107/08/2026
SHUIR ELEC'L CONTR'S CORPElectrical103/22/2026
ANESIS SERVICES CORPFire Protection106/28/2026
BUCKMILLER AUTO.SPKLR.CORFire Protection107/08/2026
FORTE EXPRESS P & H INCFire Protection107/08/2026
MENTORS CONSTRUCTION INCGeneral Contractor107/08/2026
THE SHERIDAN GROUP PARTNGeneral Contractor107/08/2026
ACCURATE MECH INDSTRS INCPlumbing109/17/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
BEK PLBG & HTG LLCPlumbing107/08/2026
FORTE EXPRESS P & H INCPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS7079208/27/2026
SOCOTEC ENGINEERING4983507/15/2026
ALAN MARGOLIN & ASSOC423111/18/2025
PAUL DENIS ASSOCIATES2472311/14/2025
IP GROUP2542209/30/2025
MACIA INSPECTION & TESTIN402604/17/2025
IP PROF. ENG. PC9709304/14/2025
AKS ARCHITECTURAL & ENGIN1957104/11/2025
STEVEN M YANG ARCHITECT3175203/13/2025
KADAN CORP.5956102/11/2025
Building Lifecycle
All (205)Filed (38)Permit Issued (40)Signed Off (21)Violation (2)Inspection (28)Objection (46)Special Inspection (30)
09/16/2026
Permit issued — Plumbing
M01436077-S2-PL
09/03/2026
Objection raised — Cost
09/03/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
08/31/2026
Objection raised — Other
08/31/2026
Objection resolved — Addressed
08/28/2026
Objection raised — Other
08/27/2026
Filed — Alteration
Sprinkler work as shown on plans.
M01436077-I1
08/27/2026
Filed — Alteration
Sprinkler work as shown on plans.
M01436077-S3
08/26/2026
Signed off — Alteration
Sprinkler work associated with the interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
M01197315-S2
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EVAN PARGANOS
07/24/2026
Special inspection requirement — Sprinkler Systems
EVAN PARGANOS
07/24/2026
Special inspection requirement — Final
EVAN PARGANOS
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
EVAN PARGANOS
07/24/2026
Special inspection requirement — Lighting in dwelling units
EVAN PARGANOS
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EVAN PARGANOS
07/24/2026
Special inspection requirement — Post-installed Anchors
EVAN PARGANOS
07/16/2026
Signed off — Alteration
Sprinkler work associated with the interior renovation of the existing residential unit #28A. No change in use, occupancy or egress with this filing.
M01197315-S1
07/16/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
07/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
07/16/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/16/2026
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
07/16/2026
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
07/16/2026
Special inspection requirement — Structural Cold-Formed Steel
ALEXIS SCHLESSINGERMAN
07/15/2026
Signed off — Alteration
Relocate 9 sprinkler heads, add 2 sprinkler heads, remove 5 heads. No change to use, egress, or occupancy.
M01186352-S5
07/15/2026
Signed off — Alteration
Relocate 9 sprinkler heads, add 2 sprinkler heads, remove 5 heads. No change to use, egress, or occupancy.
M01186352-I1
07/15/2026
Filed — Alteration
Modifications to an existing sprinkler system (Penthouse 26 / PH 26).
M01134412-P1
07/15/2026
Signed off — Alteration
Relocate 9 sprinkler heads, add 2 sprinkler heads, remove 5 heads. No change to use, egress, or occupancy.
M01186352-S4
07/07/2026
Signed off — Alteration
Modifications to an existing sprinkler system (Penthouse 26 / PH 26).
M01134412-S3
05/29/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
05/28/2026
Special inspection requirement — Structural Cold-Formed Steel
ALEXIS SCHLESSINGERMAN
05/28/2026
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
05/28/2026
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
05/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
05/28/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/28/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/19/2026
Signed off — Alteration
Modifications to an existing sprinkler system (Penthouse 26 / PH 26).
M01134412-S2
05/19/2026
Signed off — Alteration
Relocate 9 sprinkler heads, add 2 sprinkler heads, remove 5 heads. No change to use, egress, or occupancy.
M01186352-S6
05/15/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
05/14/2026
Signed off — Alteration
Modifications to an existing sprinkler system (Penthouse 26 / PH 26).
M01134412-I1
04/27/2026
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
04/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Signed off — Alteration
HEREWITH FILING FOR MODIFICATION OF MECHANCIAL DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01103801-S2
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Permit issued — Plumbing
M01134412-S3-PL
03/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2026
Signed off — Alteration
HEREWITH FILING FOR MODIFICATION OF MECHANCIAL DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01103801-S1
03/09/2026
Signed off — Alteration
HEREWITH FILING FOR MODIFICATION OF MECHANCIAL DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01103801-I1
01/16/2026
Signed off — Alteration
RENOVATION OF UNIT #6E, A DUPLEX ON 4TH AND 5TH FLOORS, WITH WORK ON PRIVATE 5TH FLOOR TERRACE. REMOVAL/INSTALLATION OF NON-LOADBEARING PARTITIONS AND CEILING.
M01171944-I1
01/13/2026
Signed off — Alteration
Install new concrete pads under new pergola posts for unit 6E East Terrace.
M01174548-I1
12/17/2025
Objection resolved — Addressed
12/13/2025
Objection raised — Scope
12/10/2025
Filed — Alteration
INTERIOR RENOVATION TO APT#E24A. MINOR PARTITIONS WORK AND FINISHES. MODIFICATION TO LIGHTING. ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01328039-I1
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Jones
12/09/2025
Special inspection requirement — Lighting in dwelling units
Jeffrey Jones
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/03/2025
Special inspection requirement — Final
Jeffrey Jones
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedACCURATE MECH INDSTRS INC09/16/2026
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/19/2026
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR10/01/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC09/15/2025
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC09/12/2025
DOB NOWMechanical SystemsSigned-offAIR FORCE MECHANICAL09/11/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC07/29/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC07/29/2025
DOB NOWMechanical SystemsSigned-offHUDSON GREEN CRAFT LLC07/15/2025
DOB NOWSprinklersSigned-offTHOMAS FAY07/14/2025
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/27/2025
DOB NOWGeneral ConstructionSigned-offHUDSON GREEN CRAFT LLC06/04/2025
DOB NOWSprinklersSigned-offFORTE EXPRESS P & H INC04/25/2025
DOB NOWMechanical SystemsSigned-offLIEBHABER COMPANY04/22/2025
DOB NOWGeneral ConstructionSigned-offLIEBHABER COMPANY04/22/2025
DOB NOWStructuralSigned-offLIEBHABER COMPANY04/21/2025
DOB NOWMechanical SystemsSigned-offLTB MECHANICAL04/16/2025
DOB NOWPlumbingSigned-offFORTE EXPRESS P & H INC04/15/2025
DOB NOWGeneral ConstructionSigned-offBOGEN INC04/11/2025
DOB NOWGeneral ConstructionPermit IssuedCHRISTOS FARANTATOS04/10/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR04/03/2025
DOB NOWStructuralSigned-offCYPRESS GREEN CONST CO03/24/2025
DOB NOWGeneral ConstructionSigned-offCYPRESS GREEN CONST CO03/12/2025
DOB NOWSprinklersPermit IssuedBUCKMILLER AUTO.SPKLR.COR01/24/2025
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/24/2025
DOB NOWGeneral ConstructionSigned-offEK EURO GROUP01/16/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC12/18/2024
DOB NOWMechanical SystemsSigned-offLIEBHABER COMPANY12/13/2024
DOB NOWStructuralSigned-offLIEBHABER COMPANY12/13/2024
DOB NOWGeneral ConstructionSigned-offLIEBHABER COMPANY12/13/2024
DOB NOWMechanical SystemsSigned-offAIR FORCE MECHANICAL09/09/2024
DOB NOWPlumbingSigned-offH M SPRINKLER INC09/09/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC09/06/2024
DOB NOWMechanical SystemsSigned-offAIR FORCE MECHANICAL09/06/2024
DOB NOWGeneral ConstructionSigned-offBOGEN INC09/04/2024
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC07/26/2024
DOB NOWGeneral ConstructionSigned-offMENTORS CONSTRUCTION INC07/24/2024
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC01/24/2024
DOB NOWGeneral ConstructionSigned-offTHE SHERIDAN GROUP PARTN01/19/2024
DOB NOWGeneral ConstructionSigned-offB.A.C.C BUILDERS INC01/11/2024
4 projects · most recent 08/27/2026
Sprinkler System
FiledStatusContractorScope
08/27/2026——Sprinkler System
07/15/2026Permit IssuedBUCKMILLER AUTO.SPKLR.COR20 heads
11/14/2025Signed-offKG SPRINKLER CORPSprinkler System
09/30/2025Signed-offTHOMAS FAYSprinkler System
5 projects · most recent 08/27/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/27/2026Permit IssuedACCURATE MECH INDSTRS INCWater/Sanitary
07/15/2026Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
11/14/2025Signed-offDONATO PLUMBING, INCWater/Sanitary
09/30/2025Signed-offHYDROKINETIC PLBG & HTG IWater/Sanitary
03/19/2025——Water/Sanitary
23 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedXELA ELECTRICAL CORPGeneral Wiring
08/10/2026CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
04/17/2026CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
03/24/2026CompleteUSIS ELECTRIC INCGeneral Wiring
03/16/2026CompleteWARREN OSTROFF ELEC., INC—
03/13/2026CompleteAPOLLO ELECTRIC INC.General Wiring
12/17/2025Permit IssuedDCE CORPORATIONGeneral Wiring
10/08/2025CancelledAPN ELECTRICAL CORPGeneral Wiring
08/12/2025CompleteGLENDALE ELECTL CONTNG IN—
05/22/2025CompleteLEADER ELECTRIC CO., INCGeneral Wiring
05/15/2025CancelledLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
04/23/2025CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
04/17/2025CompleteAPOLLO ELECTRIC INC.—
04/01/2025CancelledJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/22/2025CancelledAPN ELECTRICAL CORPGeneral Wiring
1 project · most recent 07/15/2026
Steel
FiledStatusContractorScope
07/15/2026Signed-offDONATO PLUMBING, INCSteel
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
05/29/2026Pass-Final SD - Fire PumpPassView ↗
05/15/2026Fail-Final SD - Fire PumpFailView ↗
04/27/2026Pass-Final SD - More than 10 Requested FloorsPassView ↗
04/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
08/26/2026Fire-Resistant Penetrations and JointsEVAN PARGANOSspecial
07/24/2026Sprinkler SystemsEVAN PARGANOSspecial
07/24/2026Post-installed AnchorsEVAN PARGANOSspecial
07/24/2026Fire-Resistant Penetrations and JointsEVAN PARGANOSspecial
07/24/2026FinalEVAN PARGANOSprogress
07/24/2026Energy Code Compliance InspectionsEVAN PARGANOSprogress
07/24/2026Lighting in dwelling unitsEVAN PARGANOSenergy_progress
07/16/2026Structural Cold-Formed SteelALEXIS SCHLESSINGERMANspecial
07/16/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
07/16/2026FinalALEXIS SCHLESSINGERMANprogress
07/16/2026Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
07/16/2026Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
07/16/2026Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
05/28/2026Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
05/28/2026Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
05/28/2026Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
05/28/2026FinalALEXIS SCHLESSINGERMANprogress
05/28/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/28/2026Structural Cold-Formed SteelALEXIS SCHLESSINGERMANspecial
12/09/2025Lighting in dwelling unitsJeffrey Jonesenergy_progress
12/09/2025Energy Code Compliance InspectionsJeffrey Jonesprogress
12/03/2025FinalJeffrey Jonesprogress
11/20/2025Lighting in dwelling units—energy_progress
11/20/2025Interior lighting power—energy_progress
11/14/2025Sprinkler SystemsPAUL DENISspecial
Latest 25 of 105.
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
09/14/2026M01436077-I1Request digital key ↗
09/14/2026M01436077-S3Request digital key ↗
09/14/2026M01436077-S2Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits2
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M01186352-I1Open ↗
08/13/2026M01163822-I1Open ↗
▸Seals & Professional Certifications122
▸DOB NOWProgress Inspector Seal & Signature52
09/29/2026M01171944-I1Open ↗
09/23/2026M01436077-I1Open ↗
09/23/2026M01436077-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/14/2026M01436077-I1Open ↗
09/14/2026M01436077-S2Open ↗
09/14/2026M01436077-S3Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026M01436077-I1Open ↗
09/23/2026M01436077-I1Open ↗
09/23/2026M01436077-S1Open ↗
Showing 3 of 30 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWCertificate of No Harassment5
09/14/2026M01436077-I1Open ↗
08/13/2026M01197315-I1Open ↗
08/13/2026M01328039-I1Open ↗
Showing 3 of 5 on file for this type