← Back
Four families
5022 9 AVENUE
BROOKLYN · BIN 3137840
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6Zoning
3,120 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · 2,659 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 1 filing · 12 docs
Floor 13p · 2 filings · 18 docs
Cellar2p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2023$2.3M—5022 9TH AVENUE LLC → Private party$724/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI607/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394307/31/2024
Building Lifecycle
All (34)Filed (6)Permit Issued (2)Signed Off (2)Violation (10)Inspection (5)Special Inspection (9)
06/05/2025
Violation issued (HPD, closed)
A
09/09/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00980689-I1
09/09/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00980691-I1
09/03/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/31/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00980691-P2
07/31/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00980689-P2
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00980691-P1
04/24/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00980689-P1
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
04/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/03/2024
Violation issued (HPD, closed)
A
03/05/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/27/2023
Permit issued — Plumbing
B00980691-I1-PL
12/27/2023
Permit issued — General Construction
B00980689-I1-GC
12/22/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B00980689-I1
12/22/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00980691-I1
11/21/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/27/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC12/27/2023
1 project · most recent 06/07/2024
General Wiring
FiledStatusContractorScope
06/07/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/03/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/02/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/02/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/02/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/31/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/31/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/31/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/24/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/24/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/24/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00980691-P1Request digital key ↗
08/26/2026B00980691-I1Request digital key ↗
08/26/2026B00980691-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00980691-P2Open ↗
08/26/2026B00980691-P1Open ↗
08/26/2026B00980691-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00980689-P1Open ↗
08/25/2026B00980689-I1Open ↗
08/22/2026B00980689-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00980689-P1Open ↗
08/25/2026B00980689-I1Open ↗
08/22/2026B00980689-P2Open ↗