← Back
Multi-story retail building (2+)
5024 7 AVENUE
BROOKLYN · BIN 3013365
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R7AZoning
3,430 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Multi-story retail building (2+) · 2,450 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF103/22/2026
OWNER OF 5024 7 AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC601/07/2025
KL INNOVATIVE DESIGN INC112/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
MODERN BUILDING CONSULTANT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor307/08/2026
SMVP MGMT INCGeneral Contractor107/08/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449501/07/2025
KL INNOVATIVE DESIGN INC7225112/23/2019
Building Lifecycle
All (53)Filed (7)Permit Issued (5)Signed Off (4)Violation (16)Inspection (2)Special Inspection (19)
02/27/2026
Signed off — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-S2
02/27/2026
Signed off — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-S1
02/27/2026
Signed off — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-I1
02/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/10/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/10/2025
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/10/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
01/07/2025
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-P2
01/07/2025
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-P3
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/27/2024
Permit issued — General Construction
B01088408-I1-GC
10/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2024
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-P1
08/15/2024
Permit issued — General Construction
B01088408-I1-GC
08/14/2024
Permit issued — Plumbing
B01088408-S1-PL
08/14/2024
Permit issued — Mechanical Systems
B01088408-S2-MS
08/09/2024
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-S2
08/09/2024
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-S1
08/09/2024
Filed — Alteration
Propose interior renovation at commercial space with new partition work and finish work as per plan. No change in use, egress, or occupancy.
B01088408-I1
08/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/30/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
07/30/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
01/06/2020
Signed off — Alteration
B00285042-I1
12/30/2019
Permit issued — Mechanical Systems
B00285042-I1-MS
12/23/2019
Filed — Alteration
B00285042-I1
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2019
Violation issued (ECB, closed)
Construction
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/08/2001
Violation issued (ECB, closed)
Boilers
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC12/27/2024
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC08/15/2024
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP08/14/2024
DOB NOWMechanical SystemsSigned-offJZ CONSTRUCTION GROUP INC08/14/2024
DOB NOWMechanical SystemsSigned-offSMVP MGMT INC12/30/2019
BIS—ISSUEDKING'S ASSOCIATES INC.05/22/2006
BISFPISSUEDIDEAL FIRE SYST INC04/21/2006
BISMHISSUEDKINGS ASSOCIATE INC11/04/2005
BISOTISSUEDKINGS ASSOC INC10/17/2005
BISOTISSUEDKIGS ASSOCIATE INC09/07/2005
BISEQISSUEDABLE CONSTRUCTION CO OF NY INC02/17/2004
BISOTISSUEDABLE CONSTRUCTION CO OF NY INC02/17/2004
BISBLISSUEDSEICKEL & SONS PLMB.INC.10/23/1995
BISPLISSUEDSEICKEL & SONS PLMB.INC.10/23/1995
1 project · most recent 12/28/2019
General Wiring
FiledStatusContractorScope
12/28/2019CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/10/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
01/10/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/10/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
01/10/2025Lighting in dwelling unitsMOHAMED MAHMOUDenergy_progress
01/10/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/10/2025FinalMOHAMED MAHMOUDprogress
01/06/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/06/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
08/08/2024Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
08/08/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
08/08/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
08/08/2024Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
08/08/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
08/08/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
08/08/2024Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
08/08/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
08/08/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/30/2024Mechanical SystemsMOHAMED MAHMOUDspecial
07/30/2024FinalMOHAMED MAHMOUDprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/23/2026B01088408-P3Request digital key ↗
08/23/2026B01088408-P2Request digital key ↗
08/23/2026B01088408-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00285042-I1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature13
09/28/2026B01088408-S2Open ↗
09/28/2026B01088408-S2Open ↗
09/28/2026B01088408-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B01088408-I1Open ↗
08/23/2026B01088408-P3Open ↗
08/23/2026B01088408-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026B01088408-S2Open ↗
09/28/2026B01088408-S2Open ↗
08/28/2026B01088408-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01088408-P3Open ↗
08/23/2026B01088408-P2Open ↗
08/23/2026B01088408-P1Open ↗
Showing 3 of 6 on file for this type