← Back
Over six families without stores
506 WEST 135 STREET
MANHATTAN · Manhattanville-West Harlem · BIN 1059771
💬 Discuss this project
1905Year Built
6Stories
C1Building Class
R7AZoning
19,056 sfGross Floor Area
24Units
Rent Stabilized385 Open Violations 383 unresolved · 2 paperwork only ▸
Over six families without stores · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 4,580 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Site & exterior10p · 2 filings · 7 docs
Filed — no permit issued69p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION DEVELOPME203/21/2026
CITY OF NEW YORK (NYCDDC)203/21/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERS LLC408/30/2024
ENGINEERING GROUP ASSOCIATES, PC111/13/2023
RKTB ARCHITECTS105/09/2023
ASR ENGINEERING PC101/25/2023
ASIF JAMIL, RA103/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
WILLIAM VITACCO ASSOCIATES1203/21/2026
LEOPARDTOGO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EASTERN GENERAL CONSTRUCTGeneral Contractor507/08/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803504/22/2024
Building Lifecycle
All (103)Filed (8)Permit Issued (4)Signed Off (2)Violation (60)Objection (12)Special Inspection (17)
09/26/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING FOR MINOR GUTTER & FACADE REPAIR. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
M08044804-I1
08/30/2024
Filed — Alteration
Full interior gut renovation, as well as some exterior work such as window replacement, repointing of bricks, egress stair installation, and roof repair. There will be no changes to the occupancy, egress, or use of the building.
M00845465-S1
04/22/2024
Filed — Alteration
M00848133-I1
04/19/2024
Filed — Alteration
Sprinkler work as per plans filed herewith. No change in use, egress or occpancy.
M00848056-I1
04/17/2024
Filed — Alteration
M00848030-I1
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
12/19/2023
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
11/16/2023
Objection raised — Scope
11/16/2023
Objection resolved — Addressed
11/13/2023
Filed — Alteration
Structural work filed as per plans herewith. No change in use, egress or occupancy.
M00845489-I1
09/07/2023
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/07/2023
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/07/2023
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/12/2023
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
05/24/2023
Objection raised — Energy
05/24/2023
Objection resolved — Addressed
05/24/2023
Objection raised — Accessibility
05/24/2023
Objection resolved — Addressed
05/24/2023
Objection raised — Admin
05/24/2023
Objection resolved — Addressed
05/24/2023
Objection raised — Admin
05/24/2023
Objection resolved — Addressed
05/24/2023
Objection raised — Other
05/24/2023
Objection resolved — Addressed
05/09/2023
Filed — Alteration
Full interior gut renovation, as well as some exterior work such as window replacement, repointing of bricks, egress stair installation, and roof repair. There will be no changes to the occupancy, egress, or use of the building.
M00845465-I1
03/22/2023
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
03/16/2023
Violation issued (HPD, closed)
A
03/16/2023
Special inspection requirement — Final
ALEX BRITO
03/16/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
02/13/2023
Permit issued — Supported Scaffold
M08044804-I1-SF
01/25/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING FOR MINOR GUTTER & FACADE REPAIR. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
M08044804-I1
11/17/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00135640-I1
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
05/10/2021
Permit issued — Sidewalk Shed
M00135640-I1-SH
04/02/2021
Violation issued (HPD, closed)
A
02/06/2020
Permit issued — Sidewalk Shed
M00135640-I1-SH
06/03/2019
Permit issued — Sidewalk Shed
M00135640-I1-SH
03/21/2019
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00135640-I1
03/21/2019
Special inspection requirement — Preliminary
asif jamil
10/10/2018
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2008
Violation issued (HPD, open)
A
06/17/2008
Violation issued (HPD, open)
A
06/17/2008
Violation issued (HPD, open)
B
06/17/2008
Violation issued (HPD, open)
B
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2006
Violation issued (ECB, closed)
Boilers
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offEASTERN GENERAL CONSTRUCT02/13/2023
DOB NOWSidewalk ShedSigned-offEASTERN GENERAL CONSTRUCT05/10/2021
DOB NOWSidewalk ShedSigned-offEASTERN GENERAL CONSTRUCT02/06/2020
DOB NOWSidewalk ShedSigned-offEASTERN GENERAL CONSTRUCT06/03/2019
BISOTISSUEDBIJOY CONSTRUCTION CORP07/10/2017
BISPLISSUEDGERARD'S PLBG & HTG CORP04/04/2017
BISFBISSUEDGERARD'S PLBG & HTG CORP04/04/2017
BISBLISSUEDGERARD'S PLBG & HTG CORP03/29/2017
BISOTISSUEDNY FRIENDLY CONST INC08/05/1999
BISOTISSUEDB.L.K. IRON & CONSTRUCTION WORK10/13/1998
BISPLISSUEDEDWARD ESBIN AND SONS ,INC.07/01/1994
BISEQISSUEDG + N ALUMINUM SIDING INC.02/07/1994
BISPLISSUEDMETROPOLITAN HEAT & POWER CO01/05/1994
BISBLISSUEDMETROPOLITAN HEAT & POWER CO01/05/1994
1 project · most recent 04/19/2024
FiledStatusContractorScope
04/19/2024——200 heads
1 project · most recent 03/28/2019
FiledStatusContractorScope
03/28/2019Permit IssuedRICHARD NEU—
1 project · most recent 11/13/2023
Steel Concrete
FiledStatusContractorScope
11/13/2023——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/19/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
12/19/2023Post-installed AnchorsSAMI HAJJAR P.Especial
09/07/2023Structural Steel - DetailsSAMI HAJJAR P.Especial
09/07/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/07/2023Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/07/2023Structural Cold-Formed SteelSAMI HAJJAR P.Especial
07/12/2023Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
07/12/2023Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/12/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/12/2023Sprayed fire-resistant materialsSAMI HAJJAR P.Especial
07/12/2023Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
07/12/2023Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/12/2023Lighting controlsSAMI HAJJAR P.Eenergy_progress
03/22/2023Sprinkler SystemsSAMI HAJJAR P.Especial
03/16/2023FinalALEX BRITOprogress
03/16/2023FinalSAMI HAJJAR P.Eprogress
03/21/2019Preliminaryasif jamilprogress
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/01/2026M08044804-I1Request digital key ↗
08/31/2026M00845465-S1Request digital key ↗
08/27/2026M00848030-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135640-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
12/12/2017123039602Open ↗
07/24/2017123039602Open ↗
06/21/2017123039602Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
07/21/2017122969519Open ↗
04/12/2017123039602Open ↗
04/12/2017123039602Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026M08044804-I1Open ↗
08/27/2026M00848030-I1Open ↗
08/27/2026M00848056-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
04/04/2017123039602Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M00135640-I1Open ↗
08/23/2026M00845465-I1Open ↗
08/23/2026M00845465-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00848056-I1Open ↗
09/01/2026M00845489-I1Open ↗
08/23/2026M00845465-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/04/2017123039602Open ↗
12/15/2016122969519Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/04/2017123039602Open ↗
12/15/2016122969519Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
12/12/2017123039602Open ↗
07/24/2017123039602Open ↗
06/21/2017123039602Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/26/2017123039602Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/04/2017123039602Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/04/2017123039602Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
04/04/2017123039602Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/29/2018122969519Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/27/2026M00848030-I1Open ↗
08/27/2026M00848133-I1Open ↗
08/13/2026M00848056-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026M00848056-I1Open ↗
08/13/2026M00845489-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
04/04/2017123039602Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
07/26/2017123039602Open ↗
07/18/2017123039602Open ↗
04/06/2017123039602Open ↗
▸BISBOROUGH INTAKE FORM2
05/29/2018122969519Open ↗
11/02/2017123039602Open ↗
▸BISEFILING COVER SHEET2
04/04/2017123039602Open ↗
12/15/2016122969519Open ↗