← Back
Three families
506 SHORE BOULEVARD
BROOKLYN · BIN 3245924
💬 Discuss this project
1965Year Built
2Stories
C0Building Class
R3-1Zoning
4,840 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 4,840 sf lot · 1 FAR built
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof5p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DELTAMER203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/13/2023$1.7M—— → —$351/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAKER ENGINEERING, P.C.1211/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BANJI ARCHITECT PC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELTAMER, INCGeneral Contractor1107/08/2026
MT ENERGY INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV6661111/25/2025
Building Lifecycle
All (87)Filed (12)Permit Issued (11)Signed Off (4)Violation (2)Inspection (6)Objection (22)Special Inspection (30)
05/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2026
Signed off — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-I1
04/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/05/2026
Signed off — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-S1
01/27/2026
Signed off — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-S3
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/24/2025
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
12/24/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
12/24/2025
Special inspection requirement — Final
ALEKSANDR LEVIN
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/24/2025
Special inspection requirement — Heating Systems
ALEKSANDR LEVIN
12/24/2025
Special inspection requirement — Smoke Control Systems Testing
ALEKSANDR LEVIN
12/09/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Other
12/08/2025
Objection raised — Other
11/25/2025
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P6
11/24/2025
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P7
11/07/2025
Special inspection requirement — Heating Systems
ALEKSANDR LEVIN
11/07/2025
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/07/2025
Special inspection requirement — Final
ALEKSANDR LEVIN
11/07/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
11/07/2025
Special inspection requirement — Smoke Control Systems Testing
ALEKSANDR LEVIN
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
09/22/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Plumbing
08/18/2025
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P5
08/11/2025
Signed off — Alteration
CONSTRUCTION FENCE APPLICATION.
B00913776-I1
08/05/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Zoning
07/16/2025
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P4
07/11/2025
Permit issued — General Construction
B00913780-I1-GC
07/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/11/2025
Special inspection requirement — Masonry
ALEKSANDR LEVIN
07/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/27/2025
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P3
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/20/2025
Permit issued — Plumbing
B00913780-S2-PL
12/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Permit issued — General Construction
B00913780-I1-GC
11/20/2024
Permit issued — Mechanical Systems
B00913780-S1-MS
11/20/2024
Permit issued — Structural
B00913780-S3-ST
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/01/2024
Violation issued (ECB, closed)
Unknown
11/01/2024
Violation issued (ECB, closed)
Construction
10/18/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Other
08/27/2024
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P2
08/15/2024
Objection raised — Admin
08/07/2024
Filed — Alteration
Partial demolition and structural work for interior renovation of an existing two story and cellar of a two family dwelling
B00913780-P1
08/07/2024
Permit issued — Construction Fence
B00913776-I1-FN
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
08/02/2024
Special inspection requirement — Masonry
ALEKSANDR LEVIN
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDELTAMER, INC07/11/2025
DOB NOWPlumbingSigned-offMT ENERGY INC06/20/2025
DOB NOWGeneral ConstructionSigned-offDELTAMER, INC11/20/2024
DOB NOWMechanical SystemsSigned-offDELTAMER, INC11/20/2024
DOB NOWStructuralSigned-offDELTAMER, INC11/20/2024
DOB NOWConstruction FenceSigned-offDELTAMER, INC08/07/2024
DOB NOWPlumbingSigned-offMT ENERGY INC01/23/2024
DOB NOWStructuralSigned-offDELTAMER, INC01/18/2024
DOB NOWMechanical SystemsSigned-offDELTAMER, INC12/07/2023
DOB NOWGeneral ConstructionSigned-offDELTAMER, INC12/07/2023
DOB NOWConstruction FenceSigned-offDELTAMER, INC08/07/2023
1 project · most recent 11/25/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2025Signed-offDELTAMER, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MLZ-KY06NA 13,200 BTU · Split System ×8
MXZ-4C36NA3 79,400 BTU · Heat Pump Outdoor ×4
MLZ-KP09NA2 21,000 BTU · Fan Coil Indoor ×2
MLZ-KP12NA2 30,000 BTU · Vrf Indoor ×2
MLZ-KP18NA2 38,000 BTU · Split System ×2
Ventilation
Panasonic FV-0511VKS2 110 CFM · Exhaust Fan ×18
1 project · most recent 11/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/25/2025Signed-offMT ENERGY INCGas, Water/Sanitary
2 projects · most recent 02/20/2026
General Wiring
FiledStatusContractorScope
02/20/2026CompleteCMY ELECTRICAL CORPGeneral Wiring
01/29/2024CompleteCMY ELECTRICAL CORP—
1 project · most recent 11/25/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
11/25/2025Signed-offDELTAMER, INCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
12/24/2025Mechanical SystemsALEKSANDR LEVINspecial
12/24/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
12/24/2025FinalALEKSANDR LEVINprogress
12/24/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
12/24/2025Heating SystemsALEKSANDR LEVINspecial
12/24/2025Smoke Control Systems TestingALEKSANDR LEVINspecial
11/07/2025Heating SystemsALEKSANDR LEVINspecial
11/07/2025Mechanical SystemsALEKSANDR LEVINspecial
11/07/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/07/2025FinalALEKSANDR LEVINprogress
11/07/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
11/07/2025Smoke Control Systems TestingALEKSANDR LEVINspecial
10/28/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
10/28/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/11/2025Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
07/11/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
07/11/2025MasonryALEKSANDR LEVINspecial
07/11/2025Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
07/11/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/25/2025Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/25/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/02/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/02/2024Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
08/02/2024MasonryALEKSANDR LEVINspecial
08/02/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
Latest 25 of 37.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00913776-I1Request digital key ↗
08/26/2026B00913780-P3Request digital key ↗
08/26/2026B00913780-P5Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00913780-P2Open ↗
08/26/2026B00913780-P3Open ↗
08/26/2026B00913780-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00913780-P7Open ↗
09/01/2026B00913780-P2Open ↗
08/29/2026B00913780-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00913780-P7Open ↗
09/01/2026B00913780-P2Open ↗
08/29/2026B00913780-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00913780-S3Open ↗
08/13/2026B00913780-I1Open ↗
08/13/2026B00913780-S1Open ↗
Showing 3 of 4 on file for this type