← Back
BuildNYC
Mansion type or town house
5031 GROSVENOR AVENUE
BRONX · BIN 2129280
💬 Discuss this project
2017Year Built
2.5Stories
A7Building Class
R1-2Zoning
12,166 sfGross Floor Area
1Units
Mansion type or town house · 25,359 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar20p · 1 filing · 20 docs
Site & exterior14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chapel Farm Estate1403/21/2026
Villanova Heights810/17/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Atoz Consulting Engineers310/16/2026
HC Engineering207/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HC Engineering203/21/2026
Hansroegele Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cabin Electrical ServicesElectrical103/21/2026
M&L RenovationGeneral Contractor104/09/2026
Code MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Beyond Arch3600510/16/2026
Building Lifecycle
10/16/2026
Filed — Alteration CO
To correct the final certificate of occupancy 200922537F along with the limited renovation on the cellar, the second floor, and the third floor.
X01245160-P4
10/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
10/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
10/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
08/20/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01245160-I1-GC
23 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCode Mechanical06/05/2026
DOB NOWGeneral ConstructionPermit IssuedM&L Renovation03/19/2026
BISPLISSUEDCode Mechanical01/17/2018
BISSPISSUEDRRP Plumbing01/05/2018
BISOTISSUEDOliwa Construction12/28/2017
BIS—ISSUEDOliwa Construction11/08/2017
BISPLISSUEDCode Mechanical09/28/2017
BIS—ISSUEDOliwa Construction09/26/2017
BISOTISSUEDOliwa Construction02/18/2016
BISOTISSUEDOliwa Construction01/22/2015
BIS—ISSUEDOliwa Construction01/22/2015
BISOTISSUEDOliwa Construction07/11/2014
BIS—ISSUEDOliwa Construction07/11/2014
BIS—ISSUEDOliwa Construction02/25/2013
BISOTISSUEDOliwa Construction06/29/2012
BIS—ISSUEDOliwa Construction06/20/2012
BISOTISSUEDOliwa Construction06/30/2011
BIS—ISSUEDOliwa Construction06/29/2011
BIS—ISSUEDOliwa Construction08/31/2010
BIS—ISSUEDOliwa Construction03/15/2010
BIS—ISSUEDJen Fu Construction06/18/2009
BISOTISSUEDNDL Assoicates07/01/2008
BIS—ISSUEDNDL Associates06/05/2007
BISOTISSUEDNDL Assoicates05/18/2007
BIS—ISSUEDNDL Associates05/31/2006
BIS—ISSUEDNDL Associates07/06/2005
BISOTISSUEDNDL Assoicates07/05/2005
BISOTISSUEDNDL Assoicates01/25/2005
1 project · most recent 10/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/16/2026Permit IssuedCode MechanicalGas, Water/Sanitary
1 project · most recent 07/17/2026
General Wiring
FiledStatusContractorScope
07/17/2026CompleteCabin Electrical ServicesGeneral Wiring
1 project · most recent 10/16/2026
FiledStatusContractorScope
10/16/2026Permit IssuedCode Mechanical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/12/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
10/12/2026Energy Code Compliance InspectionsHackjong Choiprogress
10/12/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
08/06/2026Interior lighting powerHackjong Choienergy_progress
08/06/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
08/06/2026Energy Code Compliance InspectionsHackjong Choiprogress
08/06/2026Fire-Resistance Rated ConstructionHackjong Choiprogress
07/11/2026Interior lighting powerHackjong Choienergy_progress
07/11/2026Fire-Resistance Rated ConstructionHackjong Choiprogress
07/11/2026Energy Code Compliance InspectionsHackjong Choiprogress
07/11/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account