← Back
MANHATTAN
451 Tenth Avenue Leasehold Condominium
501 WEST 35 STREET · Chelsea-Hudson Yards · BIN 1091604
💬 Discuss this project
—Year Built
—Stories
—Building Class
C6-4Zoning
—Gross Floor Area
—Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
11,540 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 5 filings · 14 docs
Floor 452 filings · 11 docs
Floor 441p · 2 filings · 12 docs
Floor 435p · 1 filing · 12 docs
Floor 421p · 2 filings
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 341 filing
Floor 331p · 1 filing
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 181p · 2 filings
Floor 17
Floor 16
Floor 15
Floor 141 filing · 8 docs
Floor 1310p · 3 filings · 20 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Under Construction2p · 3 filings · 3 docs
Floor 61p · 2 filings
Floor 5Under Construction7p · 4 filings · 3 docs
Floor 4
Floor 36p · 3 filings · 12 docs
Floor 29p · 9 filings · 20 docs
Floor 18p · 13 filings · 20 docs
Cellar11p · 7 filings · 2 docs
Site & exteriorUnder Construction5 filings · 20 docs
Filed — no permit issued6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
451 TENTH AVENUE18608/21/2026
RELATED907/08/2026
PENSKE TRUCK LEASING203/21/2026
WHITESTONE103/22/2026
JTG103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC4603/21/2026
RELATED COMPANIES2903/21/2026
KUSHNER STUDIOS703/21/2026
NY EXPEDITERS203/21/2026
BURNHAM NATIONWIDE INC1003/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL403/21/2026
PONDOSA DESIGN INC203/21/2026
HM LOKE CONSULTING ENGINEERING PC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATFORM SOLUTIONS, INCGeneral Contractor2507/08/2026
NEPTUNE MECHANICAL INCFire Protection1407/08/2026
RELATED CONSTRUCTION LLCGeneral Contractor607/08/2026
CONSTRUCTION MANAGEMENT &General Contractor607/08/2026
NODECA TECHNICAL SERVICESGeneral Contractor603/21/2026
NEW YORK CONSTRUCTION ASSGeneral Contractor607/08/2026
ROZ-A-LITE ELEC'L CONTG IElectrical303/22/2026
TA MECHANICAL GROUP INCGeneral Contractor303/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
FULL CAPACITY FIRE CORPFire Protection207/08/2026
HUDSON YARDS CONST II LLCGeneral Contractor208/21/2026
JEM CONTRACTING CORPGeneral Contractor107/08/2026
ACTION CHUTES INCGeneral Contractor107/08/2026
ASHLAR MECHANICAL CORPFire Protection107/08/2026
TEAM ELECTRIC, INCElectrical103/22/2026
MER ELECTRIC, INCElectrical103/22/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor107/08/2026
A&A PLUMBING CORPPlumbing107/08/2026
BROOK PLUMBING & HTG CORPPlumbing107/08/2026
JAMES LINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983208/10/2026
DOMANI INSPECTION SERVICE843610/06/2023
INTEGRITY CONSULTING SERV666409/19/2023
PONDOSA DESIGN INC.5126108/07/2023
SPECIAL TESTING & CONSULT1688504/24/2023
KENDALL ENGINEERING PC4154706/01/2022
MCALPINE ARCHITECTURE PC5694105/24/2022
RYAN SPECIAL ENGINEERING2018304/27/2022
Building Lifecycle
All (300)Filed (69)Permit Issued (47)Signed Off (30)Violation (35)Inspection (17)Objection (72)Special Inspection (30)
08/20/2026
Permit issued — Structural
M01438975-S1-ST
08/19/2026
Permit issued — General Construction
M01438975-I1-GC
08/10/2026
Filed — Alteration
INSTALLATION OF ATTACHEMENTS FOR EXPANSION/SEISMIC JOINT SYSTEM AND INSTALLATION OF EXTERIOR METAL RAIN SCREEN SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01438975-S1
08/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/05/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/05/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/05/2026
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
08/05/2026
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
08/03/2026
Filed — Alteration
INSTALLATION OF ATTACHEMENTS FOR EXPANSION/SEISMIC JOINT SYSTEM AND INSTALLATION OF EXTERIOR METAL RAIN SCREEN SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01438975-I1
07/30/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/30/2026
Special inspection requirement — Preliminary
ALEXIS SCHLESSINGERMAN
05/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING NB CONSTRUCTION ON THE ADJACENT PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01359904-I1
05/15/2026
Permit issued — Protection and Mechanical Methods
M01359904-I1-PMM
04/23/2025
Permit issued — Suspended Scaffold
M01212860-I1-SC
04/18/2025
Filed — Alteration
WINDOW INSPECTION VIA INDUSTRIAL ROPE ACCESS
M01212860-I1
03/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2025
Violation issued (HPD, closed)
C
02/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/15/2025
Signed off — Alteration
Filing herewith application for interior renovations as per plans submitted.
M00916122-S1
01/09/2025
Violation issued (ECB, open)
Unknown
12/17/2024
Signed off — Alteration
Filing herewith application for interior renovations as per plans submitted.
M00916122-I1
12/13/2024
Signed off — Alteration
Filing herewith application for Sprinkler modifications as per plans submitted.
M00916174-I1
12/12/2024
Signed off — Alteration
Filing herewith application for interior renovations as per plans submitted.
M00916122-S2
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/04/2024
Permit issued — Sprinklers
M00916174-I1-EW-SP
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2024
Permit issued — Mechanical Systems
M00916122-S1-MS
08/15/2024
Permit issued — General Construction
M00916122-I1-GC
05/01/2024
Signed off — Alteration
M01023600-I1
04/18/2024
Signed off — Alteration
ADDITION OF A NEW 6-TON WATER COOLED VRF WITH TWO DUCTLESS AIR HANDLING UNITS AND ASSOCIATED CONDENSER WATER AND REFRIGERANT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00943650-I1
04/03/2024
Permit issued — Suspended Scaffold
M01023600-I1-SC
03/21/2024
Filed — Alteration
M01023600-I1
03/15/2024
Special inspection requirement — Public Assembly Emergency Lighting
SEBASTIAN SETTEDUCATE JR., P.E
02/20/2024
Objection resolved — Addressed
02/14/2024
Objection raised — Other
02/05/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Other
01/17/2024
Filed — No Work
M00645173-P3
12/04/2023
Special inspection requirement — Public Assembly Emergency Lighting
SEBASTIAN SETTEDUCATE JR., P.E
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/06/2023
Objection raised — Other
11/06/2023
Objection raised — Other
10/31/2023
Filed — No Work
M00645209-P1
10/31/2023
Filed — No Work
M00645173-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHUDSON YARDS CONST II LLC08/20/2026
DOB NOWGeneral ConstructionPermit IssuedHUDSON YARDS CONST II LLC08/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedUNIVERSAL BUILD SUPP LLC05/15/2026
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP04/23/2025
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP10/04/2024
DOB NOWMechanical SystemsSigned-offNEW YORK CONSTRUCTION ASS08/15/2024
DOB NOWGeneral ConstructionSigned-offNEW YORK CONSTRUCTION ASS08/15/2024
DOB NOWSuspended ScaffoldSigned-offTWO-TONE CONTRACTING CORP04/03/2024
DOB NOWMechanical SystemsSigned-offTA MECHANICAL GROUP INC10/24/2023
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP10/10/2023
DOB NOWPlumbingSigned-offA&A PLUMBING CORP10/03/2023
DOB NOWGeneral ConstructionSigned-offNEW YORK CONSTRUCTION ASS09/29/2023
DOB NOWMechanical SystemsSigned-offNEW YORK CONSTRUCTION ASS09/28/2023
DOB NOWGeneral ConstructionSigned-offACTION CHUTES09/01/2023
DOB NOWMechanical SystemsSigned-offCONSTRUCTION MANAGEMENT &01/23/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/17/2023
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC09/15/2022
DOB NOWConstruction FenceSigned-offPLATFORM SOLUTIONS, INC09/15/2022
DOB NOWMechanical SystemsSigned-offNODECA TECHNICAL SERVICES06/08/2022
DOB NOWGeneral ConstructionSigned-offRELATED CONSTRUCTION LLC06/01/2022
DOB NOWGeneral ConstructionSigned-offRELATED CONSTRUCTION LLC05/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC05/13/2022
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP05/12/2022
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC04/13/2022
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC04/13/2022
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC04/12/2022
DOB NOWGeneral ConstructionSigned-offRELATED CONSTRUCTION LLC03/28/2022
DOB NOWBoiler EquipmentSigned-offRB HTG CONSULTING GROUP03/15/2022
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MANAGEMENT &02/15/2022
DOB NOWStructuralSigned-offCONSTRUCTION MANAGEMENT &02/15/2022
DOB NOWMechanical SystemsSigned-offCONSTRUCTION MANAGEMENT &01/14/2022
DOB NOWBoiler EquipmentSigned-offBROOK PLUMBING & HTG CORP01/13/2022
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/12/2022
DOB NOWMechanical SystemsSigned-offNODECA TECHNICAL SERVICES01/07/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC12/20/2021
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC12/08/2021
DOB NOWSupported ScaffoldSigned-offJEM CONTRACTING CORP11/15/2021
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC11/05/2021
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC09/16/2021
DOB NOWConstruction FenceSigned-offPLATFORM SOLUTIONS, INC09/16/2021
+ 60 more permits on file
1 project · most recent 04/27/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/27/2022——Air Conditioning Systems
Cooling
Filtrine SKH020B4-000X 16,743 BTU ×3
SKH015B4-000X 14,009 BTU ×2
SKH024C4-000X 20,822 BTU ×2
SKH030B4-000X 36,025 BTU · Wshp ×2
SKH042C4-000X 37,324 BTU ×1
1 project · most recent 04/19/2022
FiledStatusContractorScope
04/19/2022———
25 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026CompleteWISE ELECTRICAL SVCS INCGeneral Wiring
03/05/2025CompleteMER ELECTRIC, INCGeneral Wiring
08/01/2023CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
05/08/2023CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
03/13/2023CompleteROZ-A-LITE ELEC'L CONTG I2 meters, 2 new_meters
03/01/2023CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
01/11/2023CompleteTEAM ELECTRIC, INCGeneral Wiring
09/29/2022CancelledKNIGHT ELEC'L SERV. CORP.General Wiring
09/29/2022CancelledKNIGHT ELEC'L SERV. CORP.General Wiring
09/29/2022CancelledKNIGHT ELEC'L SERV. CORP.General Wiring
09/01/2022CompleteCORPORATE ELEC. GROUP INC—
07/21/2022CompleteSTAR-DELTA ELECTRIC, LLC—
07/07/2022CompleteROZ-A-LITE ELEC'L CONTG I1 meters, 1 new_meters
04/14/2022CompletePATRIOT ELECTRIC CORP—
04/14/2022CompletePATRIOT ELECTRIC CORPGeneral Wiring
1 project · most recent 08/10/2026
Steel
FiledStatusContractorScope
08/10/2026Permit IssuedHUDSON YARDS CONST II LLCSteel
1 project · most recent 04/18/2025
FiledStatusContractorScope
04/18/2025Permit IssuedTWO-TONE CONTRACTING CORP—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
03/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2022Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
05/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
08/05/2026Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
08/05/2026Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
08/05/2026Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
08/05/2026FinalALEXIS SCHLESSINGERMANprogress
08/05/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/05/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
07/30/2026PreliminaryALEXIS SCHLESSINGERMANprogress
07/30/2026Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
07/30/2026Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
07/30/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/30/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
07/30/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
07/30/2026Wall Panels, Curtain Walls, and VeneersALEXIS SCHLESSINGERMANspecial
07/30/2026FinalALEXIS SCHLESSINGERMANprogress
07/30/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
03/15/2024Public Assembly Emergency LightingSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/04/2023Public Assembly Emergency LightingSEBASTIAN SETTEDUCATE JR., P.Eprogress
10/20/2023Public Assembly Emergency LightingSEBASTIAN SETTEDUCATE JR., P.Eprogress
10/04/2023FinalJOHN MCMONAGLEprogress
10/04/2023Mechanical SystemsJOHN MCMONAGLEspecial
10/04/2023Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
09/05/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
08/15/2023Public Assembly Emergency LightingSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/08/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
08/08/2023Sprinkler SystemsALEKSANDR LEVINspecial
Latest 25 of 93.
▾Documents — 1,249 on file (BIS + DOB NOW)
▸Plans & Drawings80
▸DOB NOWPlans/Sketch47
09/03/2026M00587868-I1Request digital key ↗
09/03/2026M00587868-P1Request digital key ↗
09/03/2026M00603199-P2Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed10
08/31/2026M00399153-I1Request digital key ↗
08/31/2026M00399153-P9Request digital key ↗
08/31/2026M00399153-P7Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly9
09/03/2026M00645158-I1Request digital key ↗
09/03/2026M00645088-I1Request digital key ↗
09/01/2026M00730137-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/05/2026M00258737-I1Request digital key ↗
09/01/2026M00343791-P4Request digital key ↗
09/01/2026M00343791-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/05/2026M00261023-I1Request digital key ↗
09/03/2026M00399260-P2Request digital key ↗
09/03/2026M00399260-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/01/2026M00343791-I1Request digital key ↗
09/01/2026M00343791-P4Request digital key ↗
09/01/2026M00343791-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
09/05/2026M00211046-I1Request digital key ↗
▸Applications & Permits199
▸BISPLAN / WORK APPROVAL APPLICATION146
09/27/2024121205454Open ↗
09/24/2024121205454Open ↗
02/02/2024121205454Open ↗
Showing 3 of 146 on file for this type
▸BISWORK PERMIT APPLICATION47
08/09/2023121205454Open ↗
08/09/2023141019118Open ↗
Showing 2 of 47 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications223
▸DOB NOWDPL-1: Design Professional Seal & Signature74
09/05/2026M00211046-I1Open ↗
09/05/2026M00261023-I1Open ↗
09/03/2026M00399260-P2Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/24/2026M00916174-I1Open ↗
09/23/2026M00603199-I1Open ↗
09/23/2026M00603206-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/27/2026M00730137-I1Open ↗
09/23/2026M00603199-I1Open ↗
09/02/2026M00603206-S1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY22
12/12/2022141020384Open ↗
Showing 1 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
12/12/2022141020384Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment43
▸BISEQUIPMENT USE PERMITS30
09/15/2022121205454Open ↗
09/15/2022121205454Open ↗
09/15/2022121205454Open ↗
Showing 3 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING7
12/05/2022121205454Open ↗
11/16/2022121205454Open ↗
Showing 2 of 7 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/15/2022121205454Open ↗
09/12/2022121205454Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/21/2022121205454Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/03/2023121205454Open ↗
▸Safety & Tenant Protection72
▸DOB NOWHPD-1: Anti-Harassment Area Checklist59
09/03/2026M00399260-P1Open ↗
09/03/2026M00399260-P2Open ↗
09/03/2026M00399260-I1Open ↗
Showing 3 of 59 on file for this type
▸BISSTREET TREE CHECKLIST5
06/26/2023121205454Open ↗
Showing 1 of 5 on file for this type
▸BISANTI-HARASSMENT CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos93
▸DOB NOWOER: Notice to Proceed33
09/03/2026M00399260-P2Open ↗
09/03/2026M00399260-P1Open ↗
09/03/2026M00399260-I1Open ↗
Showing 3 of 33 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION24
04/18/2024141019118Open ↗
11/16/2023140998277Open ↗
08/07/2023140866141Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
09/03/2026M00399260-I1Open ↗
09/03/2026M00603199-I1Open ↗
09/02/2026M00603206-S1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISAS-BUILT ENERGY ANALYSIS6
10/31/2022121205454Open ↗
10/21/2022121205454Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/03/2026M00603199-I1Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/15/2023121205454Open ↗
Showing 1 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
10/21/2022121205454Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00603199-I1Open ↗
▸Inspections & Test Reports95
▸BISTECHNICAL REPORT: RESPONSIBILITY62
05/18/2023141003330Open ↗
04/17/2023140993637Open ↗
04/17/2023140979751Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/07/2022121205454Open ↗
▸Approvals, Objections & Sign-offs122
▸BISLETTERS - SUPPORTING DOCUMENTATION38
12/02/2022121205454Open ↗
09/07/2022121205454Open ↗
09/07/2022121205454Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
04/24/2024141019118Open ↗
11/16/2023140998277Open ↗
05/22/2023141003330Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE23
09/27/2024121205454Open ↗
09/24/2024121205454Open ↗
01/26/2024121205454Open ↗
Showing 3 of 23 on file for this type
▸BISFINAL14
04/19/2024141019118Open ↗
11/16/2023140998277Open ↗
05/18/2023141003330Open ↗
Showing 3 of 14 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSUPERSEDING LETTER4
08/09/2023121205454Open ↗
08/09/2023141019118Open ↗
Showing 2 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
11/17/2022121205454Open ↗
▸BISSWIMMING POOL: DOH APPROVAL1
11/17/2022121205454Open ↗
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT23
12/12/2022141020384Open ↗
Showing 1 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
04/23/2024141019118Open ↗
11/16/2023140998277Open ↗
05/18/2023141003330Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/09/2023121205454Open ↗
Showing 1 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
04/21/2023123908619Open ↗
Showing 1 of 3 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN VIOLATION 39130995X - AFFIDAVIT ATTACHED1
04/15/2025121205454Open ↗
▸Filing & Intake Forms134
▸BISADDITIONAL INFORMATION74
02/27/2024121205454Open ↗
02/27/2024121205454Open ↗
07/13/2023121205454Open ↗
Showing 3 of 74 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET25
12/12/2022141020384Open ↗
Showing 1 of 25 on file for this type
▸BISBOROUGH INTAKE FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEFILING COVER SHEET13
04/21/2023123908619Open ↗
Showing 1 of 13 on file for this type
▸Other Documents44
▸BISBPP - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWAlternate Plan 17
09/01/2026M00730137-P1Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWAlternate Plan 27
09/01/2026M00730137-P1Open ↗
Showing 1 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCHIMNEYS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHUTOFF DAMPERS1
10/21/2022121205454Open ↗