← Back
Two stories - detached, small or mid-size
501 AVENUE T
BROOKLYN · BIN 3253978
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2XZoning
3,720 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,000 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction7p · 1 filing · 20 docs
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDERS JOSEPH AND SONS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOHN ARCHITECTURE AND DESIGN1106/29/2026
HAYYAN DESIGN306/27/2024
LEVIN ENGINEERING PLLC103/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS JOSEPH AND SONSGeneral Contractor1207/31/2026
FIVE BOROUGH NYC LLCFire Protection207/08/2026
GREGG NY PLUMBING, INCPlumbing207/14/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC4161406/29/2026
Building Lifecycle
All (149)Filed (15)Permit Issued (14)Signed Off (3)Violation (6)Inspection (9)Objection (72)Special Inspection (30)
07/30/2026
Permit issued — General Construction
B00992234-I1-GC
07/30/2026
Objection resolved — Addressed
07/30/2026
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
07/30/2026
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
07/30/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
07/30/2026
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
07/30/2026
Special inspection requirement — Interior lighting power
ELIAS RASABI
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
07/30/2026
Special inspection requirement — Metering
ELIAS RASABI
07/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
ELIAS RASABI
07/30/2026
Special inspection requirement — Air barrier — testing
ELIAS RASABI
07/30/2026
Special inspection requirement — Permanent certificate
ELIAS RASABI
07/30/2026
Special inspection requirement — Fenestration areas
ELIAS RASABI
07/30/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
07/30/2026
Special inspection requirement — Protection of exposed foundation insulation
ELIAS RASABI
07/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
07/30/2026
Special inspection requirement — Masonry
ELIAS RASABI
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
07/30/2026
Special inspection requirement — Lowest Floor Elevation
ELIAS RASABI
07/30/2026
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
07/30/2026
Special inspection requirement — Preliminary
ELIAS RASABI
07/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
07/29/2026
Objection raised — Zoning
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection raised — Cost
07/29/2026
Objection resolved — Addressed
07/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Objection raised — Zoning
07/13/2026
Permit issued — Plumbing
B00992234-S2-PL
07/06/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Zoning
06/29/2026
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P8
06/25/2026
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
06/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/25/2026
Special inspection requirement — Lowest Floor Elevation
ELIAS RASABI
06/25/2026
Special inspection requirement — Masonry
ELIAS RASABI
06/25/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
06/25/2026
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
06/25/2026
Special inspection requirement — Preliminary
ELIAS RASABI
06/02/2026
Permit issued — Construction Fence
B01015184-I1-FN
05/19/2026
Permit issued — Sprinklers
B00992234-S1-EW-SP
02/13/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Energy
02/05/2026
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P7
02/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/16/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
01/06/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
12/11/2025
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P6
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P5
10/24/2025
Objection resolved — Addressed
09/29/2025
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P4
09/29/2025
Objection raised — Energy
09/11/2025
Filed — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-P3
07/22/2025
Signed off — Alteration CO
Filing mechanical application for 1 family home at 501 Avenue T
B00992234-S4
07/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDERS JOSEPH AND SONS07/30/2026
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC07/13/2026
DOB NOWConstruction FencePermit IssuedBUILDERS JOSEPH AND SONS06/02/2026
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC05/19/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDERS JOSEPH AND SONS06/25/2025
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC05/23/2025
DOB NOWMechanical SystemsPermit IssuedBUILDERS JOSEPH AND SONS05/23/2025
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC05/15/2025
DOB NOWConstruction FencePermit IssuedBUILDERS JOSEPH AND SONS05/12/2025
DOB NOWSupport of ExcavationSigned-offBUILDERS JOSEPH AND SONS08/13/2024
DOB NOWFoundationSigned-offBUILDERS JOSEPH AND SONS07/25/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDERS JOSEPH AND SONS07/25/2024
DOB NOWStructuralSigned-offBUILDERS JOSEPH AND SONS07/25/2024
DOB NOWConstruction FencePermit IssuedBUILDERS JOSEPH AND SONS06/11/2024
1 project · most recent 06/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Permit IssuedBUILDERS JOSEPH AND SONSHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ48TAVJUA 4 tons · Vrf Outdoor ×5
RXTQ36TAVJ9A 3 tons · Vrf Outdoor ×1
RXTQ60TAVJUA 5 tons · Vrf Outdoor ×1
1 project · most recent 06/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Permit IssuedGREGG NY PLUMBING, INCGas, Storm, Water/Sanitary
1 project · most recent 12/01/2025
FiledStatusContractorScope
12/01/2025Permit IssuedASCUATECH ELECTRICAL CORP1 meters, 1 new_meters
1 project · most recent 06/29/2026
Steel
FiledStatusContractorScope
06/29/2026Permit IssuedBUILDERS JOSEPH AND SONSSteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026Pass-Final PL - UndergroundPassView ↗
01/16/2026Fail-Final PL - UndergroundFailView ↗
01/06/2026Fail-Final PL - UndergroundFailView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
07/30/2026Subgrade InspectionsELIAS RASABIspecial
07/30/2026Protection of exposed foundation insulationELIAS RASABIenergy_progress
07/30/2026Permanent certificateELIAS RASABIenergy_progress
07/30/2026Air barrier - visual inspectionELIAS RASABIenergy_progress
07/30/2026Fenestration areasELIAS RASABIenergy_progress
07/30/2026Interior lighting powerELIAS RASABIenergy_progress
07/30/2026Maintenance informationELIAS RASABIenergy_progress
07/30/2026MeteringELIAS RASABIenergy_progress
07/30/2026Electric vehicle service equipment requirementsELIAS RASABIenergy_progress
07/30/2026Air barrier — testing ELIAS RASABIenergy_progress
07/30/2026Fenestration air leakageELIAS RASABIenergy_progress
07/30/2026Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
07/30/2026Insulation placement and R valuesELIAS RASABIenergy_progress
07/30/2026PreliminaryELIAS RASABIprogress
07/30/2026Energy Code Compliance InspectionsELIAS RASABIprogress
07/30/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
07/30/2026Lowest Floor ElevationELIAS RASABIprogress
07/30/2026Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
07/30/2026MasonryELIAS RASABIspecial
07/30/2026Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
07/30/2026Concrete - Cast-In-PlaceELIAS RASABIspecial
06/25/2026Concrete - Cast-In-PlaceELIAS RASABIspecial
06/25/2026Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
06/25/2026Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
06/25/2026MasonryELIAS RASABIspecial
Latest 25 of 91.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026B01015184-I1Request digital key ↗
08/18/2026B00992234-P6Request digital key ↗
08/18/2026B00992234-P5Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/08/2024340912533Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/08/2024340912533Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00992234-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026B00992234-I1Open ↗
09/23/2026B00992234-I1Open ↗
09/23/2026B00992234-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/24/2026B01015184-I1Open ↗
08/18/2026B00992234-P8Open ↗
08/18/2026B00992234-P7Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B00992234-I1Open ↗
09/23/2026B00992234-I1Open ↗
09/02/2026B00992234-S4Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/08/2024340912533Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/08/2024340912533Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/17/2024340912533Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/17/2024340912533Open ↗
▸BISSTREET TREE CHECKLIST1
08/08/2024340912533Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B00992234-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/18/2026B00992234-S1Open ↗
08/18/2026B00992234-P6Open ↗
08/18/2026B00992234-P5Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/18/2026B00992234-S6Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/08/2024340912533Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION3
09/25/2024340912533Open ↗
09/17/2024340912533Open ↗
09/17/2024340912533Open ↗
▸DOB NOWSite Survey: Initial3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWPlot Diagram3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026B00992234-P8Open ↗
08/15/2026B00992234-I1Open ↗
08/14/2026B00992234-P2Open ↗
▸DOB NOWAdjoining Owners Notification2
08/18/2026B00992234-S6Open ↗
08/15/2026B00992234-S7Open ↗