← Back
Three families
5003 7 AVENUE
BROOKLYN · BIN 3013392
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
R7AZoning
2,964 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Three families · 1,520 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 1 filing · 20 docs
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1Under Construction21p · 2 filings · 20 docs
CellarUnder Construction21p · 2 filings · 20 docs
1 job · most recent 07/05/2026
Sprinkler System
FiledStatusContractorScope
07/05/2026——Sprinkler System
1 job · most recent 01/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/28/2026Permit IssuedCATMAN PLUMBING INCGas, Water/Sanitary
1 job · most recent 01/30/2026
General Wiring
FiledStatusContractorScope
01/30/2026Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
1 job · most recent 07/05/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/05/2026Permit IssuedJABBIE INDUSTRIES INCORP*Steel, Concrete, Masonry
1 job · most recent 07/05/2026
Fence
FiledStatusContractorScope
07/05/2026Permit IssuedJABBIE INDUSTRIES INCORP*Fence
Building Lifecycle
All (114)Filed (10)Permit Issued (7)Violation (20)Inspection (7)Objection (49)Special Inspection (21)
09/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/06/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/05/2026
Permit issued — Structural
B01340542-S2-ST
08/05/2026
Permit issued — Construction Fence
B01340542-S6-FN
08/05/2026
Permit issued — Foundation
B01340542-S1-FO
08/04/2026
Permit issued — Support of Excavation
B01340542-S5-SE
07/29/2026
Permit issued — General Construction
B01340542-I1-GC
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2026
Objection resolved — Resolved
07/09/2026
Objection raised — Scope
07/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/05/2026
Filed — Alteration CO
PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S6
07/02/2026
Filed — Alteration CO
PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S3
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Objection resolved — Addressed
06/06/2026
Objection raised — Other
06/01/2026
Filed — Alteration CO
PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S5
05/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/31/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NARESH MAHANGU
05/05/2026
Objection raised — Scope
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Scope
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Energy
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Admin
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Inspections
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Inspections
05/04/2026
Objection raised — Inspections
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Structural
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection resolved — Resolved
04/21/2026
Special inspection requirement — Sprinkler Systems
04/20/2026
Filed — Alteration CO
PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S2
04/20/2026
Filed — Alteration CO
PROPOSED FOUNDATION WORK FOR A (3) STORIES BUILDING FOR HORIZONTAL EXTENSION ON THE FIRST FLOOR ONLY, REINFORCED CONCRETE FOUNDATION CONSTRUCTION
B01340542-S1
04/11/2026
Objection resolved — Addressed
04/11/2026
Objection resolved — Addressed
04/11/2026
Objection resolved — Addressed
04/11/2026
Objection resolved — Addressed
04/11/2026
Objection resolved — Addressed
03/09/2026
Permit issued — Plumbing
B01334485-S1-PL
03/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/05/2026
Special inspection requirement — Fenestration areas
JIE ZHU
02/05/2026
Special inspection requirement — Interior lighting power
JIE ZHU
02/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIE ZHU
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIE ZHU
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
02/03/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Other
01/30/2026
Objection raised — Fire_Protection
Latest 60 of 114 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OI CHUN LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/24/2025$2.0M—Private party → OI CHUN LLC$675/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC707/05/2026
HTX BUILDING CONSULTING INC306/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor608/06/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244406/01/2026
JX FLAME SOLUTION INC7286301/28/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJABBIE INDUSTRIES INCORP*08/05/2026
DOB NOWConstruction FencePermit IssuedJABBIE INDUSTRIES INCORP*08/05/2026
DOB NOWFoundationPermit IssuedJABBIE INDUSTRIES INCORP*08/05/2026
DOB NOWSupport of ExcavationPermit IssuedJABBIE INDUSTRIES INCORP*08/04/2026
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*07/29/2026
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC03/09/2026
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*01/14/2026
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/06/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/02/2026Fire-Resistant Penetrations and Joints—special
05/31/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/31/2026Excavations - Sheeting, Shoring, and BracingNARESH MAHANGUspecial
04/21/2026Sprinkler Systems—special
02/05/2026Fenestration areasJIE ZHUenergy_progress
02/05/2026Interior lighting powerJIE ZHUenergy_progress
02/05/2026Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
02/05/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
02/05/2026Fire-Resistance Rated ConstructionJIE ZHUprogress
02/05/2026Energy Code Compliance InspectionsJIE ZHUprogress
01/29/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
01/29/2026HVAC-R and service water heating system controlsJIE ZHUenergy_progress
01/29/2026HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
01/29/2026HVAC-R and service water heating equipmentJIE ZHUenergy_progress
01/29/2026Energy Code Compliance InspectionsJIE ZHUprogress
01/22/2026Interior lighting powerJIE ZHUenergy_progress
01/22/2026Fenestration areasJIE ZHUenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
01/22/2026Energy Code Compliance InspectionsJIE ZHUprogress
01/22/2026Fire-Resistance Rated ConstructionJIE ZHUprogress
01/22/2026Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/18/2026B01334485-S1Request digital key ↗
08/18/2026B01334485-P4Request digital key ↗
08/18/2026B01334485-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B01340542-I1Open ↗
08/13/2026B01340542-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01340542-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01340542-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/18/2026B01334485-S1Open ↗
08/18/2026B01334485-I1Open ↗
08/18/2026B01334485-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B01334485-S1Open ↗
08/26/2026B01334485-S1Open ↗
08/25/2026B01334485-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B01334485-S1Open ↗
08/25/2026B01334485-P1Open ↗
08/24/2026B01340542-S5Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/17/2026B01340542-I1Open ↗
08/13/2026B01340542-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01340542-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01340542-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/18/2026B01334485-S1Open ↗
08/18/2026B01334485-P3Open ↗
08/18/2026B01334485-P2Open ↗
Showing 3 of 11 on file for this type
▸Other Documents7
▸DOB NOWPlot Diagram3
08/17/2026B01340542-S1Open ↗
08/14/2026B01340542-S5Open ↗
08/13/2026B01340542-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026B01340542-S5Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B01340542-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01340542-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01340542-I1Open ↗