1908Year Built
5Stories
W1Building Class
R6BZoning
94,500 sfGross Floor Area
0Units
LL97 Covered22 Active Violations 0 unresolved · 22 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 40,066 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 94Under Construction34p · 2 filings · 20 docs
Floor 4P.S. 94Under Construction27p · 1 filing · 20 docs
Floor 3P.S. 94Under Construction25p · 1 filing · 20 docs
Floor 2P.S. 94Under Construction30p · 1 filing · 20 docs
Floor 1P.S. 94Under Construction25p · 1 filing · 20 docs
CellarP.S. 94Under Construction23p · 1 filing · 20 docs
BasementP.S. 94Under Construction5p · 1 filing · 20 docs
Sub-BasementP.S. 94Under Construction23p · 2 filings · 20 docs
Site & exteriorP.S. 94KUnder Construction19p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6910/04/2026
NYC Department of Education1103/22/2026
NYC Department of Design and Construction203/21/2026
Boedoe103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Keri Engineering209/24/2026
Rajnikant Doshi205/05/2025
NYMS Consulting301/15/2025
Eme Consulting Engineering Group108/23/2023
Jack L. Gordon Architects102/01/2023
Ame Services102/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ame Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Plumbing & Heatingspecialty_contractor2206/28/2026
Maric Plumbing & HeatingScaffold1406/28/2026
Ansu ConstructionGeneral Contractor603/21/2026
A & S ElectricElectrical403/21/2026
Pulsar ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317505/05/2025
JPC Logistics Dba JPCL EN351108/23/2023
Socotec Engineering4983102/07/2022
Building Lifecycle
All (138)Filed (10)Permit Issued (28)Signed Off (1)Violation (60)Objection (9)Special Inspection (30)
10/19/2026
Signed off — Alteration
Filing for excavation shoring on behalf of contractor
B00674453-I1
10/01/2026
Objection raised — Other
09/24/2026
Filed — Alteration
Install 49 floor mounted unit ventilators and 18 ceiling mounted unit ventilators. Provide 8 new roof mounted exhaust fans and replace 2 existing exhaust fans. Provide new exhaust duct work in original building. Provide new standalone DDC controls.
B00819818-S3
09/24/2026
Special inspection requirement — Post-installed Anchors
09/16/2026
Special inspection requirement — Sprinkler Systems
06/22/2026
Permit issued — Mechanical Systems
B00819818-I1-MS
06/22/2026
Permit issued — General Construction
B00819818-S1-GC
06/22/2026
Permit issued — Structural
B00819818-S2-ST
06/22/2026
Permit issued — Construction Fence
B01129076-I1-FN
06/22/2026
Permit issued — Supported Scaffold
B01158030-I1-SF
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
01/29/2026
Violation issued (FDNY_ORDER, closed)
01/29/2026
Violation issued (FDNY_ORDER, closed)
01/29/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
01/23/2026
Violation issued (FDNY_ORDER, closed)
07/23/2025
Permit issued — Mechanical Systems
B00819818-I1-MS
07/23/2025
Permit issued — Construction Fence
B01129076-I1-FN
07/23/2025
Permit issued — General Construction
B00819818-S1-GC
07/23/2025
Permit issued — Structural
B00819818-S2-ST
07/23/2025
Permit issued — Supported Scaffold
B01158030-I1-SF
07/07/2025
Violation issued (ECB, open)
Construction
07/07/2025
Violation issued (ECB, open)
Construction
07/07/2025
Violation issued (ECB, open)
Construction
06/18/2025
Violation issued (FDNY_ORDER, closed)
06/17/2025
Permit issued — Construction Fence
B01129076-I1-FN
06/16/2025
Permit issued — Mechanical Systems
B00819818-I1-MS
06/16/2025
Permit issued — Supported Scaffold
B01158030-I1-SF
06/16/2025
Permit issued — General Construction
B00819818-S1-GC
06/16/2025
Permit issued — Structural
B00819818-S2-ST
05/29/2025
Permit issued — Supported Scaffold
B01158030-I1-SF
05/29/2025
Permit issued — General Construction
B00819818-S1-GC
05/29/2025
Permit issued — Mechanical Systems
B00819818-I1-MS
05/29/2025
Permit issued — Structural
B00819818-S2-ST
05/28/2025
Permit issued — Construction Fence
B01129076-I1-FN
05/09/2025
Permit issued — General Construction
B00819818-S1-GC
05/08/2025
Permit issued — Structural
B00819818-S2-ST
05/08/2025
Permit issued — Mechanical Systems
B00819818-I1-MS
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Construction
05/06/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
05/06/2025
Special inspection requirement — Structural Steel - Welding
MIKHAIL ZEYGMAN
05/06/2025
Special inspection requirement — Structural Steel - Details
MIKHAIL ZEYGMAN
05/06/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MIKHAIL ZEYGMAN
05/05/2025
Filed — Alteration
Install 49 floor mounted unit ventilators and 18 ceiling mounted unit ventilators. Provide 8 new roof mounted exhaust fans and replace 2 existing exhaust fans. Provide new exhaust duct work in original building. Provide new standalone DDC controls.
B00819818-P1
04/25/2025
Permit issued — Sidewalk Shed
B01158029-I1-SH
04/21/2025
Permit issued — Supported Scaffold
B01158030-I1-SF
04/08/2025
Permit issued — Construction Fence
B01129076-I1-FN
04/03/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Other
01/15/2025
Filed — Alteration
B01129076-I1
01/15/2025
Filed — Alteration
B01158030-I1
01/15/2025
Filed — Alteration
K094, INSTALLATION OF +/- 284 LINEAR FEET OF SIDEWALK SHED IN CONJUNCTION WITH DOB # B00819818, B01129076, B01158030 ON CONTRACTOR'S BEHALF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01158029-I1
12/23/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMaric Plumbing & Heating06/22/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Plumbing & Heating06/22/2026
DOB NOWStructuralPermit IssuedMaric Plumbing & Heating06/22/2026
DOB NOWConstruction FencePermit IssuedMaric Plumbing & Heating06/22/2026
DOB NOWSupported ScaffoldPermit IssuedMaric Plumbing & Heating06/22/2026
DOB NOWMechanical SystemsPermit IssuedMaric Plumbing & Heating07/23/2025
DOB NOWConstruction FencePermit IssuedMaric Plumbing & Heating07/23/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Plumbing & Heating07/23/2025
DOB NOWStructuralPermit IssuedMaric Plumbing & Heating07/23/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Plumbing & Heating07/23/2025
DOB NOWConstruction FencePermit IssuedMaric Plumbing & Heating06/17/2025
DOB NOWMechanical SystemsPermit IssuedMaric Plumbing & Heating06/16/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Plumbing & Heating06/16/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Plumbing & Heating06/16/2025
DOB NOWStructuralPermit IssuedMaric Plumbing & Heating06/16/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Plumbing & Heating05/29/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Plumbing & Heating05/29/2025
DOB NOWMechanical SystemsPermit IssuedMaric Plumbing & Heating05/29/2025
DOB NOWStructuralPermit IssuedMaric Plumbing & Heating05/29/2025
DOB NOWConstruction FencePermit IssuedMaric Plumbing & Heating05/28/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Plumbing & Heating05/09/2025
DOB NOWStructuralPermit IssuedMaric Plumbing & Heating05/08/2025
DOB NOWMechanical SystemsPermit IssuedMaric Plumbing & Heating05/08/2025
DOB NOWSidewalk ShedPermit IssuedMaric Plumbing & Heating04/25/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Plumbing & Heating04/21/2025
DOB NOWConstruction FencePermit IssuedMaric Plumbing & Heating04/08/2025
DOB NOWSupport of ExcavationSigned-offAnsu Construction08/02/2023
DOB NOWSupport of ExcavationSigned-offAnsu Construction04/11/2022
BISOTISSUEDAnsu Construction09/30/2025
BISOTISSUEDAnsu Construction08/05/2024
BISOTISSUEDAnsu Construction08/02/2023
BISEQISSUEDAnsu Construction11/18/2022
BISOTISSUEDAnsu Construction07/28/2022
BISPLISSUEDForsythe P&H06/28/2022
BISEQISSUEDTriangle Enterprise NYC I11/19/2021
BISEQISSUEDTriangle Enterprise NYC I11/19/2021
BISEQISSUEDAnsu Construction11/17/2021
BISOTISSUEDAnsu Construction08/09/2021
BISPLISSUEDForsythe P&H06/23/2021
BISEQISSUEDAnsu Construction11/27/2020
+ 38 more permits on file
2 projects · most recent 09/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026Permit IssuedMaric Plumbing & HeatingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane PUZ-A12NKA7 12,000 BTU · Heat Pump Outdoor ×4
Ventilation
Daikin UAVV9V07 750 CFM · Fan Coil Indoor ×184
UAHV9V07 750 CFM · Fan Coil Indoor ×76
DX16Q2GP 1,620 CFM · Exhaust Fan ×8
UAVV9V10 1,000 CFM · Fan Coil Indoor ×8
DX16Q1GP 1,960 CFM · Exhaust Fan ×4
Pennbarry DX13QGP 890 CFM · Exhaust Fan ×12
DX16Q1GP 2,290 CFM · Exhaust Fan ×8
DX10QGP 290 CFM · Exhaust Fan ×4
DX16Q2GP 2,370 CFM · Exhaust Fan ×4
08/23/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 34,000 BTU · Split System ×9
AOU120RLAVL 120,000 BTU · Condensing Unit ×3
1 project · most recent 09/24/2026
FiledStatusContractorScope
09/24/2026——4 heads
16 projects · most recent 05/07/2026
General Wiring Lighting
FiledStatusContractorScope
05/07/2026Permit IssuedCandela Systems Corp DbaLighting
12/02/2025CompleteAnco Electl ContctngGeneral Wiring
07/07/2025CompleteGemini Electric Co—
05/21/2025Permit IssuedSelectric Electrical Cont Co IGeneral Wiring
04/23/2025Permit IssuedSelectric Electrical Cont Co I—
06/22/2022Permit IssuedTri-Star ElectricGeneral Wiring
04/21/2022CompleteAlkem ElectricalGeneral Wiring
08/27/2021CompleteCharan Electrical Enterp's—
06/14/2021CompleteCharan Electrical Enterp's—
08/25/2020CompleteCharan Electrical Enterp's—
06/29/2020Permit IssuedStanco System Electrical Cont—
11/26/2019CompleteMulti-Tech ElectricGeneral Wiring
02/21/2019Permit IssuedPacific Electrical Contracting—
12/07/2018CompleteCharan Electrical Enterp's—
11/27/2018CompletePacific Electrical ContractingGeneral Wiring
2 projects · most recent 09/24/2026
Steel
FiledStatusContractorScope
09/24/2026Permit IssuedMaric Plumbing & HeatingSteel
02/07/2022Signed-offAnsu Construction1 scope_items
1 project · most recent 01/15/2025
Sidewalk Shed
FiledStatusContractorScope
01/15/2025Permit IssuedMaric Plumbing & HeatingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/24/2026Post-installed Anchors—special
09/16/2026Sprinkler Systems—special
05/06/2025FinalMIKHAIL ZEYGMANprogress
05/06/2025Structural Steel - WeldingMIKHAIL ZEYGMANspecial
05/06/2025Structural Steel - DetailsMIKHAIL ZEYGMANspecial
05/06/2025Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
12/23/2024FinalMIKHAIL ZEYGMANprogress
12/23/2024Structural Steel - DetailsMIKHAIL ZEYGMANspecial
12/23/2024Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
12/23/2024Structural Steel - WeldingMIKHAIL ZEYGMANspecial
08/23/2023Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/23/2023Post-installed AnchorsAsma Hashmispecial
08/22/2023Final—progress
08/22/2023Mechanical SystemsAsma Hashmispecial
03/14/2023Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
02/01/2023Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
01/31/2023Sprayed fire-resistant materialsMIKHAIL ZEYGMANspecial
01/31/2023Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
01/31/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
01/31/2023Mastic and Intumescent Fire-resistant CoatingsMIKHAIL ZEYGMANspecial
01/31/2023FinalMIKHAIL ZEYGMANprogress
01/30/2023Shutoff dampersMIKHAIL ZEYGMANenergy_progress
01/30/2023HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
01/30/2023HVAC-R and service water heating equipmentMIKHAIL ZEYGMANenergy_progress
01/30/2023Post-installed AnchorsMIKHAIL ZEYGMANspecial
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 94KEducation—
Project B00674453 Alteration · LOC Issued · 02/07/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00819818-P1Request digital key ↗
08/27/2026B00819818-I1Request digital key ↗
08/26/2026B00923349-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
12/05/2019340688009Open ↗
07/16/2019340688009Open ↗
06/03/2019340671277Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/10/2019340688009Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature13
10/04/2026B00819818-I1Open ↗
10/04/2026B00819818-I1Open ↗
10/04/2026B00819818-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/04/2026B00819818-I1Open ↗
10/04/2026B00819818-I1Open ↗
10/04/2026B00819818-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/05/2026B00819818-S3Open ↗
08/27/2026B00819818-S2Open ↗
08/27/2026B00819818-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/05/2019340688009Open ↗
07/16/2019340688009Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/03/2019340671277Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/03/2019340671277Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/03/2019340671277Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01158029-I1Open ↗
08/13/2026B01158030-I1Open ↗
08/13/2026B01129076-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/05/2019340688009Open ↗
07/16/2019340688009Open ↗
06/03/2019340671277Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/16/2019340688009Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/16/2019340688009Open ↗
06/03/2019340671277Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
10/05/2026B00819818-S3Open ↗
08/27/2026B00819818-P1Open ↗
08/14/2026B00819818-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
10/05/2026B00819818-S3Open ↗
08/27/2026B00819818-P1Open ↗
08/27/2026B00819818-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/14/2026B00819818-S1Open ↗
08/14/2026B00819818-S2Open ↗
08/13/2026B00674453-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/27/2026B00819818-I1Open ↗
08/14/2026B00819818-S1Open ↗
08/14/2026B00819818-S2Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
12/05/2019340688009Open ↗
06/03/2019340671277Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/05/2019340688009Open ↗
07/16/2019340688009Open ↗
06/03/2019340671277Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
07/16/2019340688009Open ↗
06/03/2019340671277Open ↗
▸BISADDITIONAL INFORMATION1
01/02/2020340688009Open ↗
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal9
10/05/2026B00819818-S3Open ↗
08/27/2026B00819818-P1Open ↗
08/14/2026B00819818-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01158029-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00674453-I1Open ↗