← Back
BuildNYC
Two family frame
507 LAMOKA AVENUE
STATEN ISLAND · BIN 5074125
💬 Discuss this project
1965Year Built
2Stories
B2Building Class
R3AZoning
2,420 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 4,400 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Interior plumbing work3p · 1 filing · 14 docs
Floor 1
CellarInterior plumbing work5p · 2 filings · 17 docs
Site & exteriorProposed temporary fence install on property line3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
430 St Marks Place203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW Professional Engineering105/04/2021
Jian Engineering202/05/2020
Ryan Design Architecture109/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ryan Design Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wai Kee ConstructionScaffold203/21/2026
St Safety ConsGeneral Contractor107/08/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
Mazco ConstructionGeneral Contractor110/15/2019
Building Lifecycle
07/29/2021
Signed off — Alteration
S00515809-I1
07/28/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/20/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/16/2021
Permit issued — General Construction
S00515809-I1-GC
05/14/2021
Objection raised — Scope
28 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSt Safety Cons06/16/2021
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating11/01/2019
DOB NOWConstruction FenceSigned-offWai Kee Construction10/14/2019
BIS—ISSUEDMazco Construction10/15/2019
1 project · most recent 11/24/2019
General Wiring
FiledStatusContractorScope
11/24/2019CompleteD and H Electrical ConstructionGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/28/2021Pass-Final General Construction Non-Directive 14PassView ↗
07/20/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/06/2020HVAC insulation and sealing Daniel Ryanenergy_progress
02/06/2020HVAC and service water heating equipment Daniel Ryanenergy_progress
02/06/2020HVAC and service water heating system controls Daniel Ryanenergy_progress
01/24/2020HVAC insulation and sealing Daniel Ryanenergy_progress
01/24/2020HVAC and service water heating equipment Daniel Ryanenergy_progress
01/24/2020HVAC and service water heating system controls Daniel Ryanenergy_progress
09/16/2019FinalJIAN DENGprogress
67 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account