← Back
BuildNYC
Two stories - detached, small or mid-size
505 RATHBUN AVENUE
STATEN ISLAND · BIN 5081239
💬 Discuss this project
1979Year Built
1Stories
A1Building Class
R3XZoning
2,990 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed photovoltaic power system installation2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering106/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor303/21/2026
Sunrun Solar ElectlElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841106/06/2025
Building Lifecycle
07/17/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01235669-I1
06/11/2025
Permit issued — Solar
S01235669-I1-SL
06/06/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01235669-I1
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
06/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS06/11/2025
BISOTISSUEDSunrun Installation Service09/02/2022
3 projects · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025CompleteNY Solar Electrical—
12/31/2024CompleteReliant Power SystemsGeneral Wiring
09/02/2022Permit IssuedSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/03/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/03/2025Energy Code Compliance InspectionsROBERT MASONEprogress
06/03/2025FinalROBERT MASONEprogress
06/03/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account