500 WEST 218 STREET
MANHATTAN · Inwood · BIN 1091932
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Open Violations ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing
Floor 6Under Construction1 filing
Floor 5Under Construction1 filing
Floor 4Under Construction1 filing
Floor 3Under Construction1 filing
Floor 2
Floor 1
Site & exteriorUnder Construction4 filings
Filed — no permit issued2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1009/08/2026
CANDOR CAPITAL ONE809/19/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor708/18/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/08/2026
TARGET CONSTRUCTION LLCGeneral Contractor209/19/2026
MPI PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161407/24/2026
VALJATO ENGINEERING PC2486105/29/2026
Building Lifecycle
All (124)Filed (24)Permit Issued (18)Violation (3)Inspection (3)Objection (46)Special Inspection (30)
09/18/2026
Permit issued — General Construction
M01257465-I1-GC
08/27/2026
Violation issued (ECB, open)
Site Safety
08/19/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/19/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
08/17/2026
Permit issued — Sidewalk Shed
M01409481-I1-SH
07/24/2026
Filed — New Building
STRUCTURAL FILED IN CONJUNCTION WITH NB # M01257465-I1
M01257465-P7
07/23/2026
Violation issued (ECB, open)
Construction
07/23/2026
Violation issued (ECB, open)
Construction
07/20/2026
Objection resolved — Resolved
07/06/2026
Permit issued — Protection and Mechanical Methods
M01419152-I1-PMM
07/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01424039-I1
07/02/2026
Permit issued — Protection and Mechanical Methods
M01424039-I1-PMM
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Energy
07/02/2026
Objection raised — Other
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01419152-I1
06/23/2026
Permit issued — Supported Scaffold
M01419162-I1-SF
06/22/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
06/18/2026
Filed — Alteration
M01419162-I1
06/15/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/15/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
06/15/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
06/15/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/11/2026
Filed — New Building
STRUCTURAL FILED IN CONJUNCTION WITH NB # M01257465-I1
M01257465-P6
06/08/2026
Permit issued — General Construction
M01257465-I1-GC
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Luminous Exit Path Markings
06/08/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/08/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
06/03/2026
Objection resolved — Addressed
06/02/2026
Permit issued — Sidewalk Shed
M01409481-I1-SH
06/02/2026
Objection raised — Other
06/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01409505-I1
06/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01409481-I1
06/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01409497-I1
06/01/2026
Permit issued — Protection and Mechanical Methods
M01409505-I1-PMM
06/01/2026
Permit issued — Protection and Mechanical Methods
M01409497-I1-PMM
05/29/2026
Filed — Alteration
KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01395326-I1
05/28/2026
Permit issued — Standpipe
M01257465-S6-EW-SD
05/27/2026
Filed — New Building
STRUCTURAL FILED IN CONJUNCTION WITH NB # M01257465-I1
M01257465-P3
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC09/18/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.07/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.07/02/2026
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/23/2026
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC06/08/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/01/2026
DOB NOWStandpipePermit IssuedRIGHTWAY PLBG AND HTG INC05/28/2026
DOB NOWStandpipePermit IssuedRIGHTWAY PLBG AND HTG INC05/27/2026
DOB NOWPlumbingPermit IssuedMPI PLUMBING CORP05/26/2026
DOB NOWStandpipePermit IssuedMPI PLUMBING CORP05/26/2026
DOB NOWSupport of ExcavationPermit IssuedTARGET CONSTRUCTION LLC03/30/2026
DOB NOWMechanical SystemsPermit IssuedTARGET CONSTRUCTION LLC03/25/2026
DOB NOWStructuralPermit IssuedTARGET CONSTRUCTION LLC03/18/2026
DOB NOWSupport of ExcavationPermit IssuedTARGET CONSTRUCTION LLC03/18/2026
DOB NOWFoundationPermit IssuedTARGET CONSTRUCTION LLC03/18/2026
2 projects · most recent 07/24/2026
Heating and Air Conditioning Systems Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedTARGET CONSTRUCTION LLCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin REYQ168XATJU 147,594 BTU · Vrf Outdoor ×2
RK24NMVJU 24,000 BTU · Heat Pump Outdoor ×2
RN-016-8-0-K60E-12A:FEDF-ZLB-DQG 178,040 BTU · Heat Pump Outdoor ×2
RXLA36AAVJU 34,166 BTU · Heat Pump Outdoor ×2
RXLA48AAVJU 46,039 BTU · Heat Pump Outdoor ×2
Heating
Ouellet OAEU5000AM-E0 3 kW · Electric Heater ×72
03/06/2026——Others—
1 project · most recent 07/24/2026
Sprinkler System
FiledStatusContractorScope
07/24/2026Permit IssuedRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026Permit IssuedMPI PLUMBING CORP—
3 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
06/30/2026Permit IssuedSOLAS ELECTRICAL CORP—
06/02/2026Permit IssuedSOLAS ELECTRICAL CORP—
1 project · most recent 07/24/2026
Concrete
FiledStatusContractorScope
07/24/2026Permit IssuedTARGET CONSTRUCTION LLCConcrete
2 projects · most recent 07/24/2026
Fence Sidewalk Shed
FiledStatusContractorScope
07/24/2026Permit IssuedTARGET CONSTRUCTION LLCFence
06/01/2026Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
1 project · most recent 07/24/2026
Earthwork
FiledStatusContractorScope
07/24/2026Permit IssuedTARGET CONSTRUCTION LLCEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/22/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
08/19/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/19/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
08/19/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
08/19/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/19/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
08/19/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
08/19/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/19/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
08/19/2026FinalSHAHRIAR QUAYYUMprogress
06/15/2026Construction Operations Influencing Adjacent StructuresSHAHRIAR QUAYYUMspecial
06/15/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
06/15/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
06/15/2026FinalSHAHRIAR QUAYYUMprogress
06/08/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
06/08/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/08/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/08/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/08/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/08/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
06/08/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/08/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
06/08/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/08/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/08/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/08/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 106.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/21/2026M01257465-P7Request digital key ↗
08/21/2026M01257465-S5Request digital key ↗
08/19/2026M01359311-P2Request digital key ↗
Showing 3 of 27 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026M01257465-P6Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026M01257465-P6Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/19/2026M01359311-P2Open ↗
08/19/2026M01359311-I1Open ↗
08/17/2026M01257465-S7Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M01257465-S5Open ↗
09/23/2026M01257465-S6Open ↗
08/30/2026M01257465-S3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M01257465-S5Open ↗
09/23/2026M01257465-S5Open ↗
08/30/2026M01257465-S3Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026M01257465-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026M01257465-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026M01257465-P6Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed14
08/21/2026M01257465-S5Open ↗
08/17/2026M01257465-P5Open ↗
08/17/2026M01257465-S3Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT3
08/17/2026M01257465-P4Open ↗
08/17/2026M01257465-S2Open ↗
08/14/2026M01257465-P3Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/17/2026M01257465-I1Open ↗
08/17/2026M01257465-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026M01257465-P6Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026M01257465-P6Open ↗