Roof3p · 1 filing · 20 docs
ArchitectureGeneralPlumbingStructural
INSTALLATION OF SIDEWALK SHED AND ROOF/OVERHEAD PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
34 documents · 3 drawing sheets
Floor 164p · 2 filings · 9 docs
ArchitectureFire ProtectionGeneralOther
Sprinkler modifications to the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
General construction to the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
6 documents · 3 drawing sheets
Floor 15
Floor 1412p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Mechanical modifications to the 11th and 14th floor as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
8 documents
General construction modifications to the 11th and 14th Floor as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
5 documents · 2 drawing sheets
General construction modifications to the 11th and 14th floors as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12
Floor 1111p · 4 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Mechanical modifications to the 11th and 14th floor as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
8 documents
General construction modifications to the 11th and 14th Floor as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
5 documents · 2 drawing sheets
General construction modifications to the 11th and 14th floors as per the plans filed herewith. No change in use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 10Under Construction18p · 2 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
General construction to floor 10 as per plans field herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Sprinkler modifications to floors 9 and 10 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
21 documents · 8 drawing sheets
Floor 9Under Construction12p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications to floors 9 and 10 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
21 documents · 7 drawing sheets
Floor 81p · 1 filing · 12 docs
Fire Protection
Alterations to sprinklers on 8th floor as per plans filed herewith. No changes to occupancy, use, or egress.
On file for this job
12 documents · 1 drawing sheet
Floor 739p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Mechanical modifications to the 7th floor as per plans filed herewith. No change to use, occupancy, or egress.
On file for this job
12 documents · 4 drawing sheets
Plumbing modifications to the 6th & 7th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Plumbing modifications to the 7th floor as per plans filed herewith. No change is use, occupancy or egress.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 617p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Standpipe
General construction to the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
7 documents · 1 drawing sheet
Mechanical alterations to the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
7 documents · 5 drawing sheets
Plumbing alterations to the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5
Floor 4Under Construction71p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Standpipe modifications to floors 3-4 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
32 documents · 16 drawing sheets
General construction to the 4th floor as per plans filed herewith, No change in use, egress, or occupancy.
On file for this job
4 documents · 1 drawing sheet
Plumbing modifications to the 4th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
2 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3Under Construction50p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Standpipe modifications to floors 3-4 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
32 documents · 11 drawing sheets
Sprinkler modifications to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
14 documents · 3 drawing sheets
Floor 23p · 2 filings · 20 docs
Fire ProtectionGeneral
General construction to the first floor as per plans files herewith. No change in use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
General Sprinkler modifications taking place on the 2nd floor as filed per plans herewith. No change in use, egress, or occupancy.
On file for this job
12 documents · 2 drawing sheets
Floor 167p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications to Suite 110 as per plans filed herewith, No change in use, egress, or occupancy.
On file for this job
8 documents · 2 drawing sheets
General Construction Modification of 1st floor as per plans filed herewith. No change in egress, use, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Mechanical modifications to Suite 110 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine24p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Sprinkler modifications to Suite 110 as per plans filed herewith, No change in use, egress, or occupancy.
On file for this job
8 documents · 1 drawing sheet
Mechanical modifications taking place on 1st floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
10 documents
Modification to existing plumbing system on 1st floor as per plans filed herewith. No change in egress, use, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Basement6p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
General construction to the basement as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
Plumbing modifications to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Sprinkler alterations to the basement as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.