← Back
BuildNYC
Miscellaneous two family
5030 KINGS HIGHWAY
BROOKLYN · Flatlands · BIN 3213527
💬 Discuss this project
1940Year Built
2Stories
B9Building Class
R4Zoning
2,520 sfGross Floor Area
2Units
Miscellaneous two family · 2,040 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on existing roof1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMM Design Studio103/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ebc Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Solar ProGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
World Design Architecture9323103/13/2025
Building Lifecycle
07/17/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01194197-I1
04/02/2025
Permit issued — Solar
B01194197-I1-SL
03/13/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01194197-I1
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSolar Pro04/02/2025
1 project · most recent 03/11/2025
FiledStatusContractorScope
03/11/2025CompleteFlow State Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/12/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/12/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
03/12/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
03/12/2025FinalRICHARD MUESCH JR.progress
03/12/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account