← Back
BuildNYC
Library
Hamilton Grange Branch Library
503 WEST 145TH STREET · BIN 1061938
💬 Discuss this project
1906Year Built
4Stories
P8Building Class
R7DZoning
15,000 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Library · Owner of record: New York Public Library · 5,995 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHamilton Grange Library5p · 2 filings · 15 docs
Floor 4Mechanical system upgrade and energy efficiency design1 filing · 9 docs
Floor 3Mechanical system upgrade and energy efficiency design1 filing · 9 docs
Floor 2Hamilton Grange Library6p · 2 filings · 15 docs
Floor 1Hamilton Grange Library6p · 2 filings · 15 docs
CellarGas connection refiling8p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction1909/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRW Engineers203/27/2026
LYNCH Eisinger Design Architects103/27/2026
Dominick R. Pilla Associates103/26/2026
DM Associates109/26/2024
New York & Company311/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Praxis Workshop203/21/2026
New York & Company603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Air Done RiteGeneral Contractor203/21/2026
CC Controlled Plumbing CoPlumbing207/08/2026
Commercial Electric ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Comply Building Group8622109/26/2024
New York Engineering Associates851105/26/2023
Building Lifecycle
All (59)Filed (8)Permit Issued (3)Signed Off (3)Violation (17)Inspection (2)Objection (5)Special Inspection (21)
04/09/2026
Objection raised — Other
04/09/2026
Objection raised — Other
04/08/2026
Objection raised — Other
04/01/2026
Objection raised — Scope
04/01/2026
Objection raised — Scope
03/27/2026
Filed — Alteration
Structural work related to mechanical upgrades, as per plans filed herewith. No change in use, egress or occupancy.
M01374992-S3
03/27/2026
Filed — Alteration
Structural work related to mechanical upgrades, as per plans filed herewith. No change in use, egress or occupancy.
M01374992-S1
03/26/2026
Filed — Alteration
Structural work related to mechanical upgrades, as per plans filed herewith. No change in use, egress or occupancy.
M01374992-I1
03/26/2026
Filed — Alteration
Structural work related to mechanical upgrades, as per plans filed herewith. No change in use, egress or occupancy.
M01374992-S2
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Post-installed Anchors
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Structural Steel - Welding
03/19/2026
Special inspection requirement — Structural Steel - Details
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Concrete - Cast-In-Place
03/19/2026
Special inspection requirement — Mechanical Systems
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2025
Violation issued (FDNY_NOV, closed)
05/19/2025
Signed off — Alteration
Alteration Application for the Mechanical work on the 1st, 2nd Floors and roof on an existing 4 story Public Building
M01059349-I1
03/18/2025
Permit issued — Mechanical Systems
M01059349-I1-MS
09/26/2024
Filed — Alteration
Alteration Application for the Mechanical work on the 1st, 2nd Floors and roof on an existing 4 story Public Building
M01059349-I1
05/30/2024
Signed off — Alteration
REFILING OF GAS CONNECTION ORIGINALLY FILED UNDER APPLICATION NO. 123278327 TO OBTAIN SIGN OFF.
M00873708-I1
05/30/2024
Signed off — Alteration
REFILING OF APPLICATION NUMBER 123278327 FOR REPLACEMENT BOILER AND GAS BURNER.
M00873568-I1
05/30/2024
Special inspection requirement — Final
ANA ACCETTA
05/30/2024
Special inspection requirement — Mechanical Systems
ANA ACCETTA
03/28/2024
Violation issued (FDNY_NOV, closed)
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/29/2023
Filed — Alteration
REFILING OF GAS CONNECTION ORIGINALLY FILED UNDER APPLICATION NO. 123278327 TO OBTAIN SIGN OFF.
M00873708-P1
10/27/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/27/2023
Permit issued — Boiler Equipment
M00873568-I1-BE
06/27/2023
Permit issued — Plumbing
M00873708-I1-PL
05/26/2023
Filed — Alteration
REFILING OF GAS CONNECTION ORIGINALLY FILED UNDER APPLICATION NO. 123278327 TO OBTAIN SIGN OFF.
M00873708-I1
05/26/2023
Filed — Alteration
REFILING OF APPLICATION NUMBER 123278327 FOR REPLACEMENT BOILER AND GAS BURNER.
M00873568-I1
05/11/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
05/11/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
05/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
05/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
05/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/23/2022
Violation issued (FDNY_NOV, closed)
08/16/2021
Violation issued (FDNY_NOV, closed)
10/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/20/2016
Violation issued (ECB, closed)
Boilers
07/20/2016
Violation issued (ECB, closed)
Construction
10/23/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2004
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
12/12/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2002
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
11/07/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAir Done Rite03/18/2025
DOB NOWBoiler EquipmentSigned-offCC Controlled Plumbing Co06/27/2023
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co06/27/2023
BISOTISSUEDC C Controlled Combustion01/08/2020
BISBLISSUEDCC Controlled Plumbing Co12/01/2017
BISPLISSUEDCC Controlled Plumbing Co11/01/2017
BISEQISSUEDPJP Installers10/26/2017
BISOTISSUEDAwl Industries09/22/2017
BISEQISSUEDPJP Installers07/12/2017
BISEQISSUEDPJP Installers08/29/2016
BISPLISSUEDPar Plumbing Co07/08/2011
BIS—ISSUEDGannon Contracting07/07/2011
BISEQISSUEDGannon Contracting07/06/2011
BISMHISSUEDS.a.hvac11/12/2003
BIS—ISSUEDDoul Construction11/06/2003
BISSPISSUEDArrow Plumbing Heat08/04/2003
BISOTISSUEDDoul Construction12/24/2002
BISOTISSUEDDoul Construction02/19/2002
BISEQISSUEDJTG & Sons Scaffolding Co11/29/1999
BISEQISSUEDL.A. Wenger Contracting Co10/15/1998
BISOTISSUEDL.A. Wenger Contracting Co10/15/1998
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026——Heating and Air Conditioning Systems, Others
Heat / Cool
Daikin RFK18BVJU9 18,000 BTU · Vrf Indoor ×2
RXYA408AATJA 407,500 BTU · Vrf Outdoor ×2
Other
Daikin DPSH18B 432,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 03/27/2026
Storm
FiledStatusContractorScope
03/27/2026——Storm
1 project · most recent 03/27/2026
Steel Concrete
FiledStatusContractorScope
03/27/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/23/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Final—progress
03/19/2026Post-installed Anchors—special
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Structural Steel - Welding—special
03/19/2026Structural Steel - Details—special
03/19/2026Final—progress
03/19/2026Concrete - Cast-In-Place—special
03/19/2026Mechanical Systems—special
03/19/2026Final—progress
03/19/2026Structural Steel - High Strength Bolting—special
03/19/2026Fire-Resistant Penetrations and Joints—special
05/30/2024FinalANA ACCETTAprogress
05/30/2024Mechanical SystemsANA ACCETTAspecial
12/01/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
10/27/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
05/11/2023Heating SystemsLOUIS ARENAspecial
05/11/2023Maintenance informationLOUIS ARENAenergy_progress
05/11/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
05/11/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
05/11/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hamilton Grange LibraryGovernment / CivicFloors 1, 2, Roof
Project M01059349 Alteration · LOC Issued · 09/26/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 222 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00873568-I1Request digital key ↗
08/28/2026M00873708-I1Request digital key ↗
08/28/2026M00873708-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION27
08/13/2024123278327Open ↗
04/06/2022123278327Open ↗
04/01/2022123278327Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION11
01/03/2020140882515Open ↗
12/01/2017123278327Open ↗
11/02/2017123278327Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M01059349-I1Open ↗
08/13/2026M00873568-I1Open ↗
08/13/2026M00873708-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/04/2011120571167Open ↗
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
06/22/2018122928332Open ↗
06/22/2018122928332Open ↗
06/22/2018122928332Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026M01059349-I1Open ↗
08/18/2026M01374992-S1Open ↗
08/18/2026M01374992-S3Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/03/2020140882515Open ↗
11/02/2017123278327Open ↗
12/13/2016140584179Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M00873568-I1Open ↗
08/27/2026M01059349-I1Open ↗
08/26/2026M00873708-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/03/2020140882515Open ↗
12/13/2016140584179Open ↗
08/26/2016140541340Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/03/2020140882515Open ↗
12/13/2016140584179Open ↗
08/26/2016140541340Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/24/2018123278327Open ↗
11/02/2017123278327Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00873568-I1Open ↗
08/27/2026M01059349-I1Open ↗
▸Trade Schedules & Equipment14
▸BISFA - FDNY APPROVAL : FD-FAA5
06/06/2017121494203Open ↗
02/04/2016121494203Open ↗
12/13/2012120568992Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/14/2020123278327Open ↗
11/02/2017123278327Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/14/2011120571167Open ↗
08/08/2011120571167Open ↗
▸BISEQUIPMENT USE PERMITS1
11/25/2011120571167Open ↗
▸BISSCHEDULE B - PLUMBING1
01/06/2011120571167Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/02/2017123278327Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/01/2022123278327Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/25/2011120571167Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
10/28/2016122928332Open ↗
▸BISSTREET TREE CHECKLIST1
01/06/2011120571167Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/03/2020140882515Open ↗
11/02/2017123278327Open ↗
06/06/2017121494203Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/05/2011120568992Open ↗
01/05/2011120568992Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026M01059349-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/22/2018122928332Open ↗
06/22/2018122928332Open ↗
11/02/2017123278327Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/21/2021140882515Open ↗
06/22/2018122928332Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/21/2021140882515Open ↗
01/03/2020140882515Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/03/2020140882515Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/17/2011120571167Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/21/2021140882515Open ↗
01/03/2020140882515Open ↗
06/29/2017140584179Open ↗
Showing 3 of 4 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
08/13/2019140541340Open ↗
08/13/2019140584179Open ↗
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY - USE8
07/02/2012120571167Open ↗
07/02/2012120571167Open ↗
02/14/2011120571167Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/18/2026M01374992-I1Open ↗
08/18/2026M01374992-S1Open ↗
08/18/2026M01374992-S2Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS APPROVAL7
01/03/2020140882515Open ↗
06/22/2018122928332Open ↗
12/20/2017123278327Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
10/21/2021140882515Open ↗
08/13/2019140541340Open ↗
08/13/2019140584179Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/17/2013121494203Open ↗
01/06/2011120571167Open ↗
01/05/2011120568992Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/19/2011120571167Open ↗
10/17/2011120571167Open ↗
▸BISLANDMARKS SIGNOFF1
10/21/2021140882515Open ↗
▸BISBSA-CPC APPROVAL1
04/26/2012120571167Open ↗
▸BISSHED LETTER1
10/30/2017140541340Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
10/21/2021140882515Open ↗
01/03/2020140882515Open ↗
06/22/2018122928332Open ↗
Showing 3 of 13 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
01/08/2020140882515Open ↗
07/11/2017140584179Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION7
04/06/2022123278327Open ↗
02/14/2020123278327Open ↗
02/16/2012120571167Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET7
11/02/2017123278327Open ↗
10/28/2016122928332Open ↗
01/06/2011120571167Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
08/13/2019140541340Open ↗
08/13/2019140584179Open ↗
06/22/2018122928332Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/03/2020140882515Open ↗
12/13/2016140584179Open ↗
08/26/2016140541340Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
08/26/2016140541340Open ↗
12/19/2012120568992Open ↗
07/08/2011120568992Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProof of Historic Building2
08/18/2026M01374992-I1Open ↗
08/13/2026M01059349-I1Open ↗
▸BISPlot Diagram1
01/06/2011120571167Open ↗
▸BISSupporting Document: Fee Deferment1
10/28/2016122928332Open ↗