← Back
Elevator apt, semi-fireproof without stores
502 WEST 143 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1061863
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R7AZoning
22,980 sfGross Floor Area
24Units
Rent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 502 WEST 143 LLC · 4,996 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Floor 69p · 1 filing · 20 docs
Floor 59p · 1 filing · 20 docs
Floor 49p · 1 filing · 20 docs
Floor 39p · 1 filing · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar22p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAGNUM2107/08/2026
502 WEST 143603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLIAM F. RYAN, JR. P.E. PC711/22/2023
ATELIER NY ARCHITECTURE508/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE703/21/2026
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NATIONWIDE MECHANICAL INCPlumbing1007/08/2026
JUAN MOLINAElectrical203/21/2026
J&G HOME RENOVATIONS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018711/22/2023
ATELIER NY ARCHITECTURE2438102/12/2021
Building Lifecycle
All (138)Filed (12)Permit Issued (8)Signed Off (2)Violation (60)Inspection (4)Objection (26)Special Inspection (26)
03/05/2025
Violation issued (HPD, closed)
C
12/01/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/30/2023
Special inspection requirement — Maintenance information
William Ryan
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
11/30/2023
Special inspection requirement — Heating Systems
William Ryan
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
11/27/2023
Objection resolved — Addressed
11/22/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two (2) banks (Bank-A and Bank-B) made of four (4) modular units each.
M00603627-P2
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/22/2023
Special inspection requirement — Heating Systems
William Ryan
11/22/2023
Special inspection requirement — Maintenance information
William Ryan
11/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
11/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
11/21/2023
Objection raised — Scope
11/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
11/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
11/17/2023
Special inspection requirement — Maintenance information
William Ryan
11/17/2023
Special inspection requirement — Heating Systems
William Ryan
11/14/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two(2)banks (Bank-A and Bank-B) made of four (4) modular units each.
M00829517-P1
11/14/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two (2) banks (Bank-A and Bank-B) made of four (4) modular units each.
M00603627-P1
11/09/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/09/2023
Special inspection requirement — Maintenance information
William Ryan
11/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
11/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/09/2023
Special inspection requirement — Heating Systems
William Ryan
11/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
10/31/2023
Permit issued — Boiler Equipment
M00829517-I1-BE
03/22/2023
Objection raised — Energy
03/22/2023
Objection resolved — Addressed
02/16/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two(2)banks (Bank-A and Bank-B) made of four (4) modular units each.
M00829517-I1
02/13/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
01/31/2023
Objection raised — Accessibility
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/23/2023
Objection raised — Other
01/23/2023
Objection resolved — Addressed
01/23/2023
Objection raised — Scope
01/23/2023
Objection resolved — Addressed
01/23/2023
Objection raised — Energy
01/23/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Structural
01/22/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Fire_Protection
01/22/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Fire_Protection
01/22/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Mechanical
01/22/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Structural
01/22/2023
Objection resolved — Addressed
01/22/2023
Objection raised — Structural
01/22/2023
Objection resolved — Addressed
01/20/2023
Violation issued (ECB, closed)
Plumbing
01/16/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two (2) banks (Bank-A and Bank-B) made of four (4) modular units each.
M00603627-S1
01/16/2023
Filed — Alteration
Replacing existing Smith Cast Iron Boiler (model # 28A) with new Slant Fin modular boiler. New boiler shall be two (2) banks (Bank-A and Bank-B) made of four (4) modular units each.
M00603627-S2
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNATIONWIDE MECHANICAL INC10/31/2023
DOB NOWBoiler EquipmentSigned-offNATIONWIDE MECHANICAL INC01/19/2022
DOB NOWBoiler EquipmentSigned-offNATIONWIDE MECHANICAL INC10/20/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/19/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/19/2021
DOB NOWGeneral ConstructionPermit IssuedJ&G HOME RENOVATIONS LLC04/16/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC03/31/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC03/31/2021
BISOTISSUEDJ&G HOME RENOVATIONS LLC04/13/2021
4 projects · most recent 11/02/2022
General Wiring Boiler Controls
FiledStatusContractorScope
11/02/2022CompleteOM ELECTRIC, INCBoiler Controls
04/19/2021CompleteOM ELECTRIC, INCGeneral Wiring
04/19/2021CompleteOM ELECTRIC, INCGeneral Wiring
11/14/2019CompleteOM ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/01/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/09/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/13/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
12/12/2022Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/30/2023Maintenance informationWilliam Ryanenergy_progress
11/30/2023HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
11/30/2023HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
11/30/2023Heating SystemsWilliam Ryanspecial
11/30/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/30/2023HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
11/22/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/22/2023Heating SystemsWilliam Ryanspecial
11/22/2023Maintenance informationWilliam Ryanenergy_progress
11/22/2023HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
11/22/2023HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
11/17/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/17/2023HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
11/17/2023HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
11/17/2023Maintenance informationWilliam Ryanenergy_progress
11/17/2023Heating SystemsWilliam Ryanspecial
11/09/2023Maintenance informationWilliam Ryanenergy_progress
11/09/2023HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
11/09/2023HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
11/09/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/09/2023Heating SystemsWilliam Ryanspecial
11/09/2023HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
01/13/2023Heating SystemsWilliam Ryanspecial
01/13/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/13/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
Latest 25 of 26.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/28/2026M00603627-P2Request digital key ↗
08/28/2026M00603627-I1Request digital key ↗
08/28/2026M00603627-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00407675-I1Request digital key ↗
09/03/2026M00407697-I1Request digital key ↗
08/15/2026M00407675-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00464189-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
03/16/2021140974346Open ↗
03/09/2021140974346Open ↗
02/03/2021140974248Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
04/13/2021140974346Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026M00407697-I1Open ↗
09/03/2026M00407697-P1Open ↗
08/28/2026M00829517-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M00603627-I1Open ↗
09/23/2026M00829517-I1Open ↗
09/23/2026M00829517-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M00603627-I1Open ↗
09/23/2026M00829517-I1Open ↗
09/23/2026M00603627-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/03/2020140974346Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/03/2020140974346Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/04/2020140974248Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan4
08/13/2026M00407675-P1Open ↗
08/13/2026M00407697-P1Open ↗
08/13/2026M00407675-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00407697-P1Open ↗
09/03/2026M00407697-I1Open ↗
08/28/2026M00603627-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/16/2021140974346Open ↗
03/09/2021140974346Open ↗
11/04/2020140974248Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/16/2021140974346Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00603627-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/16/2021140974346Open ↗
03/09/2021140974346Open ↗
11/04/2020140974248Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/03/2020140974248Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/16/2021140974346Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/16/2021140974346Open ↗
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
11/03/2020140974346Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
03/16/2021140974346Open ↗
12/03/2020140974248Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/04/2020140974248Open ↗
11/03/2020140974346Open ↗
▸Other Documents4
▸DOB NOWHPD4: CONH Pilot Program4
08/13/2026M00829517-I1Open ↗
08/13/2026M00603627-S1Open ↗
08/13/2026M00603627-S2Open ↗
Showing 3 of 4 on file for this type